San_Antonio_Drawings.PDF
PDF 3 MB Posted
- Attached to
- Rio San Antonio Bridge Construction
- Solicitation number
- AG-83A7-S-13-0017
About this file
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CONSTRUCTION_RFP_FY13.MOD_1.doc | DOC document | |
| San_Antonio_Bridge_PreBid_Meeting_Questions Respones.docx | DOCX document | |
| CONSTRUCTION_RFP_FY13.doc | DOC document | |
| SF_25-96 1 .pdf | ||
| RSA_Bridge-FSSS.docx | DOCX document | |
| SF_24-98 1 .pdf | ||
| SF_25A-98 1 .pdf | ||
| wagerates.mht | MHT file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. DATEBYREVISION DESCRIPTION
SHEET NO.
SET NO.
PROJECT:
DATE:SHEET INDEX
PROJECT LOCATION
SHEET 1 COVER
SHEET 2 TYPICAL SECTIONS AND ESTIMATED QUANTITIES
SHEET 3 ROAD PLAN AND PROFILE
SHEET 4 STREAM PLAN & PROFILE
SHEET 5 BRIDGE PROFILE
SHEET 6 STREAM DIVERSION AND DEWATERING PLAN
SHEET 7 FOUNDATION SITE PLAN
SHEET 8 ABUTMENT PLAN AND ELEVATION
SHEET 9 15° WINGWALL DETAILS
SHEET 10 60° WINGWALL DETAILS
SHEET 11 ABUTMENT DETAILS
SHEET 12 SUPERSTRUCTURE PLAN AND DETAILS
SHEET 13 SUPERSTRUCTURE DETAILS
SHEETS 14 - 15 ROADWAY CROSS-SECTIONS
SHEETS 16 - 17 CHANNEL CROSS-SECTIONS
MARCH 29, 2012
1-11196
RIO SAN ANTONIO BRIDGE
ROAD NO. 87 - M.P. 8.3
CONSTRUCTION PLANS FOR
SECTION 6, TOWNSHIP 30 NORTH, AND RANGE 8 EAST
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION THREE
CARSON NATIONAL FOREST
TRES PIEDRAS RANGER DISTRICT
RIO ARRIBA COUNTY, NEW MEXICO
PLANS PREPARED BY:
JONATHAN WEAVER, E.I.
KARL YAKAWICH, P.E.
QA/QC BY:
WILLIAM B. LLOYD, P.E.
R
IO
S A
N A
N T
O N
IO
DATE
DATE
DATE
-WASTE SITE
APPROVED:
RECOMMENDED:
APPROVED:
THIS PROJECT
NOTE:
DRAWING SCALE IS ONLY ACCURATE
WHEN PLANS ARE PLOTTED ON 11" X 17"
(TABLOID)-SIZED PAPER.
Farmington
Taos
Santa Fe
Albuquerque Tucumcari
Clayton
Ruidoso
Roswell
Deming Lordsburg
Silver City
Las Cruces Carlsbad
Hobbs
Gallup
Raton
Clovis Socorro
A R
IZ
O
N A
COLORADO
T E
X A
S
TEXAS
MEXICO
PROJECT LOCATION
88A
78A
RIO SAN ANTONIO BRIDGE
TYPICAL SECTIONS AND ESTIMATED QUANTITIES
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
2 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
SPECIFICATIONS:
DESIGN SPECIFICATION:
HYDROLOGY & HYDRAULICS:
PERMITTING REQUIREMENTS:
DISPOSAL:
CLEARING AND GRUBBING:
CONCRETE FOR ABUTMENTS, WINGWALLS, AND CURBS :
PRESTRESSED CONCRETE:
REINFORCING STEEL:
PRESTRESSING STEEL:
PRESTRESSED CONCRETE MEMBERS:
FINISHING CONCRETE MEMBERS:
FABRICATION, TRANSPORT, AND INSTALLATION OF PRESTRESSED CONCRETE BEAMS:
PAINTING OF WELD TIE CONNECTIONS AND GUARD ANGLES:
HARDWARE AND STRUCTURAL STEEL:
BEARING PADS:
EVAZOTE JOINT MATERIAL:
PRECAST PRESTRESSED CONCRETE SUPERSTRUCTURE ALTERNATIVES:
ITEM NO. DESCRIPTION
METHOD OF
MEASUREMENT
UNIT QUANTITY
15101 MOBILIZATION LSQ LS 1
15221 CONSTRUCTION SURVEY AND STAKING LSQ LS 1
15713 SOIL EROSION AND POLLUTION CONTROL LSQ LS 1
15722 DEWATERING AND STREAM DIVERSION LSQ LS 1
20411 EMBANKMENT CONSTRUCTION CQ CY 425
20806 STRUCTURE EXCAVATION LSQ LS 1
20807 FOUNDATION FILL CQ CY 140
25101 PLACED RIPRAP, CLASS 6 CQ CY 120
30111 AGGREGATE SURFACE COURSE CQ CY 80
55301
PRESTRESSED CONCRETE STRUCTURAL MEMBER,
DOUBLE TEE BEAMS WITH CURBS
LSQ LS 1
55304
PRECAST CONCRETE MEMBER, VERTICAL ABUTMENTS
AND WINGWALLS
LSQ LS 1
62201 HYDRAULIC EXCAVATOR WITH THUMB AQ HR 16
62501 SEEDING, DRY METHOD CQ ACRE 0
63305 POSTS, STEEL CQ LF 36
63306 OBJECT MARKERS, TYPE 3 CQ EA 4
64808 CHANNEL EMBANKMENT CQ CY 270
64809 STABILIZED BANK CQ CY 135
PHOTO OF EXISTING CULVERT CROSSING
*INFORMATIONAL ONLY - NOT FOR BIDDING PURPOSES - REFER TO BID SCHEDULE
POINT NORTHING EASTING ELEVATION DESCRIPTION
CP100 2,132,569.13 1,676,382.14 8,825.61 REBAR W/ ALUM. CAP
CP101 2,133,168.04 1,676,822.08 8,826.85 REBAR W/ ALUM. CAP
CP102 2,132,373.33 1,676,500.04 8,825.74 REBAR W/ ALUM. CAP
RIO SAN ANTONIO BRIDGE
ROAD PLAN AND PROFILE
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
3 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
ROAD NO. 87
RIO
S
AN A
NTONIO
STREAM PLAN & PROFILE
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
4 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
ROAD NO. 87
RIO SAN ANTONIO
DESCRIPTION NORTHING EASTING ELEVATION
STA. 54+28.00 BEGIN CHANNEL WORK 2,132,533.74 1,676,548.47 8,809.14
STA. 54+40.00 2,132,545.35 1,676,545.42 8,809.24
STA. 54+60.00 2,132,564.69 1,676,540.34 8,809.42
STA. 54+80.00 2,132,584.04 1,676,535.25 8,809.60
STA. 55+00.00 2,132,603.38 1,676,530.17 8,809.78
STA. 55+20.00 2,132,622.72 1,676,525.09 8,809.95
STA. 55+40.00 2,132,642.07 1,676,520.01 8,810.13
STA. 55+60.00 2,132,661.41 1,676,514.93 8,810.31
STA. 55+80.00 2,132,680.75 1,676,509.84 8,810.48
STA. 55+88.00 END CHANNEL WORK 2,132,688.41 1,676,507.53 8,810.55
SYMBOL NAME / BID ITEM QUANTITY MATERIAL
SPECIFICATION
NOTES
STRUCTURE EXCAVATION
(ITEM 20806) 800 CY N/A
SUITABLE STRUCTURE EXCAVATION MATERIAL MAY BE UTILIZED FOR ROADWAY
EMBANKMENT OR STRUCTURAL BACKFILL. UNSUITABLE MATERIAL SHALL BE DISPOSED
OF AT GOVERNMENT FURNISHED WASTE SITE.
ROADWAY EMBANKMENT
(ITEM 20411) 425 CY 704.06
CONTRACTOR MAY USE SUITABLE (i.e. MEETING SPECIFICATIONS) ONSITE MATERIAL
FROM STRUCTURE EXCAVATION AND/OR ROADWAY EXCAVATION FOR EMBANKMENT
CONSTRUCTION. ALL EMBANKMENT MATERIAL MUST BE APPROVED BY THE C.O.
BEFORE PLACEMENT. ADDITIONAL EMBANKMENT SHALL BE CONTRACTOR FURNISHED.
STRUCTURAL BACKFILL
(ITEM 20806) 485 CY 704.04
CONTRACTOR MAY USE SUITABLE (i.e. MEETING SPECIFICATIONS) ONSITE MATERIAL
FROM STRUCTURE EXCAVATION AND/OR ROADWAY EXCAVATION FOR STRUCTURAL
BACKFILL. ALL BACKFILL MATERIAL MUST BE APPROVED BY THE C.O. BEFORE
PLACEMENT. ADDITIONAL STRUCTURAL BACKFILL SHALL BE CONTRACTOR FURNISHED.
FOUNDATION FILL
(ITEM 20807) 140 CY 704.01 CONTRACTOR FURNISHED.
CLASS 6 RIPRAP
(ITEM 25101) 120 CY 705.02 CONTRACTOR FURNISHED.
CHANNEL EMBANKMENT /
STREAMBED SIMULATION,
BED CLASS 4 (ITEM 64808)
270 CY 705.07 CONTRACTOR FURNISHED.
STABILIZED BANK
(ITEM 64809) 135 CY 705.02
CONTRACTOR FURNISHED RIPRAP AND 6" MINUS EXCESS EXCAVATION MATERIAL
MIXED PER DETAIL B/4.
RIO SAN ANTONIO BRIDGE
BRIDGE PROFILE
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
5 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
STREAM DIVERSION AND DEWATERING PLAN
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
6 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
ROAD NO. 87
RIO SAN ANTONIO
FOUNDATION SITE PLAN
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
7 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
RIO
S
AN A
NTO
NIO
ROAD NO. 87
POINT NORTHING EASTING ELEVATION DESCRIPTION
2000 2,132,592.15 1,676,486.65 8,806.63 BOTTOM OF WINGWALL FTG.
2001 2,132,599.65 1,676,486.69 8,806.63 BOTTOM OF WINGWALL FTG.
2002 2,132,597.34 1,676,498.44 8,806.63 BOTTOM OF ABUTMENT FTG.
2003 2,132,580.26 1,676,508.19 8,806.63 BOTTOM OF ABUTMENT FTG.
2004 2,132,569.68 1,676,513.05 8,806.63 BOTTOM OF WINGWALL FTG.
2005 2,132,567.78 1,676,505.80 8,806.63 BOTTOM OF WINGWALL FTG.
2006 2,132,661.45 1,676,524.84 8,806.63 BOTTOM OF WINGWALL FTG.
2007 2,132,663.36 1,676,532.09 8,806.63 BOTTOM OF WINGWALL FTG.
2008 2,132,650.88 1,676,529.70 8,806.63 BOTTOM OF ABUTMENT FTG.
2009 2,132,633.80 1,676,539.45 8,806.63 BOTTOM OF ABUTMENT FTG.
2010 2,132,631.49 1,676,551.21 8,806.63 BOTTOM OF WINGWALL FTG.
2011 2,132,638.99 1,676,551.24 8,806.63 BOTTOM OF WINGWALL FTG.
2012 2132588.799 1676503.316 8,806.63 CL BEARING,
BOTTOM OF ABUTMENT FTG.
2013 2132642.34 1676534.578 8,806.63 CL BEARING,
BOTTOM OF ABUTMENT FTG.
PT. # 2000
PT. # 2001
PT. # 2002
PT. # 2005
PT. # 2004
PT. # 2003
PT. # 2011
PT. #
PT. # 2009
PT. # 2008
PT. # 2006
PT. # 2007
PT. # 2013
PT. # 2012
ABUTMENT PLAN AND ELEVATION
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
8 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
15° WINGWALL DETAILS
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
9 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
60° WINGWALL DETAILS
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
10 OF 17JW/KY
JW
KY
WL
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
ABUTMENT DETAILS
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
11 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
ABUTMENT FILL FACE
WINGWALL FILL FACE
ABUTMENT
FILL FACE
SUPERSTRUCTURE PLAN AND DETAILS
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
12 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
PRESTRESSED CONCRETE BEAM DESIGN:
DESIGN NOTES AS FOLLOWS:
CURB NOTES:
SUPERSTRUCTURE DETAILS
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
13 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
ROADWAY CROSS-SECTIONS
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
14 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
ROADWAY CROSS-SECTIONS
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
15 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
POINT NORTHING EASTING ELEVATION
STA. 3+02.86 BEGIN ROADWORK 2,132,484.67 1,676,442.52 8,822.92
STA. 3+20.00 2,132,499.48 1,676,451.16 8,822.12
STA. 3+40.00 2,132,516.75 1,676,461.25 8,821.40
STA. 3+70.00 2,132,542.65 1,676,476.37 8,820.78
STA. 4+00.00 2,132,568.56 1,676,491.50 8,820.70
STA. 4+23.43 CL BEARING 2,132,588.80 1,676,503.31 8,821.00
STA. 4+85.43 CL BEARING 2,132,642.34 1,676,534.58 8,821.00
STA. 5+20.00 2,132,672.19 1,676,552.01 8,820.32
STA. 5+40.00 2,132,689.46 1,676,562.09 8,819.92
STA. 5+60.00 2,132,706.73 1,676,572.18 8,819.52
STA. 5+80.00 2,132,724.01 1,676,582.26 8,819.12
STA. 6+00.00 2,132,741.28 1,676,592.34 8,818.72
STA. 6+20.00 2,132,758.55 1,676,602.43 8,818.34
STA. 6+40.00 2,132,775.82 1,676,612.51 8,818.08
STA. 6+60.00 END ROADWORK 2,132,793.09 1,676,622.60 8,817.95
CHANNEL CROSS-SECTIONS
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
16 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
CHANNEL CROSS-SECTIONS
ROAD NO. 87 - M.P. 8.3
CARSON NATIONAL FOREST
1-11196 MARCH 29, 2012
SHEET NO.
17 OF 17JW/KY
JW
KY
WL
REGION THREE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
File details come from the government source that posted it. Updated .