Enclosed is the Amendment for the AG-82B1-S-10-0419. NOTE Response due date have NOT change. Terms and Conditions remain unchanged

View the file

Other files

File Type Posted
Morris Creek plans.pdf PDF
Morris Creek FSSS.pdf PDF
AG-82B1-S-10-0419.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

Amendment No. 001

3. EFFECTIVE DATE

07/26/2010

4. REQUISITION/PURCHASE REQ. NO.

397090

5. PROJECT NO. (If applicable)

CIM-O1R

6. ISSUED BY CODE |82B1

US Forest Service

EROC Intermountain

740 Simms Street

Golden, CO 80401-4720

7. ADMINISTERED BY (If other than Item 6) CODE 02RC

US Forest Service

Clearwater National Forest

12730 Highway 12

Orofino, Idaho 83544

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State, and

ZIP Code)

(X) 9A. AMENDMENT OF SOLICITATION NO.

AG-82B1-S-10-0419

X

9B. DATED (SEE ITEM 11)

July 7, 2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ___ 1_____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO

BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virture of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _____ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AG-82B1-S-10-0419, Morris Creek Deep Fill Culverts, is amended as follows:

SEE PAGE 2 FOR CHANGES. THE HOUR AND DATE FOR RECEIPT OF OFFERS IS NOT EXTENDED.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TERRI L. OTT

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY: ____________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Morris Creek Deep Fill solicitation AG-82B1-S-10-0419

Amendment #1, Page 2 of 2

Correct and clarify the date and time for receipt of offers on Standard

Form 1442: OFFERS MUST BE RECEIVED AT THE CLEARWATER

NATIONAL FOREST OFFICE BY AUGUST 6, 2010 AT 4:00 PM

PACIFIC TIME.

Clearing debris, not utilized to cover reconstructed fills, may be disposed of at the borrow and waste site @ M.P. 0.3 on Road 1969A in lieu of disposal off of Forest Service property. Disposal shall be by the bury method – FP-

03; 203.05(c).

This deletes disposal method in FSSS 203.05 (g) and adds disposal method

203.05(c) as described in Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03.

Maintenance on Elk Creek Road 382 from the junction of Morris Creek Road

1969 to junction with county road 1705 shall be performed by the

Contractor commensurate with their use. This maintenance will include surface grading and dust abatement. Payment for this maintenance is incidental to pay items requiring heavy haul use of this road.

Elk Creek is available as a water source for this project. Contractor shall comply with all laws and regulations of the State of Idaho regarding this use. This modifies FSSS 625.02 D.

On Sheet S1-C , Plan View of Culvert Alignment, construction note on lower left corner should read:

“Existing log culvert: remove inlet portion for a minimum distance of 10’ or as required to allow placement of new culvert, place select borrow per 704.07, incorporate 25% bentonite, hydrate and compact per 204.11 to create water cutoff.”