task_order.pdf

PDF 117 KB Posted

Attached to
HT26 RMEF SAGE MOWING
Solicitation number
AG-82X9-S-13-9001
Issued by

About this file

TASK ORDER

View the file

Other files

File Type Posted
CAM.pdf PDF
76-1351_40.mht MHT file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WR IDIQ Stewardship – FY12 Task Orders Page 1 of 16 AG-82X9-S-12-9005

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE 1 OF

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

2. CONTRACT NO. 3. AWARD/EFFECTIVE 4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICIATION ISSUE

DATE

AG-82X9-S-13-9001

DATE

10/3/2012

a. NAME b. TELEPHONE NUMBER(No collect 8. OFFER DUE DATE/

7. FOR SOLICITATION

JOE MILBURN calls) LOCAL TIME

INFORMATION CALL: 970‐385‐1316 10/25/12 1530

9. ISSUED BY CODE 10. THIS ACQUISITON IS

UNRESTRICTED OR

SET ASIDE: % FOR

SMALL BUSINESS EMERGING SMALL

BUSINESS

NAICS: 115310 HUBZONE SMALL

BUSINESS

SIZE STANDARD: $17.5 million SERVICE-DISABLED VETERAN- 8(A)

OWNED SMALL BUSINESS

Forest Service Rocky Mountain Acquisition Service Team Durango Office 15 Burnett Court Durango, CO 81301

11. DELIVERY FOR FOB DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A RATED

ORDER UNDER DPAS (15 CFR 700)

13b. Rating

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17A. CONTRACTOR/OFFEROR CODE FACILITY

CODE

18a. PAYMENT WILL BE MADE BY CODE

Albuquerque Service Center – Miscellaneous Payments 101B Sun Ave NE Albuquerque, NM 87109

DUNS:

Email:

TELEPHONE NO:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

OFFER IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM N0. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

White River IDIQ Stewardship - FY12 Task Orders

This Task Order is set aside for those contractors who were awarded a White River IDIQ Stewardship Master Contract.

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _________ 29. AWARD OF CONTRACT: REF. ________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY DATED_______________________ , YOUR OFFER ON SOLICITATION ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.3/2005)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

Solicitation No. AG-82X9-S-13-9001

HT26 RMEF Sage Mowing Task Order

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

Amount

SEE ATTACHED SCHEDULE OF ITEMS

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: __________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT 37. CHECK NUMBER

PARTIAL FINAL

COMPLETE PARTIAL FINAL

38. S/R ACCOUNT

NUMBER

39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print) 41 b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41 c. DATE 42b. RECEIVED AT (Location)

42c. DATE RECD (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV.3/2005) BACK

HT26 RMEF Sage Mowing TASK ORDER

B.1 PRICING FOR SCHEDULE OF SUPPLIES/SERVICES

ITEM

N0.

SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT

PRICE

AMOUNT

Base Item

1a

Mow sagebrush (25%) to an average height of 12 inches above dry ground level.

(Units 1, 2 and 4)

Acre

S________

Optional Item 1b

Mow sagebrush (25%) to an average height of 12 inches above dry ground level.

(Unit 3)

9.1

Acre

Total Price

AWARD – Award will be made to the low, responsive, responsible quoter.

SHOW ME TRIP – OCTOBER 15, 2012 – 9:30 AM.

Meet at the Holy Cross District Office, 24747 US Highway 24, Minturn, CO 81645

B.2 TIMBER REMOVAL PRICE SCHEDULE:

No timber removal included in this task order.

WORK ACTIVITY ITEMS – TERMS AND SPECIFICATIONS

1. Scope of Work

This solicitation describes the contract requirement and specifications for services for a performance based, fixed price contract for mowing 25% of sagebrush in the cutting units within the WRNF IDIQ Haztree and Fuels – HT26 RMEF Sage Mowing Task Order. This task order requires vegetation manipulation in compliance with its terms, specifications and provisions. The contractor shall provide any and all labor, supervision, transportation, operating supplies, equipment, services, permits, insurance, licenses and incidentals required to mow sagebrush on approximately 118.1 acres of National Forest System Lands within the contract area on the Eagle/Holy Cross Ranger District of the White River National Forest.

Complete all work by March 1, 2013.

The services in this contract are designed to:

1) Improve public and firefighter safety by reducing the risk of people or property from fire hazard

2) Minimize the effects of sagebrush mortality on the overall health, scenic quality, and condition of shrubland areas

3) Improve wildlife habitat by removing decadent and dead sagebrush

The timber harvest and removal requirements of this contract are outlined here and in the solicitation.

Appendix A is not applicable.

2. Project Location and Description

Project Location Description – This project is on the White River National Forest. The HT26 RMEF Sage Mowing contract area is located approximately 1 mile north of Edwards, Colorado. The project can be accessed from Interstate I-70 by going north from the Edwards Exit 163, west on Beard Creek Road for 0.5 miles, north on Moon Ridge Road to FSR 774.1 and FSR 780.1.

An alternate access is from the West Avon Exit 167, west on Nottingham Road, north on Metcalf Road, west on West Wildridge Road, West on Old Trail Road, West on June Creek Trail to FSR 717.1B.

Legal location is portions of un-surveyed Sections 32, 33 and 34, T.4S, R82W, 6th P.M., Eagle County, Colorado.

See Attachment for Map.

a) Project Description – The project, as described, includes mowing 25% of sagebrush in each cutting unit to an average height of 12 inches above dry ground level in a manner that creates patches that are narrow in width, discontinuous, non-linear, and results in a mosaic landscape pattern on National Forest System lands. The following table shows the estimated quantities and units of work.

Access Road #

Road Name Cutting unit #

Est.

Acres

NFSR

780.1

Powerline 1 20.9

NFSR 774 Berry Creek 2 17.5

NFSR

717.1A

Dead Buck Reservoir

3 9.1

NFSR

717.1A

Dead Buck Reservoir

4 70.6

Total 118.1

b) Accessibility –All work areas on Forest System Roads may be reached by Forest or County roads that are accessible by high clearance four-wheel drive pickup during normal operating season. Contractor shall be required to keep vehicles on established roads. The Forest Service assumes no obligation to plow snow or do special maintenance to keep roads open. Spring and fall road conditions usually necessitate the use of a 4-wheel drive vehicle. During the fall/winter and spring break up the Forest Service reserves the right to suspend mowing operations to protect forest road surfaces.

c) Restrictions – Timber removal specifications and road maintenance specifications do not apply. Other project specific restrictions may be included in the solicitation.

1) Temporary trail closures on NFST 780.1A (1 day to 2 weeks) to the public may be approved during contractor operations. Applies only to cutting unit 1.

2) Ground-based mechanical equipment is prohibited within 100 feet of streams, wetlands or riparian areas. In cutting units 1 and 4, do not mow sagebrush within 100 feet of streams, wetlands or riparian areas.

3) Ground-based mechanical equipment is prohibited from operating over wet or saturated soils

(operating over snow with an average depth of 3” or more is allowed).

4) Ground-based mechanical equipment shall avoid noxious weed patches and Harrington penstemon plants (Penstemon harringtonii). Known locations are marked on the contract area map and marked with stripped flagging on the ground.

5) Roads shall be maintained for through traffic during mowing operations.

6) Roads shall be left in an operational condition that will adequately accommodate traffic at the end of each work day.

7) In cutting unit 1, to minimize conflicts with recreational traffic and to provide for public safety sagebrush mowing treatments will be restricted on weekends (Saturday and Sunday) and federal holidays, unless otherwise agreed to in writing.

Boundaries – Cutting unit boundaries for unit 1 are marked with yellow flagging. Cutting unit boundaries for units 2, 3 and 4 are marked with blue flagging.

The contract area encompasses approximately 980 acres.

3. Contractor-furnished Equipment and Services

a) The Contractor shall provide sufficiently skilled labor, experienced supervision, transportation, equipment, operating supplies, incidentals and inspection services, except those items listed as Government-Furnished property, to perform the work in compliance with the contract.

b) The Contractor shall notify the CO/COR of any changes in work schedule.

4. Definitions

a) Acceptable Quality Level (AQL) – The maximum percentage or proportion of nonconformities in a lot or batch that can be considered satisfactory as a process average.

b) Average Spacing – The distance in feet between leave trees as defined in the thinning specifications.

c) Accessible - Road access to a unit. Unit will be considered accessible when road access is within 1/2 mile of the unit.

d) Basal Area – The cross section of a tree at dbh, measured as square feet per acre, a measure of stand density.

e) Biomass – Any portion of a tree (trunks, branches and tops) not meeting merchantability specifications for sawtimber and POL including 1.) topwood from POL and sawtimber; 2.) any residue material from cut trees; 3.) any trees removed less than the minimim diameter for POL products, 4.) any material removed in the form of chips or mulch.

f) Biomass Material (Included in Division A) - Sawlog and POL topwood to 3.0” DIB for all species and defect portions of each product to a 3.0” top.

g) Biomass Material (Subject to Agreement) - Any portion of a tree (trunks, branches and tops), non-merchanteable trees, dead down logs or trees; where the anticipated product is wood chip fuel or mulch. This material includes non-sawlog quality products.

h) Bucking – The cutting of tree boles to a designated length. Bucking requires saw to pass completely through the tree bole.

i) Canopy Cover – The percentage of a fixed area covered by crowns of plants delimited by a vertical projection of the outermost perimeter of the spread of foliage.

j) CCF – hundred cubic feet

k) Chipping – The reduction of woody residue by a portable chipper to chips that are left to decay on the forest floor, or removed to produce pulp, hog fuel, etc.

l) Conifer – A cone-bearing tree with needles or leaf scales, usually evergreen, (e.g. pines, fires, spruces, junipers).

m) Contracting Officer (CO) – A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

n) Contracting Officer Representative (COR) – A Government employee appointed by the Contracting Officer (CO) to help the CO with the contract administration and surveillance.

o) Contractor – Term used to represent the prime individual or organization that is awarded the contract, who is also responsible for the work and conduct of all partners, employees, equipment, and subcontractors assigned by the prime to perform on the contract.

p) Created Slash - Debris created from work under this contract including all cut trees and their tops, trunks, and branches.

q) Cultural and/or Threatened and endangered (T&E) Sites – Locations where special protection is required to preserve and protect cultural values and species of plants or animals listed on the T&E list.

r) Cut Trees – Trees designated for cutting. Cut trees include diseased, damaged, defective trees and undesirable species provided in the specifications.

s) Damage Trees and/or Defective Trees - Includes any defect of deformity of a trees resulting from such agents as wind, snow, animals, insects, disease, and equipment; and evidenced by such things as dead or broken tops or trunks, crooks, forks, and deep scars. Examples of excessive damage and unhealthy conifers:

a. Trees with crook, sweep, or snow bend (damaged). Crooks or bends in the main bole which are less than 9 feet from the ground and offset more than 45 degrees from the vertical axis.

b. Leaner Trees –Leaner trees are those where the main bole is offset more than 45 degrees from the vertical axis.

c. Damaged Trees –

i. Trees that have been severely scarred or cut through the cambium for ½ or greater the circumference of the tree.

ii. Trees with broken boles up to 9 feet high or more than two thirds of the live limbs are broken or missing.

iii. Trees that have been pushed over or are partially uprooted.

t) DBH (Diameter at Breast Height) – Outside diameter of the tree stem at a point 4-1/2 feet above the ground, measured from the high side of the base of the tree.

u) Deck – An organized stack of trees or logs.

v) Decked Timber – designated trees or portions of trees accumulated from skidding and/or yarding operations which are stored in organized piles at landing locations prior to being loaded and hauled to a manufacturing facility.

w) Diameter Stump Height – Outside diameter of tree stem measured from the maximum stump height allowed in Division A. Generally 12” from ground level for sawlogs and 4” from ground level for Products other than Logs or Biomass.

x) DIB (Diameter Inside Bark) - Diameter measurement of a standing tree or log in which the estimated or actual thickness of the bark is discounted.

y) Erosion control – Activities designed to prevent/reduce the delivery of sediment to area streams as a result of road building and/or timber harvest. Activities typically include grass seeding and/or installation of structures to trap moving sediment.

z) Excess Trees:

a. All uncut trees not needed to meet average spacing requirements and those trees defined as cull trees.

b. Trees suspended in or leaning into leave trees.

c. Trees not completely severed from the stump.

d. Trees not cut below the lowest live limb.

e. Stumps taller than specifications.

aa) Existing Down Wood – Woody material that is dead and lying on the forest floor, pre-existing to present management activity.

bb) Felling corridor - The felling corridor is defined as an area along the length of roads, trails, trailheads, developed recreation sites and administrative sites the width of “the height of the tallest tree plus an additional 10 percent for a safety margin, provided no trees fall on the roadway, ditch, and/or cut or fill slope.”

cc) Fuel Loading - Weight of hazardous fuels per unit area.

dd) Hand Felling – severing a tree at a designated height with a chainsaw or other hand held tool.

ee) Hand Pile – Hand placement of slash into compact piles not less than 300 cubic feet or approximately 10’W x 10’L x 7’H.

ff) Haul or Hauling - transporting all included timber or forest products from landing to final disposal point.

gg) Hazard - The existence of a fuel complex that constitutes a threat of wildfire ignition, unacceptable fire behavior and severity, or suppression difficulty.

hh) Hazardous Fuels-All live and dead trees (including tops, limbs and branches), excess trees, existing down wood and damaged trees designated for removal.

ii) Hazard Reduction - The planned treatment or manipulation of naturally growing vegetation or any other flammable material for the purpose of reducing rate of spread and output of heat energy from any wildfire occurring in the area treated.

jj) Hazard Tree - any tree that may fail due to a structural defect and, as a result, may cause property damage or personal injury. Tree failure is difficult to predict with certainty due to the complex interaction between a tree and its environment. Every tree will eventually fail; therefore, knowledge of tree species, site characteristics, and local weather conditions and patterns are essential when evaluating tree hazards. A defective tree is hazardous only when its failure could result in damage to something of value.

1) The following tree specific criteria will be used to determine hazardous trees:

a) Dead trees of any species.

b) Trees with significant defects

c) Canker rots

d) Root rots

e) Trunk Injuries (mechanical damage, stem decay, etc.)

f) Crown defects (broken or damaged branches, forked tops, dead tops, etc.)

g) Exposed damaged roots in cut banks of roads/trails

h) Dying lodgepole pine trees

1. About 1/3+ dead limbs and branches

2. Foliage transparency 40% (thin crown, off-color, or dwarfed foliage)

3. Borer attacks obvious and abundant - the presence of insect activity, such as bark beetles or mountain pine beetles, may indicate that a tree has been weakened by other agents

kk) Landing – A cleared area to which logs are yarded or skidded for loading onto trucks for transport.

ll) Landing Pile – logging slash that is piled at the landing. See also Machine Pile for size limitations.

mm) Leave Tree – Any live tree that is selected or required to be left standing as provided in the specifications.

nn) Level of Difficulty – An evaluation of the site condition that requires varying amounts of time and effort to complete a task.

oo) Linear Foot-Twelve (12) inches.

pp) Limb and Top Removal – The moving, during yarding/skidding, of cut tree with tops to a designated location.

qq) Live Crown Ratio – Percent of live crown in relation to the total height of the tree.

rr) Load or Loading - process of transferring forest products decked at landings on log trucks or similar vehicles for transportation.

ss) Logging Slash – Any portion of a tree (tops, limbs, branches, cull) that does not meet merchantability specifications for sawtimber or POL and is not removed from the area after completion of a harvest operation.

tt) Lopping and Scattering – The cutting of branches from the tree bole and the moving and/or rearranging of slash to meet a specified slash height.

uu) Lop and Scatter Pull Back- the cutting of branches from the tree bole and placing them a minimum described distance from an area.

vv) Masticate – mechanical destruction of undesirable vegetation, which may include but is not limited to mowing, mulching, chipping, chewing, grinding, etc.

ww) Mechanized - Use of motorized equipment to perform logging operations.

xx) Machine Pile – A method of piling slash with the use of mechanized equipment. Piles shall be compact and free of dirt. Maximum size 45’L x 20’W x 15’H equaling approximately 7068 cubic feet.

yy) Mastication (Masticate) - The mowing/mulching/chipping of undesirable vegetation. Slash created during mastication shall not exceed 6 inches diameter and 36 inches in length and shall be spread to a depth of no more than 6 inches in depth.

zz) Merchantability Specifications - R2 Supplement 2409.12-2010-2, 02/17/10

Species Product (Live & Dead)

DBH

(inch)

DIB

(inch)

Min.

Piece (ft)

Merchantability Factor

Lodgepole pine (LP) Sawtimber 7.0 6.0 8.0 10.67 or 34% sound

Engelmann spruce (ES) Sawtimber 8.0 6.0 8.0 10.67 or 34% sound

Blue Spruce (BS) Sawtimber 8.0 6.0 8.0 10.67 or 34% sound

Douglas Fir (DF) Sawtimber 8.0 6.0 8.0 10.67 or 34% sound

Sub-alpine fir (TF) Sawtimber 8.0 6.0 8.0 10.67 or 34% sound

Aspen (AS) Sawtimber 5.0 5.0 8.0 10.67 or 34% sound

LP POL 5.0 4.0 N/A N/A

ES,BS,DF,TF POL 5.0 4.0 N/A N/A

All Biomass VAR VAR VAR N/A aaa) Mowing – the mechanical manipulation of vegetation cut to a specified height above ground.

bbb) Non-saw timber – Trees to be cut that are less than 7.0” DBH.

ccc) Normal Operating Season– Generally, ground conditions are favorable for logging operations

June 20-October 31, annually. This time period may be extended or shortened based on local ground conditions. See also Operating Season.

ddd) Operating Season– Time period when logging operations may be conducted when ground conditions are suitable to protect soil/hydrology, watershed, recreation and wildlife resources.

Restrictions pertaining to logging operations are provided for in Design Criteria associated with soils, watershed, recreation and wildlife resources.

eee) Performance Requirements Summary (PRS) – Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the contractor.

fff) Products Other than Logs (POL) – Trees to be cut that are greater than or equal to 5.0” DBH and less than 6.9” DBH.

ggg) Removal – Transportation of cut whole trees, boles, slash, and/or equipment on designated haul roads from landings within the contract area to be completely off of the National Forest, usually within a specified time frame.

hhh) Reserve Trees – Individual species of trees within a treatment unit that the contract or COR designates are reserved from treatment.

iii) Roadside – A general term denoting the area adjoining the outer edge of the roadway.

jjj) Salvage - The removal of dead trees or trees damaged or dying because of injurious agents other than competition, to recover economic value that would otherwise be lost.

kkk) Shrubland – A plant community in which, in contrast to a typical forest, the trees are often small, characteristically short-boled relative to their crown depth, and forming only an open canopy with the intervening area being occupied by lower vegetation, commonly grass.

lll) Skidding – The yarding of trees or logs by pulling or towing them across the ground.

mmm) Slash – See logging slash.

nnn) Slash Removal- All created slash to be removed from contract area.

ooo) Slashing – Reducing the height and continuity of hazardous fuels to meet a specified slash objective.

ppp) Snag - A standing dead or living tree that has 10 percent or less live crown.

qqq) Sorting – arrange timber or logs according to forest product characteristics rrr) Spacing – The horizontal distance from the trunk of one leave tree to the trunk of the next nearest leave tree.

sss) Special Protection Area - A zone that has special characteristics such as riparian vegetation, wildlife calving areas, etc. Special protection areas are noted on the project maps and they may require special treatment such as an alteration to the tree cutting, slash treatment, vehicle travel, or fueling of saws.

ttt) Stream Course - The area along a stream that has riparian vegetation and other riparian characteristics. Stream courses are noted on the project maps. They typically require special treatment which may include alteration to the tree cutting, slash treatment, vehicle travel, or fueling of saws.

uuu) Stump – The lower end of a tree remaining in the ground after the tree has been cut.

vvv) Stump Height – The acceptable maximum stump level left above ground, measured from the uphill side, after a tree is felled.

www) Sub-merchantable – Trees or portions of trees that do not meet merchantability specifications for sawtimber or POL. This includes trees less than 5.0” DBH, topwood and defect (cull) associated with designated timber.

xxx) Surplus Vegetation/Slash – Surplus vegetation includes standing vegetation (conifers and hardwoods) greater than 1 foot tall and shrubs less than 12 inches diameter at ground level; when not selected as leave trees, reserved, or needed to meet spacing requirements. Standing dead conifers, hardwoods, and shrubs shall be included as surplus when not reserved. Surplus vegetation becomes slash when it is cut. Slash can include any existing natural (dead and down) woody debris.

yyy) Temporary Roads – Roads other than Specified Roads that are constructed by the Contractor for the purpose of transporting harvested timber out of the units.

zzz) Tons/Acre - Unit of measurement of fuel, usually but not always, of dead and down woody debris (slash). Tons/Acre is generally determined by using a Photo Series, such as USDA Forest Service RMRS GTR-172 (2006). These documents are available for review by the contractor by contacting the issuing office.

aaaa) Total Percent Cover – Portion of the project area or treatment unit beneath the dripline of vegetation to be cut, Does not include reserve vegetation.

bbbb) Tree Designation – the method of identifying which trees are specified to be cut or left under the contract.

cccc) Water Bar – A drainage structure constructed across the surface of a road, skid trail, or constructed fireline to divert water from the surface. The purpose is not to block vehicular passage.

dddd) Water Influence Zone (WIZ) - The land next to water bodies where vegetation plays a major role in sustaining long-term integrity of aquatic systems. It includes the geomorphic floodplain (valley bottom), riparian ecosystem, and inner gorge. Its minimum horizontal width (from top of each bank) is generally 100 feet or the mean height of mature dominant late-seral vegetation, whichever is most.

eeee) Wetland - A transitional area between aquatic and terrestrial ecosystems that is inundated or saturated for periods long enough to produce hydric soils and support hydrophytic vegetation.

ffff) Wildlife Trees - Standing dead or live trees left for nesting, feeding, perching and shelter for birds and mammals. Trees may be marked with paint and/or designated with a tag stating it is a wildlife tree or as identified by the Forest Service.

gggg) Whole Tree Removal – remove Standard Timber (C1.1) and portions of Standard Timber that do not meet Utilization Standards in A Division for all designated trees 7.0 inch DBH and greater to a 3 inch top; and, all designated trees 5.0-6.9 inch DBH to a 3 inch top.

hhhh) Whole Tree Yarding - after severing tree from stump, the moving or skidding of the entire tree (bole, limbs, tops) to a landing location for removal.

iiii) Woodland – A plant community in which, in contrast to a typical forest, the trees are often small, characteristically short-boled relative to their crown depth, and forming only an open canopy with the intervening area being occupied by lower vegetation, commonly grass.

jjjj) Yard tops attached – The moving, during yarding/skidding, of cut tree with tops to a designated location at the landing.

kkkk) Yarding - The movement of logs from the place they are felled to a landing. Generally implemented using mechanical equipment.

5. Performance Standards

Sagebrush Mowing and Hazardous Fuels Reduction.

Proposal shall include the use of ground base equipment to accomplish task. Forest product removal is not anticipated within mowing units. Ground based equipment shall not be permitted on slopes greater than 40 percent or within 100 feet of the streamcourses designated on the contract area map.

5.1 Task – Sagebrush Mowing and Hazardous Fuels Reduction:

Sagebrush will be mowed in an organized manner within the cutting units. It is anticipated that mechanized machinery will be used to accomplish mowing task. The Forest Service will determine the width of the treatment by designation through marking or by description.

5.1.1 Mowing Methods

a) Mow 25% of the sagebrush in each cutting unit.

b) Mow in a manner that maintains an average sagebrush height of 12 inches above dry ground level on site.

c) Mow in a manner that creates patches that narrow in width, non-linear, discontinuous and results in a mosaic landscape pattern.

5.1.2 INOPERABLE AREAS

In-operable areas within stands designated for treatment. The contractor shall identify on the ground with flagging all areas deemed to be in-operable for safe operations in service work activities. If the government agrees that the area is in-operable the contractor may: 1) Propose an alternate treatment that alleviates the safety concern; if the government agrees with the proposal the area will be treated as agreed and the contractor will receive full payment at the normal contract rate, or 2) Request that the area be removed from the contract, in which case the government will use GPS or tally the designated trees to measure the affected area and remove it from the contract. The contractor will receive no payment for in-operable areas that are removed from the contract. For payment purposes in-operable areas that are removed from the contract will be rounded to the nearest ¼ acre if based on an acreage estimate.

6. Government Quality Assurance Surveillance Plan

Inspection of the area shall be accomplished by periodic visual inspection of the unit and will be based on adherence to the contract specifications. Full payment will be made if all work in the area meets the acceptable quality level for task. Disincentive is Contractor rework to meet the 100% objective.

7. Performance Work Summary Table

Task Performance

Standard

Quality Assurance

Process

Acceptable Quality Level

(AQL)

Incentive/Disincentive

1. Mow sagebrush

All mowing will meet contract specifications stated in the Performance Standards table.

Contractor records and reports and Government Periodic Visual Inspection.

No instances of noncompliance.

Payment shall be made only for work properly accomplished. All nonconforming work shall be corrected.

Repeated failure to meet the AQL will result in lower performance rating.

2. Prevention of

Damage to Physical Improvements and Resources to Protect

Any damage to physical improvements is repaired to meet Government Standards.

Visual Inspection by noncompliance for entire contract.

Work not meeting AQL shall be suspended;

Contractor may be terminated for repetitive failure to meet AQL.

Government may assess damages. Repeated failure to meet the AQL or to correct nonconforming work will result in lower performance rating.

3. Contractor

Data, Reports, and Plans

Contractor Progress Schedule, Quality Control Plan, and Safety Plan are followed and Inspection Data is accurate.

Periodic Inspection or Evaluation by the noncompliance.

Contractor’s performance will be rated at end of contract;

repeated failure to meet the AQL or to correct nonconforming work will result in lower performance rating.

8. Unit Data Sheet

Unit

Schedule Item (19)

Acres Mowing Prescription

1a

20.9 17.5 70.6

See Performance Standard 5.1.1, (a) through (c).

Approximately 109 acres of treatment.

3 1b

9.1 See Performance Standard 5.1.1, (a)

through (c).

Approximately 9.1 acres of treatment.

OPERATIONS

28.a PROTECTION OF IMPROVEMENTS So far as practicable, Contractor shall protect Specified Roads and other improvements such as roads, trails, telephone lines, ditches, and fences:

(a) Existing in the operating area,

(b) Determined to have a continuing need or use, and

(c) Designated on Contract Area Map.

Contractor shall keep roads and trails needed for fire protection or other purposes and designated on Contract Area Map reasonably free of equipment and products, slash, and debris resulting from Contractor’s Operations.

Contractor shall make timely restoration of any such improvements damaged by Contractor’s Operations and, when necessary because of such operations, shall move such improvements.

29.1a UNIT BOUNDARIES. (11/06) The boundaries of cutting units are designated as shown in the following table. The trees used for boundary designation are not to be cut.

Unit Boundary Designation Table

Mowing Unit Flagging Color Designation 1 YELLOW Boundaries are marked with flagging attached to vegetation.

2, 3, 4 BLUE Boundaries are marked with flagging attached to vegetation.

35. STREAMCOURSE PROTECTION

“Streamcourses” that are subject to provisions of this Section are shown on Contract Area Map. Unless otherwise agreed, the following measures shall be observed to protect Streamcourses:

(a) Contractor’s Operations shall be conducted to prevent debris from entering Streamcourses, except as may be authorized under paragraph (d). In event Contractor causes debris to enter Streamcourses in amounts that may adversely affect the natural flow of the stream, water quality, or fishery resource, Contractor shall remove such debris as soon as practicable, but not to exceed 48 hours, and in an agreed manner that will cause the least disturbance to Streamcourses.

(b) Culverts or bridges shall be required on Temporary Roads at all points where it is necessary to cross Streamcourses. Such facilities shall be of sufficient size and design and installed in a manner to provide unobstructed flow of water and to minimize damage to Streamcourses. Trees or products shall not be otherwise hauled or yarded across Streamcourses unless fully suspended.

(c) Wheeled or track-laying equipment shall not be operated in Streamcourses, except at crossings designated by Forest Service or as essential to construction or removal of culverts and bridges.

(d) Flow in Streamcourses may be temporarily diverted only if such diversion is necessary for Contractor’s planned construction and Forest Service gives written authorization. Such flow shall be restored to the natural course as soon as practicable and, in any event, prior to a major storm runoff period or runoff season.

42. SAFETY

Contractor’s Operations shall facilitate Forest Service’s safe and practical inspection of Contractor’s Operations and conduct of other official duties on Contract Area. Contractor has all responsibility for compliance with safety requirements for Contractor's employees. In the event that a conflict develops between the requirements of this contract or agreed upon methods of proceeding hereunder and State or Federal safety requirements, the contract shall be modified and Contractor may request an equitable adjustment.

Unless otherwise agreed in writing, when Contractor’s Operations are in progress adjacent to or on Forest Service controlled roads and trails open to public travel, Contractor shall furnish, install, and maintain all temporary traffic controls that provide the user with adequate warning of hazardous or potentially hazardous conditions associated with Contractor’s Operations. Contractor and Forest Service shall agree to a specific Traffic Control Plan for each individual project prior to commencing operations. Devices shall be appropriate to current conditions and shall be covered or removed when not needed. Except as otherwise agreed, flagmen and devices shall be as specified in the “Manual on Uniform Traffic Control Devices for Streets and Highways” (MUTCD) and as shown on Plans, Contract Area Map, Traffic Control Plan, or in specifications attached hereto.

Project specific traffic safety signing:

Traffic Sign Requirements/Plan

Warning of hazardous or potentially hazard conditions associated with the contractor operations are needed. These signs must meet MUTCD (Manual on Uniform Traffic Devices) standards.

Unless otherwise agreed upon, a minimum of 2 signs are required on open roads and trails with reflective orange background and black legend & border. All signs are on National Forest System Roads (NFSR). Placement of signs on existing posts with existing signs will not be allowed.

Signs need to be mounted on 4”x 4” posts, 6 to 12 feet from edge of road/trail and 7 foot to bottom of sign from the road surface, per EM-7100-15 (Sign and Poster Guidelines for the Forest Service). Theft prevention bolts and nuts are recommended to secure signs to posts. Locations for signs are:

Suggested Safety Sign Suggested Location “Mowing Operations” black legend and border on reflectorized orange

FG-20-3-48”

One sign placed at the beginning of NFST 780.1a.

One sign placed on the road approximately 100 yards on either side of the active mowing operations.

(If agreed to by Contracting Officer, the warning signs may be substituted with similar warning message.)

Traffic Control Roads and trails are to remain open unless otherwise agreed to in advance. Operations signs will be needed on both ends of active mowing treatment operations segments warning the public that tree mowing operations are taking place.

Contractor shall provide flaggers or guards during active mowing operations to stop trail traffic from entering into mowing zone that intersects with NFST 780.1a. Other methods of traffic control during felling operations proposed by contractor may be agreed to in writing by the COR.

Written requests for road closures will be submitted 2 days in advance to the CO. Temporary trail closures would be addressed through the COR authorities.

Mowing Operations Mowing operations are inherently hazardous. Conditions, which are inherently hazardous, that could lead to serious injury or loss of life include, but are not limited to:

1. Traffic hazards 5. Heavy equipment operations

a. Narrow gravel or native surface forest roads a. Backing into objects

b. Long, steep grades (less than 20%) b. Steep side slopes or soft ground for rollovers

c. Unskilled visitor traffic c. Refueling hazards

d. Dusty conditions hindering visibility behind vehicles

d. Exceeding equipment limitations

2. Work environment e. Unsafe equipment / lack of safety equipment

a. Inclement weather for potential hypo/hypothermia

f. Operator fatigue

b. Wet, snowy or ice conditions making ground unstable

6. Excavation

c. High db noise a. Slope or trench wall instability

b. High pressure gas lines and other utilities

d. Insects, plants, animals 7. Truck Driving & Trailer Towing

e. Hazardous footing/terrain a. Increased stopping distance

e. Hazardous footing/terrain b. Loads insecurely lashed

c. Low clearances (power lines, etc.)

3. Communications

a. Cell phone or radio availability for emergencies

Contractor shall provide a job-specific safety plan, addressing mitigation of the hazards listed above and any other hazards known to the Contractor. The plan shall be presented at the post-award conference.

File details come from the government source that posted it. Updated .