AG-82FT-S-17-0012AME000001.pdf
PDF 93 KB Posted
- Attached to
- Desert Garage Reroofing and Painting
- Solicitation number
- AG-82FT-S-17-0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_3_-_Photos.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Solicitation_AG-82FT-S-17-0012.doc.pdf | ||
| Attachment_1_-_Specifications.pdf | ||
| Attachment_2_-_Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-82FT-S-17-0012
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
82FT
FORT COLLINS CO 80526
240 W PROSPECT STREET
ROCKY MOUNTAIN RESEARCH STATION
USDA FOREST SERVICE
05/10/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/10/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 000001 is as follows:
1. Provide responses to questions and answers that were submitted through June 1, 2017.
Period of Performance: 06/22/2017 to 07/22/2017
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ANTHONY O. SALAS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
AG-82FT-S-17-0012
Desert Garage Reroofing & Painting
Amendment No. 000001, dated 06/01/17 Page 1 of 2
Desert Garage Reroofing & Painting Solicitation Number AG-82FT-S-17-0012
Amendment 000001 – Questions and Answers
1. Has the project been tested for lead based paint?
A1) The project was tested several years ago and it does contain lead.
2. What is the time frame project needs to be done in?
A2) The project needs to be done in 30 days. Start date varies depending on award date.
3. Is there going to be any painting on the interior of the garage?
A3) There is no interior painting.
4. In the pictures that were provided there is no facia boards in some areas of garage is this how it is going to stay or are new pieces going to be installed?
A4) There is no changes to the exterior and no additional facia boards planned at this time.
5. I assume we are only to work on the big garage but in the pictures, there are 2 smaller out buildings. What is going on with these buildings?
A5) The other buildings are not being touched at this time.
6. There is a little confusion on what finish sheen to use. Is a satin sheen ok?
A6) A satin sheen is okay!
7. Are new windows going to be installed at any time on this project?
A7) No new windows will be installed during this project.
8. From pictures it is hard to see if there are any boards that need replaced, to CO knowledge are there any boards or areas of building that will need replaced prior to paint?
A8) At this time there is no plan to change any of the existing siding as it is historic in nature and would require State Historic Preservation Office. Existing siding will need to re-secured to the building as necessary.
9. What is the availability with power and water?
A9) There is no power available at the site, but we can provide you with water.
10. Are we able to work weekends?
A10) Weekend work maybe allowed if normal work week doesn’t allow the project to be completed in a timely manner.
11. Will you be requiring dense decking or secure rock installation after the sheathing and if so what size ½” or 5/8”?
A1-Roof) There is no need for dense decking or secure rock installation after the sheathing. Existing sheathing should be sufficient for installation of new shingles.
| SF-30 |
| Q&A |