Amendment 2.pdf

PDF 84 KB Posted

Attached to
Rosy Lane Campground Water System Project Federal contract opportunity
Solicitation number
AG-82X9-S-11-0077
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

Amendment Two (2)

View the file

Other files for this federal contract opportunity

Other files attached to Rosy Lane Campground Water System Project, newest first.
File Type Posted
Attachment 5 Wage Determination.PDF PDF
U3-HYDRANT_DETAILS U3-HydrantBW.pdf PDF
Amendment 1.pdf PDF
Attachment 4 Cover Sheet.docx DOCX document
Attachment 3 Wage Determination.PDF PDF
Attachment 1 Specifications.pdf PDF
Attachment 2 Map and Drawings.PDF PDF
AG-82X9-S-11-0077.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-82X9-S-11-0077

x x

3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

GOLDEN CO 80401-4720

82X9

740 SIMMS ST

ROCKY MOUNTAIN REGION

USDA FOREST SERVICE

ROCKY MOUNTAIN REGION

82AT

FORT COLLINS CO 80526-8119

2150 CENTRE AVENUE BUILDING E

ARAPAHOE-ROOSEVELT NF PAWNEE NG

USDA FOREST SERVICE

05/03/2011000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/03/2011

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment Two (02) for the Rosy Lane Campground Water System Project.

The following questions have been asked. There will be no further questions allowed after

May 18, 2011.

1) Do you know if this project requires a separate State electrical permit or is it incorporated in the building permit?

No building permit is required, but an electrical permit is.

2) Is this project Tax Exempt?

No

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

CHRISTINA A. SCHOFIELD

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-82X9-S-11-0077/000002

3) Do you require a bid bond for this project?

Yes

4) Is the concrete slab/foundation for the CST building to be provided under this contract?

The Government furnished CXT utility house has a concrete floor. Nothing is requred in this contract.

5) Is the nine (9) day completion requirement shown on the 1442 correct?

Yes, the time is correct. We will not start the time on the contract until the Contractor has everything purchased and is ready to do the installation.

6) It appears that the Wage Determination is missing the information for equipment operators, Will it be provided?

It was omitted in error. Please refer to Attachment 5 included with this Amendment.

7) What is the anticipated start date for this project?

As per Section F of the solicitation, we anticipate meeting within five (5) calendar days after award. The NTP will be issued once all items are ready for installation.

8) What is the depth of the existing well pump?

50 feet.

The closing date has not been changed.

There are no other changes to this solicitation.

All terms and conditions remain unchanged and in full force and effect.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .