Revised CABLETIE-PRECAST-PLANKS-Gen.pdf
PDF 220 KB Posted
- Attached to
- Pre-Cast Concrete Planks Project
- Solicitation number
- AG-82X9-S-11-0089
About this file
Drawing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CABLETIE-PRECAST-PLANKS.pdf | ||
| Amendment One.pdf | ||
| AG82X9S110089.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0:\NFS\GMUG\Program\7100Engineering\CMLG_legacy_road_trail\fy_09_submittals\pauline_crossing\dwgs\cabletie_precast_planks.dwg
GRAND MESA, UNCOMPAHGRE
AND GUNNISON NATL. FORESTS
HARDENED FORDS
WITH CONCRETE PLANKS
8' x 3' x 6"
PRECAST CONCRETE PLANK
NOT TO SCALE X
XX
GAG
GAG
PDM
TLC
ROCKY MOUNTAIN REGION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
G
E
TR
A P
AFTNEM O
D
R
LUCIR
U T
E
Checked
ReviewedR-2
Design
Drawn Forest Project Name
Scale Sheet
Sheet Title
CONNECTING CABLES
SEE DETAILS AT RIGHT
NOTE:
REINFORCEMENT BARS SHALL BE #5 STEEL DEFORMED, AASHTO M 31, GRADE 60.
CONNECT REBAR WITH WIRE TIES AT ALL INTERSECTIONS AND CHAIR LOCATIONS.
CONCRETE SHALL BE 4000 PSI @ 28 DAYS, AIR ENTRAINED, 3/4" MAX. SIZE AGGREGATE.
CONNECTING CABLES
NOTE:
PRECAST 3/4" CHAMFER IN THE EXPOSED OUTSIDE SURFACE CORNERS & EDGES.
TOP SURFACE OF EACH PLANK SHALL HAVE 1/2" WIDE GROVES, 1/2" DEEP, AT
9", 18" & 27" FROM STARTING EDGE, FORMED LENGTH WAYS ALONG THE PLANK
AND A MEDIUM BROOMED FINISH OR 1/4" DEEP RAKED FINISH OVER ENTIRE SURFACE.
CONNECTING CABLE DETAIL
NOTES:
1. CONNECTING CABLES SHALL BE 5/8" DIAMETER CORROSION
RESISTANT WIRE ROPE.
2. CABLE CLAMPS SHALL BE OF THE GALVANIZED MALLEABLE TYPE.
3. ISOLATE CABLES FROM INTERNAL REBAR AND OTHER CABLES WITH
APPROVED MATERIAL TO PREVENT CORROSION.
4. BOTTOM OF PLANKS MAY BE CAST AGAINST ANY HARD SURFACE THAT
WILL LEAVE A REASONABLY UNIFORM SURFACE AND THICKNESS.
5. CURE PLANKS 7 DAYS MINIMUM BEFORE LIFTING WITH SLINGS.
6. DO NOT USE CONNECTING CABLES TO LIFT PLANKS.
7. SCORE 1/2" WIDE BY 1/2"DEEP GROVES AS SHOWN AT RIGHT AND
APPLY MEDIUM BROOM FINISH TO PLANK SURFACE FOR TRACTION
OR 1/4" DEEP RAKED FINISH OVER THE ENTIRE SURFACE.
8. IF ENDS OF CONNECTING CABLES NEED TO BE TRIMMED TO ALLOW
PROPER FIT, THEY SHALL BE SHEARED AND TREATED WITH ZINC PAINT.
8'-0"
24"
3"
3"
8'-0"
3"
#5 rebar cut to 90"
18"18" 18" 18"18"
36"
3"
3"
10"
10"
10"
3"
1/2" groves
6"
#5 rebar cut to 30"
6"
ISOLATE CABLE FROM REBAR
WITH APPROVED MATERIAL
6" Min.
0:\NFS\GMUG\Program\7100Engineering\CMLG_legacy_road_trail\fy_09_submittals\pauline_crossing\dwgs\cabletie_precast_planks.dwg
GRAND MESA, UNCOMPAHGRE
AND GUNNISON NATL. FORESTS
HARDENED FORDS
WITH CONCRETE PLANKS
8' x 3' x 6"
PRECAST CONCRETE PLANK
NOT TO SCALE X
XX
GAG
GAG
PDM
TLC
ROCKY MOUNTAIN REGION
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
G
E
TR
A P
AFTNEM O
D
R
LUCIR
U T
E
Checked
ReviewedR-2
Design
Drawn Forest Project Name
Scale Sheet
Sheet Title
CONNECTING CABLES
SEE DETAILS AT RIGHT
NOTE:
REINFORCEMENT BARS SHALL BE #5 STEEL DEFORMED, AASHTO M 31, GRADE 60.
CONNECT REBAR WITH WIRE TIES AT ALL INTERSECTIONS AND CHAIR LOCATIONS.
CONCRETE SHALL BE 4000 PSI @ 28 DAYS, AIR ENTRAINED, 3/4" MAX. SIZE AGGREGATE.
CONNECTING CABLES
NOTE:
PRECAST 3/4" CHAMFER IN THE EXPOSED OUTSIDE SURFACE CORNERS & EDGES.
TOP SURFACE OF EACH PLANK SHALL HAVE 1/2" WIDE GROVES, 1/2" DEEP, AT
9", 18" & 27" FROM STARTING EDGE, FORMED LENGTH WAYS ALONG THE PLANK
AND A MEDIUM BROOMED FINISH OR 1/4" DEEP RAKED FINISH OVER ENTIRE SURFACE.
CONNECTING CABLE DETAIL
NOTES:
1. CONNECTING CABLES SHALL BE 5/8" DIAMETER CORROSION
RESISTANT WIRE ROPE.
2. CABLE CLAMPS SHALL BE OF THE GALVANIZED MALLEABLE TYPE.
3. ISOLATE CABLES FROM INTERNAL REBAR AND OTHER CABLES WITH
APPROVED MATERIAL TO PREVENT CORROSION.
4. BOTTOM OF PLANKS MAY BE CAST AGAINST ANY HARD SURFACE THAT
WILL LEAVE A REASONABLY UNIFORM SURFACE AND THICKNESS.
5. CURE PLANKS 7 DAYS MINIMUM BEFORE LIFTING WITH SLINGS.
6. DO NOT USE CONNECTING CABLES TO LIFT PLANKS.
7. SCORE 1/2" WIDE BY 1/2"DEEP GROVES AS SHOWN AT RIGHT AND
APPLY MEDIUM BROOM FINISH TO PLANK SURFACE FOR TRACTION
OR 1/4" DEEP RAKED FINISH OVER THE ENTIRE SURFACE.
8. IF ENDS OF CONNECTING CABLES NEED TO BE TRIMMED TO ALLOW
PROPER FIT, THEY SHALL BE SHEARED AND TREATED WITH ZINC PAINT.
8'-0"
24"
3"
3"
8'-0"
3"
#5 rebar cut to 90"
18"18" 18" 18"18"
36"
3"
3"
10"
10"
10"
3"
1/2" groves
6"
#5 rebar cut to 30"
6"
ISOLATE CABLE FROM REBAR
WITH APPROVED MATERIAL
6" Min.
| Model |
| Layout1 |
File details come from the government source that posted it. Updated .