Revised CABLETIE-PRECAST-PLANKS-Gen.pdf

PDF 220 KB Posted

Attached to
Pre-Cast Concrete Planks Project
Solicitation number
AG-82X9-S-11-0089
Issued by

About this file

Drawing

View the file

Other files

File Type Posted
CABLETIE-PRECAST-PLANKS.pdf PDF
Amendment One.pdf PDF
AG82X9S110089.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0:\NFS\GMUG\Program\7100Engineering\CMLG_legacy_road_trail\fy_09_submittals\pauline_crossing\dwgs\cabletie_precast_planks.dwg

GRAND MESA, UNCOMPAHGRE

AND GUNNISON NATL. FORESTS

HARDENED FORDS

WITH CONCRETE PLANKS

8' x 3' x 6"

PRECAST CONCRETE PLANK

NOT TO SCALE X

XX

GAG

GAG

PDM

TLC

ROCKY MOUNTAIN REGION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

G

E

TR

A P

AFTNEM O

D

R

LUCIR

U T

E

Checked

ReviewedR-2

Design

Drawn Forest Project Name

Scale Sheet

Sheet Title

CONNECTING CABLES

SEE DETAILS AT RIGHT

NOTE:

REINFORCEMENT BARS SHALL BE #5 STEEL DEFORMED, AASHTO M 31, GRADE 60.

CONNECT REBAR WITH WIRE TIES AT ALL INTERSECTIONS AND CHAIR LOCATIONS.

CONCRETE SHALL BE 4000 PSI @ 28 DAYS, AIR ENTRAINED, 3/4" MAX. SIZE AGGREGATE.

CONNECTING CABLES

NOTE:

PRECAST 3/4" CHAMFER IN THE EXPOSED OUTSIDE SURFACE CORNERS & EDGES.

TOP SURFACE OF EACH PLANK SHALL HAVE 1/2" WIDE GROVES, 1/2" DEEP, AT

9", 18" & 27" FROM STARTING EDGE, FORMED LENGTH WAYS ALONG THE PLANK

AND A MEDIUM BROOMED FINISH OR 1/4" DEEP RAKED FINISH OVER ENTIRE SURFACE.

CONNECTING CABLE DETAIL

NOTES:

1. CONNECTING CABLES SHALL BE 5/8" DIAMETER CORROSION

RESISTANT WIRE ROPE.

2. CABLE CLAMPS SHALL BE OF THE GALVANIZED MALLEABLE TYPE.

3. ISOLATE CABLES FROM INTERNAL REBAR AND OTHER CABLES WITH

APPROVED MATERIAL TO PREVENT CORROSION.

4. BOTTOM OF PLANKS MAY BE CAST AGAINST ANY HARD SURFACE THAT

WILL LEAVE A REASONABLY UNIFORM SURFACE AND THICKNESS.

5. CURE PLANKS 7 DAYS MINIMUM BEFORE LIFTING WITH SLINGS.

6. DO NOT USE CONNECTING CABLES TO LIFT PLANKS.

7. SCORE 1/2" WIDE BY 1/2"DEEP GROVES AS SHOWN AT RIGHT AND

APPLY MEDIUM BROOM FINISH TO PLANK SURFACE FOR TRACTION

OR 1/4" DEEP RAKED FINISH OVER THE ENTIRE SURFACE.

8. IF ENDS OF CONNECTING CABLES NEED TO BE TRIMMED TO ALLOW

PROPER FIT, THEY SHALL BE SHEARED AND TREATED WITH ZINC PAINT.

8'-0"

24"

3"

3"

8'-0"

3"

#5 rebar cut to 90"

18"18" 18" 18"18"

36"

3"

3"

10"

10"

10"

3"

1/2" groves

6"

#5 rebar cut to 30"

6"

ISOLATE CABLE FROM REBAR

WITH APPROVED MATERIAL

6" Min.

0:\NFS\GMUG\Program\7100Engineering\CMLG_legacy_road_trail\fy_09_submittals\pauline_crossing\dwgs\cabletie_precast_planks.dwg

GRAND MESA, UNCOMPAHGRE

AND GUNNISON NATL. FORESTS

HARDENED FORDS

WITH CONCRETE PLANKS

8' x 3' x 6"

PRECAST CONCRETE PLANK

NOT TO SCALE X

XX

GAG

GAG

PDM

TLC

ROCKY MOUNTAIN REGION

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

G

E

TR

A P

AFTNEM O

D

R

LUCIR

U T

E

Checked

ReviewedR-2

Design

Drawn Forest Project Name

Scale Sheet

Sheet Title

CONNECTING CABLES

SEE DETAILS AT RIGHT

NOTE:

REINFORCEMENT BARS SHALL BE #5 STEEL DEFORMED, AASHTO M 31, GRADE 60.

CONNECT REBAR WITH WIRE TIES AT ALL INTERSECTIONS AND CHAIR LOCATIONS.

CONCRETE SHALL BE 4000 PSI @ 28 DAYS, AIR ENTRAINED, 3/4" MAX. SIZE AGGREGATE.

CONNECTING CABLES

NOTE:

PRECAST 3/4" CHAMFER IN THE EXPOSED OUTSIDE SURFACE CORNERS & EDGES.

TOP SURFACE OF EACH PLANK SHALL HAVE 1/2" WIDE GROVES, 1/2" DEEP, AT

9", 18" & 27" FROM STARTING EDGE, FORMED LENGTH WAYS ALONG THE PLANK

AND A MEDIUM BROOMED FINISH OR 1/4" DEEP RAKED FINISH OVER ENTIRE SURFACE.

CONNECTING CABLE DETAIL

NOTES:

1. CONNECTING CABLES SHALL BE 5/8" DIAMETER CORROSION

RESISTANT WIRE ROPE.

2. CABLE CLAMPS SHALL BE OF THE GALVANIZED MALLEABLE TYPE.

3. ISOLATE CABLES FROM INTERNAL REBAR AND OTHER CABLES WITH

APPROVED MATERIAL TO PREVENT CORROSION.

4. BOTTOM OF PLANKS MAY BE CAST AGAINST ANY HARD SURFACE THAT

WILL LEAVE A REASONABLY UNIFORM SURFACE AND THICKNESS.

5. CURE PLANKS 7 DAYS MINIMUM BEFORE LIFTING WITH SLINGS.

6. DO NOT USE CONNECTING CABLES TO LIFT PLANKS.

7. SCORE 1/2" WIDE BY 1/2"DEEP GROVES AS SHOWN AT RIGHT AND

APPLY MEDIUM BROOM FINISH TO PLANK SURFACE FOR TRACTION

OR 1/4" DEEP RAKED FINISH OVER THE ENTIRE SURFACE.

8. IF ENDS OF CONNECTING CABLES NEED TO BE TRIMMED TO ALLOW

PROPER FIT, THEY SHALL BE SHEARED AND TREATED WITH ZINC PAINT.

8'-0"

24"

3"

3"

8'-0"

3"

#5 rebar cut to 90"

18"18" 18" 18"18"

36"

3"

3"

10"

10"

10"

3"

1/2" groves

6"

#5 rebar cut to 30"

6"

ISOLATE CABLE FROM REBAR

WITH APPROVED MATERIAL

6" Min.

Model
Layout1

File details come from the government source that posted it. Updated .