The file's text, extracted by GovTribe without its formatting.
AG-82MK-S-17-0018
Cold Springs Ranger Station Utility Rehabilitation
SCHEDULE OF ITEMS
BASE ITEMS
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEASURE |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL COST |
| 001 |
| General Requirements/ Mobilization |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
| 002 |
| Drilling Test Well |
| EA |
| LF |
| 300 |
| $ |
| $ |
| 003 |
| Demolition |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
| 004 |
| Treatment Building and Storage Tank |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
| 005A |
| Waterline Installation (1 inch) |
| EA |
| LF |
| 267 |
| $ |
| $ |
| 005B |
| Waterline Installation (2 inch) |
| EA |
| LF |
| 817 |
| $ |
| $ |
| 006 |
| Water System Testing |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
| 007 |
| Trailer Pad Utilities |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
| 008 |
| Waste Water System Installation |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
| 009 |
| Leachfield Installation |
| EA |
| LF |
| 516 |
| $ |
| $ |
| 010 |
| Generator System and Site Electrical |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
WATER SYSTEM DEVELOPMENT ITEMS
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEASURE |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL COST |
| 011A |
| Spring System Development |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
| 011B |
| Well Development |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
* Based upon the test results of the test well (base item 002), will determine which one of the two Water System Development items (011A or 011B) will be awarded.
OPTIONAL ITEMS
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEASURE |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL COST |
| 012 |
| Trailer Pad Construction |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
| 013 |
| Propane Tank Replacement |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
| 014 |
| Photovoltaic System Installation |
| LSQ |
| Lump Sum |
| Job |
| $ |
| $ |
| TOTAL OF OPTIONAL ITEMS |
| $ |
*Depending on the availability of funds and proposal prices received, optional items may or may not be awarded.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Pay Item 001 “Mobilization”.