SPS 619.pdf

PDF 17 KB Posted

Attached to
Williams Dam Restoration
Solicitation number
AG-82B1-S-10-0427
Issued by

About this file

SPS 619

View the file

Other files

File Type Posted
AG-82B1-S-10-0427 SF 1442.pdf PDF
Experience Questionnaire.pdf PDF
Construction Specifications.pdf PDF
WilliamsDam-001.pdf PDF
AG-82B1-S-10-0427 Body.pdf PDF
GENERAL DECISION .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PROJECT SPECIFICATION

619 Fences, Gates and Cattleguards:

Add the following

Fences

The fence location as shown on plan sheet #3 shall be staked by Forest Service.

The required corner panels and line braces shall not be measured separately but shall be considered incidental to the pay item 619 as listed in the schedule of items.

Gates

The pedestrian gates (2) location shown on plan sheet #3 shall be staked by Forest

Service. The contractor shall provide and install pedestrian gate as shown on plan sheet

#10. All costs for gate installation shall not be measured seperately but shall be considered incidental to the pay item 619 as listed in the schedule of items.

The wire bypass gate (1) as shown on sheets 3 and 10 of the plans shall have a Gate

Closure-Metal Gate closures shall be "Sure Shut" or approval equal. Gate Closure shall be approved by COR. Possible source for gate closure-B&B Fabrications, Grass Range, Montana

(406) 428-2355. No separate measurement shall be made and all costs for providing and installing shall be incidental to pay item 619 as listed in the schedule of items.

Cattle Guards

The existing cattleguard to be moved and the one (1) new cattleguard to be installed shall have the locations staked by the Forest Service.

SPS 619 (4/10)