AG-82FT-S-16-0024AME000001.pdf
PDF 96 KB Posted
- Attached to
- Missoula FoSL Video Surveillance System
- Solicitation number
- AG-82FT-S-16-0024
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-82FT-S-16-0024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-82FT-S-16-0024
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
82FT
FORT COLLINS CO 80526
240 W PROSPECT STREET
ROCKY MOUNTAIN RESEARCH STATION
USDA FOREST SERVICE
06/08/2016000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/08/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 000001 Missoula FoSL Video Surveillance System
The purpose of Amendment 000001 is as follows:
1. Provide responses to questions that were submitted by June 22, 2016.
2. Extend the solicitation due date to 7/6/2016.
This solicitation is issued under FAR Part 12 Using FAR Part 13 evaluation procedures
Offorors must be registered in the System for Award Management (SAM) database with a DUNS number in order to participate in this procurement. For instructions on registering with
SAM, please visit the SAM website at http://www.sam.gov. DUNS:__________________
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ANTHONY O. SALAS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-82FT-S-16-0024/000001
Period of Performance: 07/29/2016 to 09/30/2016
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
AG-82FT-S-16-0024AME000001
Missoula FoSL Video Surveillance System
Amendment No. 000001, dated 06/28/2016 Page 1 of 1
Missoula FoSL Video Surveillance System Solicitation Number AG-82FT-S-16-0024
Amendment 000001 – Questions and Answers
Q1.) In my observations of the prints provided, brings me to ask if there are networking closets on each level of the facility that we may run the data cabling for the cameras? If not, will there be floor chases provided to run the cabling between floors all the way to the basement where the recorder is specified to be located?
A1.) There is IT room in the basement and 1st floor. There is conduits between floors.
Q2.) Also, what type of finish will the exterior of the building have?
A2.) Multiple finishes: brick façade, wood beams, fiber cement paneling
Q3.) Are there drop ceilings or hard lead?
A3.) Drop ceilings
Q4.) What are the walls made of? Drywall?
A4.) There is a mixture of CMU and drywall.
Q5.)How high are the ceilings?
A5.) Vary between 8’ and 9’
Q6.) What are the raceway specs? (i.e. are they mounted on the wall, in the ceiling, etc.)
A6.) The raceway in the ceiling is just open plenum. Conduit that needs to installed will be EMT mounted to ceiling or wall. Exterior conduit needs to meet NFPA requirements. Flexible Steel conduit can be used for short runs were flexible path is required.
Q7.) The requisition asks for 2-way audio (which I imagine is for the outdoor cameras only). Are they looking for an audio system that is integrated into the camera or do they want an entirely different audio system separate from the camera system?
A7.) There is no requirement for 2-way audio on for the camera system.