SF-30_Amendment_of_Solicitation_Mod.doc
DOC document 66 KB Posted
- Attached to
- Canyon Rim Overlook Deck Replacement_Ashley NF Federal contract opportunity
- Solicitation number
- AG-84N8-S-14-0108
About this file
SF30 Amendment 1 - Site Visit Notes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_Modification_2_signed.pdf | ||
| 1_RFQ_AG84N8S140108_Canyon_rim_Overlook_Recon.doc | DOC document | |
| 3_CanyonRimDeck_Drawings_Signatures_Final3_2014_07_28.pdf | ||
| 2_CanyonRimDeck_Specifications_Final_2014_07_28.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 2 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 1 |
| 08/15/2014 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA- Forest Service R4 - Utah Acquisition Support Center 2222 West 2300 South Salt Lake City, UT 84119-2020
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
AG-84N8-S-14-0108
9B. DATED (SEE ITEM 11)
08/07/2014
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: X Contractor _ is not, X is required to sign this document and return _1_copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
This amendment is to incorporate the Site Visit notes from August 14, 2014.
Solcitation response date is NOT extended and all other terms and conditions are to remain the same.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
Elouise Fowler, Contracting Officer
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| /s/Elouise Fowler |
| 08/15/2014 |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
Canyon Rim Overlook Prebid Meeting
8/14/14
Attendees:
1. Scott Bingham – Ashley NF Forest Engineering Staff Officer
2. Skip Tippetts – Mayberry Enterprises, 801-509-5758, mayberryenterprises.us@gmail.com
3. Zack Widdison – Patriot Construction, 801-731-5240, patriotconstructionutah@gmail.com
4. Dan Richards & Architect – ADC Corp, 801-358-5343, adcdan49@gmail.com Notes:
1. Scott went over the contract drawings and requirements, bid due date, section C and price range. Important items discussed included:
a. Camping will be allowed onsite after written approval from the CO.
b. Staging of materials will be allowed in the trailhead parking area located just NW of the campground gate.
c. The Contractor will be allowed to use the FS restrooms onsite and not need to provide a porta potty.
d. No electricity is available onsite.
e. Water is currently available onsite but will be turned off based on the weather. Usually this happens early to mid. October but is based on cold weather. The water system is not designed for winter use.
f. The contractor needs to pay attention to Section M of the solicitation and their bid needs to address the evaluation criteria in Section M.
g. There is a base bid which includes the deck replacement and an optional bid item that includes the railing and rock wall on the path leading to the deck and the bench on the path to the deck. The contractor is required to give us a bid on the optional item but we are not required to award the option.
2. Questions brought up:
a. Are the 3x8 decking members nominal dimensions? Answer: Yes the 3x8 is nominal so the actual will be 2 ½” x 7 ¼” members.
b. Is the contractor required to repaint all of the existing railing that is on the path leading up to the deck? Answer: No. That is not part of the contract. The contractor will only be required to repaint the railing on the deck (and small section of stairs leading to the deck) and paint the new railing they will install as part of Option #1.
c. Do all of the holes in the lumber need to be predrilled? Answer: Sheet S1 states that “All field drilling of holes shall not be allowed unless otherwise noted on the drawings”. After speaking with the designer we will allow field drilling of holes onsite. However, the holes must be predrilled with a pilot hole of smaller size and the contractor shall ensure that the holes are drilled precisely to ensure new holes or larger holes are not drilled due to errors. Also, holes shall be poured full of preservative prior to inserting the fasteners.
File details come from the government source that posted it. Updated .