Attach. 4 PayCalculationsInstructions.doc
DOC document 49 KB Posted
- Attached to
- Bessey Nursery Lift & Pack
- Solicitation number
- AG-82X9-S-12-0020
About this file
Attach. 4 Pay Calculations
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach. 5 Wage Determination.doc | DOC document | |
| Solicitation.doc | DOC document | |
| SF-1449.pdf | ||
| Instruction Sheet.doc | DOC document | |
| Attach. 1 Performance_Work_Statement2012.docx | DOCX document | |
| Attach. 3 Grading Standards.doc | DOC document | |
| Attach. 2 Map_2012.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Pay Instructions (Packing Shed)
1. Complete daily for each seedlot.
2. Find the final average % quality allowance in each inspection area on the inspector’s sheets for the seedlot.
3. Use these final percentages and the following flow chart to fill out the corresponding spreadsheet located at K:\bn\contracting\Lift and Pack\PackingPayBlankSheet.xls.
4. Enter Age, Date, Seedlot #, Packed volume, and Price Per 1000 in the spreadsheet.
See example on the following page
Then, using the data from the inspectors’ sheets and the chart below, determine the monetary deductions for damaged/wasted trees and/or damaged property and enter that total in the “$ Value” column on their inspection sheets. The total value of these deductions should then be entered (as a negative #) in the “Monetary Charges For Property/Tree Damage” column of the PackingPayBlankSheet.xls spreadsheet.
1) Tub of seedlings:
1-0 = $245.00/tub or any approximate % of a tub
2-0 = $158.00/tub or any approximate % of a tub
3-0 = $158.00/tub or any approximate % of a tub
Transplants: $193.00/tub or any approximate % of a tub
2) Individual Seedlings
1-0 = $0.54 each
2-0 = $0.59 each
3-0 = $0.64 each
Transplants = $0.78 each
3) Property and equipment:
(1) Broken tubs = $25.00 each
(2) Grading calipers = $29.00 each
(3) Packing Bags = $3.00 each
(4) Other property and equipment = Fair market cost for repair or replacement, to include all related charges.
The PackingPayBlankSheet.xls spreadsheet will then tabulate the amount to pay the contractor for that seedlot/daily pay.
Print a copy for you and the contractor and save the filled spreadsheet under another name, i.e., PackingPay2012.xls.
Example 1: Contractor is not short and you find on the sheets:
| Inspection Category |
| Final % (from sheets) |
| Max Allowance% |
| Amt. exceeding allowance |
| Bundle Counts |
| 1.2 |
| 1 |
| 0.2 % |
| Overall Seedling Inspection |
| 5.4 |
| 5 |
| 0.4% |
| Root Inspection |
| 2.6 |
| 5 |
| Packing Bag Counts |
| 0 |
| 0 |
| Floor Counts |
| 5.1 |
| 5 |
| See below |
Total Exceeding Allowance
0.6%
Because the contractor was not short on the packing request, you do not use the final % from the floor count inspection category to determine pay. However, from the other categories you find 0.6% over the maximum allowance.
Since 0.6% < 9%, you enter “-0.006” in the “Full Pay, Incentive, or -Deduction” column of the PackingPayBlankSheet.xls spreadsheet.
Example 2: Contractor is short and you find:
| Inspection Category |
| Final % (from sheets) |
| Max Allowance% |
| Amt. exceeding allowance |
| Bundle Counts |
| 3.5 |
| 1 |
| 2.5 % |
| Overall Seedling Inspection |
| 6.5 |
| 5 |
| 1.5% |
| Root Inspection |
| 8.0 |
| 5 |
| 3.0% |
| Packing Bag Counts |
| 2.9 |
| 0 |
| 2.9% |
| Floor Counts |
| 5.1 |
| 5 |
| 0.1% |
Total Exceeding Allowance
10.0%
Because the contractor was short on the packing request, you will use the final % from the floor count inspection category in addition to the other categories to determine pay. Since the amount exceeding the allowance is 10%, which is >9%, you would double it (=20%) and then enter this amount (-0.20”) into the “Full Pay, Incentive, or -Deduction” column of the spreadsheet.
Was seedlot inspected?
Enter “FP” in column G (full pay/no inspection/no incentive).
No
Yes
Any defects noted on Daily Inspection Records?
Enter “0.05” in column G
(Full pay + 5% incentive).
Packing request short by contractor’s fault?
Bundle counts between 0.5 and 1%?
Overall seedling inspection between 2.5 and 5%?
Root inspection between 2.5 and 5%?
Packing bag counts = 0%?
Floor counts between 2.5 and 5%?
Bundle counts >0.5%?
Overall seedling inspection > 2.5%?
Root inspection > 2.5%?
Packing bags > 0%?
Floor counts > 2.5%?
Yes- in any single item
No-in any single item
Enter “FP” in Column G (full pay/no incentive).
Enter “0.025” in column G
(full pay + 2.5% incentive).
Add the % amounts exceeding the quality allowance %. (If not short by contractor’s fault, only use first 4 inspection categories).
If this amount is < 9%, enter it in the “Full Pay, Incentive, -Deduction” column.
If this amount is > 9%, double it and enter it in the “Full Pay, Incentive, -Deduction ” column.
File details come from the government source that posted it. Updated .