Attachment II - Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_I_Quote_sheet-clauses.docx | DOCX document | |
| SF_18.pdf | ||
| Attachment_III-Tioga_drawings-Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRINTER BOY CAMPGROUND – LEADVILLE RANGER DISTRICT
PRE-CAST CONCRETE DOUBLE VAULT TOILET WITHOUT CHASE
STANDARD SPECIFICATIONS
TABLE OF CONTENTS
Date: 07-02-2014
DIVISION 1 - GENERAL REQUIREMENTS
Section 01010 - Summary of Work
DIVISION 13 – SPECIAL CONSTRUCTION
Section 13601 - Prefabricated Toilet Building
SECTION 01010
SUMMARY OF THE WORK
PART 1 - GENERAL
1.01
LOCATION
A.
The toilet shall be delivered and installed at the Printer Boy Campground within the Turquoise Lake Recreational Area located on the Leadville Ranger District of the San Isabel National Forest. The campground is located approximately 6 miles north west of Leadville, Colorado, along County Road 9.
1.02 DESCRIPTION OF WORK
A. Work includes, but is not limited to, furnishing all materials, labor, and equipment to furnish and install a concrete prefabricated double vault toilet with chase in accordance with the specifications and as shown on the drawings.
1.03
SPECIFICATIONS
A.
All work shall adhere to these Specifications as well as CXT Specifications and drawings.
1.04
MEALS AND LODGING
A.
Meals and lodging are commercially available within 6 miles of Printer Boy Campground. Meals or lodging will not be available at Forest Service facilities.
1.05
WEATHER
A.
The construction site experiences snowfall and cold temperatures, with snow on the ground typically intermittently before June and after September.
1.06
CONSTRUCTION ADMINISTRATION
A.
No dumping of waste products of any type will be permitted. All waste shall be transported to a sanitary landfill off National Forest lands.
B.
No on-site sanitary facilities are available for Contractor’s use. Contractor shall provide facilities for construction employees. Human waste disposal shall conform to Colorado State Laws. Use of existing or new toilet facilities will not be allowed unless otherwise approved in writing.
C.
Materials for construction and construction vehicles and equipment may be stockpiled and staged at the project site in an area designated by the Contracting Officer.
D.
The Contractor shall take precautions to protect all work during the construction period.
E.
The Contractor is responsible for safeguarding the public and employees from construction operations.
F.
Camping will not be allowed.
END OF SECTION
SECTION 13601
PRE-FABRICATED TOILET BUILDING
PART 1 - GENERAL
1.01 SCOPE
A. The work in this section includes, but is not limited to, furnishing all materials, labor, and equipment to furnish and install a concrete prefabricated double vault toilet with chase in accordance with the specifications and as shown on the drawings.
1.02 MEASUREMENT
A. Use the method of measurement that is designated in the schedule of items.
1.03 PAYMENT
A. The accepted quantities will be paid for at the contract price for each pay item designated in the schedule of items. Payment of this item includes, but is not limited to all clearing and grubbing, excavation, providing/delivery/installing toilet, bedding, embankment, compaction, backfill, final grading, and all incidental materials associated therewith. The Contractor shall also provide the necessary lifting equipment and materials to off load the vaults and building. All work associated with the entire installation of the toilet shall be paid for under the pay item listed in the Schedule of Items.
PART 2 - PRODUCTS
2.01
MATERIALS
A.
See CXT Specifications and drawings attached to the solicitation.
2.02 CXT TOILET – Pre-cast concrete toilet shall be a Double Vault without Chase – Tioga Model as described and as manufactured by CXT Precast Concrete Products, 3808 North Sullivan Road, Building #7, Spokane, WA, 99216, (800) 696-5766, or an approved equal. The Contractor shall submit the Order Form to the Government for approval prior to ordering of the prefabricated toilet building. Attached to the solicitation are the CXT toilet drawings and specifications.
A.
Specific Toilet Characteristrics
Color: Roof and Walls – Cappuccino Cream (Color submittal required to be approved by the CO prior to ordering of the toilet) Signage: Mens and Women’s with Accessible Sign
Vent Locations: Right Side when facing – exterior wall; Left Side when facing- Door.
Solar Lighting: Lights installed within each side of structure.
Rock and Bird Screen: Installed on each vent stack.
Deadbolt Locks: Government furnished, contractor shall install
Building Locks: The building shall have two lock mechanisms. The first lock is a privacy lock that is operated by the public during use. This lock is incorporated into the entry door handle and can be engaged only from the building interior. It requires no key for operation.
The second lock is a deadbolt mechanism mounted on the entry door above the handle. This lock is operated from the outside of the building. This lock allows the agency to prevent public access during site closure periods or for other reasons. If the ordering agency desires a lock cylinder with an agency key, or special key (for example all buildings on a site keyed the same), the ordering agency must specify this request in the Order Package and make arrangements to ship the appropriate lock cylinders to contractor prior to manufacture of those buildings. The cylinders must conform to the specifications of a YALE 1152, 1-1/8", 5 Pin cylinder.
FS will supply contractor with Forest Service cylinders for the locks. Ordering units which specify this option but fail to send the specified lock cylinders in a timely manner will be liable for cylinder installation after delivery of the building(s). If an agency or special cylinder is not specified in the Order Package, the Contractor will install a standard keyed cylinder furnished by the Contractor.
Roof: Cedar Shake textured roof.
Building: Barnwood textured walls.
Vault: Minimum (2) 1000 gallon ABS lined concrete vaulst. Vaults shall be the foundation for the building. The perimeter of the building shall rest on the vaults.
PART 3 - EXECUTION
3.01 LAYOUT
A. The location of the toilet building shall be as shown on the drawings and staked in the field by the COR.
3.02 EXCAVATION
A. Excavation and embankment shall be in accordance with this Section and CXT Specifications.
B. Uniformly prepare the toilet building subgrade and slope, taking care not to damage adjacent vegetation of trees, to a level, smooth, compacted surface, free of irregular surface changes.
C. Subgrade material shall be moistened or dried to a uniform moisture content suitable for compaction and approved by the CO.
D. Excavate and stockpile topsoil separately. Topsoil shall be used for final grading purposes only.
3.03 INSTALLATION
A.
Install all prefabricated toilet facilities in accordance with the referred accessibility standards and manufacturer’s recommendations, as approved by the CO.
B.
The Finished floor shall be sloped at a 1% grade from back to front in order to provide drainage off of the slab of the structure. Finished floor elevation should be 4-6 inches above natural grade measured at the front entrance or as staked in the field by the Government. CO shall approve excavation and bedding prior to placing toilet vault and building.