Attachment_1_-_SOW.pdf

PDF 8 KB Posted

Attached to
Centennial Trail Maintenance Federal contract opportunity
Solicitation number
AG-82D7-S-17-0013
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

Attachment 1 - SOW

View the file

Other files for this federal contract opportunity

Other files attached to Centennial Trail Maintenance, newest first.
File Type Posted
Attachment_3_-_Wage_Determination.pdf PDF
Attachment_4_-_FIRE_PREVENTION_AND_CONTROL.pdf PDF
Attachment_2_-_Drawings.pdf PDF
AG-82D7-S-17-0013_-_Centennial_Trail_Maintenance.pdf PDF
AG-82D7-S-17-0013_-_SF-1449_Only.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- 1 -

SECTION C – SPECIAL CONTRACT REQUIREMENTS

GENERAL

Scope of Work:

This project reconstructs and places aggregate on 3.1 miles of existing ATV route on the Centennial Trail (NFST 8089) and repairs a short section of Iceman (NFST 8284) Trail.

The work on the Centennial Trail consist of five sections of trail starting at NFSR 678.1E and continuing south on Centennial Trail to NFSR 152.2C. The total length of the five segments of trail to reconstruct and gravel is 3.1 miles of the overall trail length of 5.0 miles.

Project Location:

Project is located in two areas:

The Centennial Trail work is located approximately 15 miles northwest of Rapid City SD near Nemo SD on the Black Hills National Forest. From Nemo County Road take CTY

140.1 for 0.5 miles to the Boxelder Forks Trailhead which is also the location of the start of trail reconstruction Section 2.

The Iceman Trail is located approximately 4 miles east of Nemo SD on the Black Hills National Forest. From Nemo take Nemo County Road No. 404 north for 0.2 miles to FH

26. Travel 0.2 miles north on FH 26 to FSR 144. Take FSR 144 east for 3 miles to 8283.

Take 8283 for 2.5 miles to Iceman (8284) Trail.

Work Procedure:

All work related to this project shall be done in accordance with all applicable OSHA and State of South Dakota regulations.

Referenced Specifications:

Construction of this project shall conform to the specifications in the “Standard Specifications for Construction and Maintenance of Trails September 1996 EM-7720-103 available at the following site:

https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5356707.pdf

File details come from the government source that posted it. Updated .