EAST LOST SQUIRREL STEWARDSHIP
TABLE OF CONTENTS
Preface 101 - Terms, Format, and Definitions 102 - Bid, Award, and Execution of Contract 103 - Scope of Work 104 - Control of Work 105 - Control of Material 106 - Acceptance of Work 107 - Legal Relations and Responsibility To the Public 108 - Prosecution and Progress 109 - Measurement and Payment FSSS-151-01 - Mobilization FSSS-152-01 - Construction Survey and Staking 155 - Schedules for Construction Contracts FSSS-156-01 - Public Traffic FSSS-201-1 - Clearing and Grubbing FSSS-204-1 - Excavation and Embankment FSSS-251-1 - Riprap FSSS-303-1 - Road Reconditioning FSSS-322-22 - Crushed Aggregate FSSS-602-1 - Culverts and Drains
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions 101.00_nat__us08_12_2004
101.01_nat__us02_17_2005
101.01 Meaning of Terms.
Add the following:
Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).
101.03_nat__us02_17_2005
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLI
B
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI Symbols:
mp Milepost ppm Part Per Million
101.04_nat__us02_22_2005
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity-- “Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
R ig ht o f
W ay R oa d si de
R oa d si de
C le ar in g W id th
R oa dw ay
C le ar in g L im it
X Y
G ro un d
L in e
T ra ve le d W ay C L B er m
S ur fa ce
C o ur se
B as e C o ur se
F ill
S lo pe
B a ck S lo p e
D ra in ag e D itc h
G ro un d
L in e
S ub gr ad e
R oa d B ed
S ha pe s an d di m e ns io ns w ill v a ry t o fit lo ca l c on di tio ns
S ee d ra w in g s fo r ty pi ca l s ec tio ns
X a n d
Y d e no te c le a rin g o ut si de o f ro ad w ay
N ot e:
Right - of - Way Line
Right - of - Way Line
Clearing Limit
Shoulder
Shoulder
102 - Bid, Award, and Execution of Contract
102.00_nat__us02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat__us02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat__us02_17_2005
Deletions
Delete sections 104.01, 104.02, and 104.04.
104.06_nat__us02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02_nat__us05_11_2004
105.02 Material Sources.
105.02(a) Government Provided Sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat__us05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work (Page 1 of 2)
106.01_nat__us12_15_2004
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and substitute the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more stringent.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project.
When the Government tests work, copies of test reports are furnished to the Contractor upon request.
Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
Disputing Government test results.
If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
106 - Acceptance of Work (Continued, Page 2 of 2)
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.07_nat__us05_11_2004
106.07 Partial and Final Acceptance
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat__us05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat__us02_23_2005
107.06 Contractor’s Responsibility for Work.
Delete the following:
“except as provided in Subsection 106.07”.
107.09_nat__us05_11_2004
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat__us02_23_2005
107.10 Environmental Protection.
Design and locate equipment repair shops, stationary refueling sites, or other facilities, to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous- material spills.
Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA- or state-reportable, and if so, whether it was reported, and to whom.
Exact time and location of spill, including a description of the area involved.
Containment procedures.
Summary of any communications by Contractor with news media; Federal, State, and local regulatory agencies and officials; or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site, including final disposition and disposal location of spill residue.
When available, provide copies of all spill-related clean-up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat__us02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat__us02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat__us02_23_2005
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
FSSS-151-01
Section 151 - MOBILIZATION
Delete Section 151 in its entirety and replace with the following:
Description
151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site, and obtaining permits, insurance, and bonds.
This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands, according to the requirements within.
Construction Requirements
Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.
Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.
Notify the CO in writing at least 72 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.
Use methods of cleaning and locations for cleaning approved by the CO.
For work at a commercial washing facility, use an approved facility.
New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, in the Project Area or on the haul route, will be promptly reported to the other party.
Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found.
A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.
Measurement
151.02 Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment.
Payment for cleaning will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract.
Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.
FSSS-151-01(Page 2 of 2)
Measure mobilization according to Subsection 109.02.
Payment
151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Progress payments for mobilization lump sum will be paid as follows:
(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.
(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.
(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.
(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.
Include all costs associated with the initial cleaning of equipment in the unit bid price for Mobilization.
Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO.
FSSS-152-01
Section 152 – CONSTRUCTION SURVEY AND STAKING
152.01(c) Material.
Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.
Do not use aerosol spray paints.
Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.
152.02 General.
Delete the first two sentences.
When indicated on the plans, a preliminary survey line has been established on the ground. The project location line is established by offsets from this preliminary line.
Delete second sentence in second paragraph and replace with the following:
Re-establish missing reference, control lines, or stakes as necessary to control subsequent construction staking operations
152.03 Survey and Staking Requirements.
(b) Roadway cross-sections.
Replace the first two sentences with the following:
Take roadway cross-sections normal to centerline. When the centerline curve radius is less than or equal to 200 feet, take cross-sections at a maximum centerline spacing of 25 feet. When the centerline curve radius is greater that 200 feet take cross-sections at a maximum centerline spacing of 80 feet.
(c) Slope Stakes & References:
Replace section with the following:
When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.
Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.
Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.
Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.
Use the designated method to establish the slope stake catchpoint:
Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Re-catch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.
Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.
(e) Clearing and grubbing limits.
Establish clearing limits on each side of the location line by measuring the required horizontal or slope distances shown in the stake notes. Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.
After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line.
(f) Centerline re-establishment.
Replace with the following:
Re-establish centerline from instrument control points. The maximum spacing between centerline points is 25 feet when the centerline curve radius is less than or equal to 200 feet. When the centerline curve radius is greater than 200 feet, the maximum distance between centerline points is 80 feet.
(f) Culverts.
Replace subsection with the following:
Set culvert reference stakes at all culvert locations. Set a culvert reference stake on the centerline of the culvert 10 feet from each end or beyond the clearing limit, whichever is greater. Record the following on culvert reference stakes:
(1) Diameter, actual field measured length, and type of culvert.
(2) The vertical and horizontal distance from the reference stake to the invert at the ends of the culvert.
(3) Station of actual point where culvert intersects centerline.
When required, stake headwall for culverts by setting a hub with a guard stake on each side of the culvert on line with the face of the headwall. Perform this work after clearing is completed.
152.03 (l) Miscellaneous Survey and Staking.
(12) Drain Dips
Replace Table 152-1 with the following two tables:
Table 152-1 Tolerances for reestablishing P-line, traverse, and elevations.
Precision Class
Minimum Position Closure Angular Accuracy (±)
L-Line Tangent Control Pointsa (±)
Vertical Closureb (±)
A (Bridges)
1/10,000 2 sets, direct/reverse 10 second rejection limit
N/A
0.02 ft or 0.02ft/1000ftc
B 1/5,000 2 sets, direct/reverse 20 second rejection limit
0.1 ft
0.02 ft or 0.02ft/1000ftc
C 1/1,000 1 set, direct/reverse 1 minute rejection limit
0.2 ft 0.5ft/1000ftc
D 1/300 Foresight and backsight; 15 minute rejection limitc
0.4 ft 1.0ft/1000ftc
E 1/100 Foresight and backsight; 30 minute rejection limitc
0.8 ft 1.0ft/1000ftc
a. Accuracy of offset measurement.
b. Determine vertical closures at intervals not to exceed 2000 ft as measured along centerline.
c. Use greater value.
Table 152-2 Cross section and slope stake tolerances.
Item Tolerances
A B C D E
Allowable deviation of cross-section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves
(±)2o (±)3o (±)3o (±)5o (±)5o
Take cross-sections topography measurements so that variations in ground from a straight line connecting the cross-section points will not exceed
0.5 ft 1.0 ft 2.0 ft 2.0 ft 3.0 ft
Horizontal and vertical accuracy for cross-sections, in feet or percentage of horizontal distance measured from traverse line, whichever is greater.
0.1 ft or 0.4%
0.15 ft or 0.6%
0.2 ft or 1.0%
0.2 ft or 1.0%
0.3 ft or 1.0%
Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured from centerline or reference stake, whichever is greater.
Slope reference stakes and slope stakes. 0.1 ft or 0.4%
0.15 ft or 0.6%
0.2 ft or 1.0%
0.2 ft or 1.0%
0.3 ft or 1.0%
Clearing limits 1.0 ft 1.0 ft 1.0 ft 1.5 ft 2.5 ft
155 - Schedules for Construction Contracts
155.00_nat__us05_11_2004
155 Delete.
Delete Section 155 in its entirety.
FSSS-156
Section 156 —PUBLIC TRAFFIC
156.00_nat__us02_24_2005
Delete Section 156 in its entirety and replace with the following:
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633
156.03 General. Existing roads on which this work will be performed are currently closed. Submit a traffic-control plan for the CO’s approval before beginning work. Plan will address restriction of public access while work is being done.
Post construction signs in conformance with MUTCD. All required signs shall be in place and approved prior to beginning work on project.
156.04 Temporary Traffic Control. Install and maintain temporary traffic-control signs adjacent to and within the project as required by the approved traffic-control plan and the MUTCD.
Install and maintain ROAD CLOSED signs and warnings, as indicated in approved traffic-control plan.
Maintenance and replacement of damaged signs will be the contractor’s responsibility.
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment for Item 151.01.
FSSS-201-1 (Page 1 of 2)
201 - CLEARING AND GRUBBING
201.01
Replace with the following:
This work consists of clearing and grubbing within clearing limits and other designated areas.
201.02
Delete tree wound dressing material reference.
201.03 General.
Delete the first sentence.
Delete the last sentence.
201.04 Clearing.
Delete paragraph (c) and replace with the following:
(c) In areas outside the excavation, embankment, and slope-rounding limits, cut stumps to within 12 inches or one-third of the stump diameter of the ground, whichever is higher, measured on the side adjacent to the highest ground. For timber sales, stump heights will meet the requirements of the Timber Sale Contract.
Delete paragraph (d) and replace with the following:
(d) Do not cut vegetation less than 3 feet tall and less than 3 inches in diameter; that is within the clearing limits but beyond the roadway and not in a decking area; and that does not interfere with sight distance along the road.
Add the following:
(e) Trim branches of remaining trees or shrubs to give a clear height of 14 feet above the roadbed unless otherwise indicated. Trim tree limbs as near flush with the trunk as practicable.
(f) Remove brush from log decks. Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage; and will not roll. Keep logs in log decks free of brush and soil.
MARCH 2005
FSSS-201-1 (Continued, page 2 of 2)
(g) Remove dead trees over 6 inches in diameter measured at 12 inches above the ground that lean toward the road and are tall enough to reach the roadbed.
Add the following:
All merchantable R/W timber is included timber of East Lost Squirrel Stewardship.
Utilization standards and scaling services for merchantable timber are listed in Appendix B, Division A.
Fell and buck merchantable material into suitable lengths. Pieces (logs) meet utilization standards when such pieces would have met Utilization Standards if bucking lengths were varied to include such material.
201.05 Grubbing.
Delete entire paragraph and replace with the following:
Grub all embankment areas. Undisturbed stumps may be left in place if they protrude less than 6 inches above the original ground and will be covered with more than 2 feet of embankment.
201.06 Disposal.
Delete the first sentence of this subsection and substitute the following:
Dispose of merchantable timber designated for removal according to the provisions of the timber sale contract.
Delete the second sentence.
Add the following:
Dispose of clearing and grubbing debris by method (e) Scattering.
(e) Scattering. Scatter construction slash outside the roadway without damaging trees. Limb all logs not meeting utilization standards. Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations.
201.07 Acceptance.
Delete the second and third sentences.
FSSS-204-1 (Page 1 of 5)
Section 204 - EXCAVATION AND EMBANKMENT
204.03 Conform to the following Subsections:
Unclassified borrow 704.06 Pit-run aggregate 322.02 Water 725.01
Add the following:
Generate embankment, pit-run, and rip-rap material through excavation of Section “B” of road 50834.
Suitable pit-run material shall be used as surfacing for Section “A” of the same road. (See Section 322 – Aggregate Placement.) Riprap is to be used for culvert inlet and outlet. (See Sections 602 – Culverts and Drains and 251 – Riprap.)
204.05 Conserved Topsoil
Delete the entire paragraph.
204.06 Roadway Excavation
(b) Rock Cuts.
When blasting rock, use blasting methods according to Subsection 205.
204.10 Embankment Construction.
Obtain written approval before beginning construction of embankments over 6 feet high at subgrade centerline.
(a) General.
Delete the third paragraph and add the following:
Compact embankment side slopes flatter than 1V:1.75H with a tamping type roller or by walking with a dozer. For slopes 1V:1.75H or steeper, compact the slopes as construction of the embankment progresses.
FSSS-204-1 (Page 2 of 5)
(b) Embankment within the roadway prism.
Delete the last sentence of the first paragraph.
Delete the last sentence of the second paragraph.
Add the following:
(e) Side Casting and End Dumping. Embankment may be placed by side casting and end dumping.
Build solid embankments by working smaller rocks and fines in with larger rocks and fines to fill the voids.
204.11 Compaction
Delete the first paragraph and replace it with the following:
For compaction methods (d) or (e) no sieve test is required.
Add the following:
For Embankment Construction Method (d) and (e) no compaction testing is required. Compaction for method (e) will be accomplished by operating hauling and spreading equipment uniformly over the full width of each layer. Moisture content of the material will be adjusted to obtain a level adequate for compaction.
Add the following compaction methods:
(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.
(e) Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, in when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.
204.13 Sloping, Shaping, and Finishing.
Construct roads in this project to tolerance class “I”. Refer to Table 204-2.
(a) Sloping.
FSSS-204-1 (Page 3 of 5)
Slope rounding is not required on tolerance class D though M roads.
Delete section (d) and add the following:
(d) Finishing. For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed. For all roads, finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the tolerance class shown in table 204-2.
Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing. Scarify to 6 inches below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material. Maintain proper ditch drainage.
For unsurfaced roads, use one of the following methods to finish the roadbed:
Method A. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.
Method B. Use a vibratory roller or approved substitute with a minimum weight of 5 tons. Roll at least 5 full-width passes or until visible displacement ceases.
FSSS-204-1 (Page 4 of 5)
Add Table 204-2—Construction Tolerances:
T ab le
-2
C on st ru ct io n
T ol er an ce s
T ol er an ce C la ss
(a
M
2.
(c
(c
(a
M ax im um a llo w ab le d ev ia tio n fr om c on st ru ct io n st ak es a nd d ra w in gs
(b
M ax im um a llo w ab le d ev ia tio n fr om s ta ke d sl op e m ea su re d fr om s lo pe s ta ke s or h in ge p oi nt s.
(c
U nl es s ot he rw is e sh ow n th e ce nt er li ne a li gn m en t a nd s ub gr ad e el ev at io n, a s bu il t, ha ve n o ho ri zo nt al c ur ve s w it h a ra di us o f le ss th an fe et , a nd n o ve rt ic al c ur ve s w it h a cu rv e le ng th o f le ss th an fe et w he n th e al ge br ai c di ff er en ce in th e gr ad e ch an ge is le ss th an pe rc en t, or a c ur ve le ng th o f le ss th an f ee t w he n th e al ge br ai c di ff er en ce o f
L
3.
5.
K
2.
3.
J
2.
3.
3.
I
2.
2.
2.
H
1.
1.
1.
G
1.
1.
F
1.
1.
E
0.
1.
D
0.
0.
0.
0.
B
0.
0.
0.
A
0.
0.
0.
R oa db ed w id th
(f t)
S ub gr ad e el ev at io n
(f t) en te rl in e al ig nm en t ( ft
S lo pe s, ex ca va tio n, a nd em ba nk m en t s lo pe (b
FSSS-204-1 (Page 5 of 5)
204.14 Disposal of Unsuitable or Excess Material.
Delete the text of the first paragraph and substitute the following:
Dispose of unsuitable or excess material at designated sites or legally off of the project.
204.15 Acceptance
Acceptance of roadway excavation and embankment is based on visual inspection of the work for compliance with the contract.
Table 204-1 Sampling and Testing Requirements.
Add the following note to the table:
(2) When compaction methods (d) or (e) are used, AASHTO M 145, T 99, T 180, and T 310 are not required for earth embankment test methods.
204.16 Roadway excavation and embankment will not be measured for payment. The Contract Quantities for excavation and embankment will be as shown on the Schedule of Items.
FSSS-251-1
Section 251 - RIPRAP
Delete section 251.05 Keyed Riprap and replace with the following:
251.05 Hand-Placed Riprap. Hand-placed riprap is rock placed by hand on a prepared surface. Use class 2 Riprap as shown below:
Class Percent of Mass Approximate Rock by Mass (pounds) Cubic Dimension (Inches) 2 20 55 to 110 8 to 10 30 22 to 55 6 to 8 40 2 to 22 3 to 6 10 0 to 2 0 to 3
Riprap is to be placed to its full depth by manual methods to obtain a compact, uniformly-thick blanket with a reasonably-smooth surface.
FSSS-303-1 (Page 1 of 2)
Section 303 - ROAD RECONDITIONING
303.03 Ditch Reconditioning.
Delete and replace with the following:
Remove all slide material, rocks, and debris from existing ditches and culvert inlets and outlets. Leave vegetation in ditch if it is not interfering with the flow in the ditch line.
303.04 Shoulder Reconditioning.
Delete and replace with the following:
Repair as needed for removal of berms, drainage, safety, and smooth alignment.
303.05 Roadbed Reconditioning.
Blade roadbed only as needed to remove slide material, rocks, debris, and surface irregularities, such as wheel ruts, water bars, slumps, etc. Leave vegetation in place if the template is smooth and in good condition. Maintain existing drainage patterns, such as driveable dips, as much as possible. Adjust the moisture content of the material as needed to obtain compaction. (Water is incidental to Road Reconditioning.) Compact the roadbed after blading by making one pass over the entire roadbed with a smooth drum roller, regardless of whether the roadbed has been bladed or not.
303.06 Aggregate Surface Reconditioning.
Delete the section.
303.09 Acceptance.
Acceptance for road reconditioning work is based on visual inspection of the work for compliance with the contract.
FSSS-303-1 (Continued, Page 2 of 2)
303.10
Delete and replace with the following:
Road Reconditioning mileage will not be measured for payment. The Contract Quantity for road reconditioning by the mile will be as shown on the Schedule of Items.
FSSS-322-1
Section 322 – CRUSHED AGGREGATE
322.01 This work consists of furnishing and placing one or more courses of pit-run aggregate on a prepared surface. Work includes producing aggregate by grid rolling, screening, or crushing methods, and placing pit-run aggregate.
322.02 Conform to the following:
Aggregate: No quality requirements or gradation other than maximum size will be required for pit run and grid-rolled materials. Pit-run maximum size for this project is 4-inch minus. For grid rolling, use all suitable material that can be reduced to maximum size.
Water: Furnish water free of substances detrimental to the work.
322.03 General. Prepare the surface on which the aggregate course is placed according to Section 204 or 303 as applicable.
Request approval of the roadbed in writing before placing aggregate.
Develop, haul, and apply water as needed to adjust moisture content. Install screens on the water-truck pump intakes with maximum openings of 3/32 inch. This is to protect aquatic organisms.
After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.
If the aggregate is produced and stockpiled before placement, handle and stockpile as directed by the CO.
322.04 Mixing and Spreading. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with moisture content suitable for compaction. Spread and shape the mixture on the prepared surface in a uniform layer with no segregation of size, and to a loose depth that will provide the required compacted thickness.
Do not place in layers exceeding 6 inches in compacted thickness for aggregate base and surface courses.
When more than one layer is necessary, compact each layer according to Subsection 322.05 before placing the next layer. Route hauling and leveling equipment uniformly over the full width.
322.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Compact as specified in Subsection 204.11(d) or (e).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Compact as specified in Subsection 204.11(d) or (e).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a reasonably smooth surface.
322.06 Construction Tolerance. If grade finishing stakes are required, finish the surface to within ±2 feet from staked line and grade elevation. (Refer to Construction Tolerance “I” in Table 204-2.)
Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.
Ensure that the compacted thickness is not consistently above or below the specified thickness.
Ensure that the compacted width is not consistently above the specified width.
322.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross section by blading, watering, rolling, or any combination thereof until placement of the next course. Correct all defects according to Subsection 322.06.
322.08 Acceptance. Other aggregate properties will be evaluated under Subsections 106.02 and 106.04.
Placement of aggregate courses will be evaluated under Subsections 106.02 and 106.04.
Preparation of the surface on which the aggregate course is placed will be evaluated under Section 204 or 303 as applicable.
322.09 Furnishing and placement of pit-run aggregate will be paid by the cubic yard, compacted in place.
FSSS-602-1
Section 602 - CULVERTS AND DRAINS
602.03 General
Delete the last sentence.
Add the following:
Construct the width of trenches in natural ground to permit satisfactory joining of the culvert sections and thorough tamping of the bedding material under and around the culvert. Excavate trenches to a minimum width equal to the culvert diameter plus 2 feet.
Excavate unstable material below grade line and replace with suitable material. Ensure that the foundation material is at a moisture level that is suitable for compaction. Compact foundation material using compaction equipment designed for this purpose until visual displacement ceases.
Cover the foundation with a blanket of loose material to a depth sufficient to allow the corrugations to become filled with the material.
Place backfill in horizontal layers that do not exceed 6 inches. Ensure that the backfill material is at a moisture level that is suitable for compaction. Do not use rocks larger than 3 inches within 12 inches of the pipe. Compact each layer using compaction equipment designed for this purpose until visual displacement ceases.
Bring backfill up evenly on all sides. Extend each layer to the limits of the excavation or to natural ground. Continue backfilling and compacting until backfill is a minimum of 12 inches above the top of the culvert.
602.08 Acceptance.
Delete the following:
Delete the words “and 106.04.” from the second paragraph.
Delete the third paragraph.
Other files
| File | Type | Posted |
|---|---|---|
| amend 01 9004.pdf | ||
| ELSQ_StewMap.pdf | ||
| East_Lost_Sq_RDdesign_final.pdf | ||
| East Lost Squirrel Solicitation.doc | DOC document | |
| ARRA Signs for contract.pdf | ||
| ELSQ_TSMap.pdf | ||
| ARRA signs contract specs.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .