SOLICITATION SCHEDULE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 2 SF 30.PDF | ||
| SF 30.pdf | ||
| Wilderness Gateway .pdf | ||
| SF 1442AG-82B1-S-10-0364.pdf | ||
| FWBM_FSSS_100percent.pdf | ||
| ID15_04162010 Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERMOUNTAIN EMERGENCY RECOVERY OPERATION CENTER
INSTRUCTIONS
ISSUING OFFICE: U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
INTERMOUNTAIN EROC
740 SIMMS STREET
GOLDEN, CO 80401
FAX (303) 275-5299
SOLICITATION NO.: AG-82B1-S-10-0364
OFFERS ARE SOLICITED FOR: RECOVERY –WILDERNESS GATEWAY BRIDGE
IMPORTANT – NOTICE TO OFFEROR:
AT A MINIMUM, OFFEROR SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR RESPONSE TO THIS
SOLICITATION:
1. SF-1442 Solicitation, Offer, and Award (Complete, date, and sign)
2. Section B – Schedule of Items (Page 6). (Complete Unit Price and Amount)
3. Section K – Representations and Certifications (Pages 46-55). (Complete the Representations and
Certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov)
5. Bid Guarantee –A bid guarantee is required.
6. Acknowledgement of Amendments IT IS REQUIRED THAT YOU WRITE THE SOLICITATION NUMBER ON THE OUTSIDE OF YOUR ENVELOPE.
Return to: USDA, Forest Service Intermountain EROC/ ATTN: PHYLLIS R. COBURN-HARRIEL 740 Simms Street Golden, CO 80401
REF SOL#: AG-82B1-S-10-0364
IT IS REQUIRED THAT ALL CONTRACTOR’S BE REGISTERED IN THE CENTRAL CONTRACTOR
REGISTRATION DATABASE PRIOR TO AWARD UNDER THIS SOLICITATION. SEE CLAUSE
FAR 52.204-7 CENTRAL CONTRACTOR REGISTRATION FOR DETAILS ON HOW TO APPLY.
ALL SOLICITATIONS SHALL BE ISSUED THROUGH FEDBIZOPS. NO PAPER SOLICITATIONS SHALL BE
ISSUED. IT IS THE OFFERORS RESPONSIBILITY TO WATCH FOR ANY AND ALL AMENDMENTS TO THE
SOLICITATION, WHICH SHALL BE ISSUED ELECTRONICALLY THROUGH FEDBIZOPS
Wilderness Gateway Bridge Sol #: AG-82B1-S-10-0364
Clearwater National Forest Page 5 of 66
TABLE OF CONTENTS
SECTION B: SUPPLIES OR SERVICES/PRICES
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION F – DELIVERIES OR PERFORMANCE
SECTION H – SPECIAL CONTRACT REQUIREMENTS
SECTION I: Contract Clauses
SECTION J: List of Documents, Exhibits, and Other Attachments
SECTION K: Representations, Certifications, and Other Statements of Offerors or Respondents
SECTION L: Instructions, Conditions, and Notices to Offerors or Respondents
SECTION M: Evaluation Factors for Award
Clearwater National Forest Page 6 of 66
SECTION B: SUPPLIES OR SERVICES/PRICES
Wilderness Gateway Bridge Maintenance (Bridge No. 1649 - 0.1)
Clearwater National Forest
Lochsa Ranger District
Idaho County, ID
B-1 SCHEDULE OF ITEMS
ITEM DESCRIPTION
METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization LSQ LS 1 $ _____ $ _____
20305 Removal of Structures & Obstructions (Remove Existing Rail & Curb - Bridge & Approach)
LSQ LS 1 $ _____ $ _____
55213 Reseal Expansion Joints CQ LF 130 $ _____ $ _____
55214 Patch Concrete Deck LSQ LS 1 $ _____ $ _____
55601 T101 Bridge Railing CQ LF 535 $ _____ $ _____
55609 Bridge Approach Railing, Type I, Class A
CQ LF 150 $ _____ $ _____
55607 Terminal Section, Class B CQ EA 4 $ _____ $ _____
61911 Remove & Reinstall Road Gate AQ EA 1 $ _____ $ _____
62201 Equipment Rental, Hydraulic Excavator with Thumb
AQ HR 4 $ _____ $ _____
62202 Equipment Rental, Large Dump Truck
AQ HR 4 $ _____ $ _____
TOTAL:
B-2 NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed- Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under
151.01 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
Clearwater National Forest Page 7 of 66
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 - PROJECT DESCRIPTION AND LOCATION
a. Description of Work. This work consists of removing existing bridge rail and curb, resealing bridge expansion joints, patching bridge deck, installing new T101 bridge rail, and installing new bridge approach rail. This work will also include all other labor, materials and supplies needed to complete the work as required by the contract, plans, and specifications.
b. Project Location. The project site is located at milepost 122.63 on US Highway 12. From Orofino, Idaho, travel east on US Highway 12 to milepost 122.63. At mile post 122.63 turn south (right) at Wilderness Gateway Campground, travel approximately 0.1 miles to the project location.
c. Price Range. ($100,000 - $250,000)
d. Pre-Bid Tour. No pre-bid tour. Pictures of the site are available.
e. Start Work. It is estimated that work will begin on July 12, 2010. Contract time will run continuously with no shut down for normal winter season.
f. Period of Performance. (See Part I, Section F, Clause 52.212-3)
g. Construction Timing. All work must be completed by September 3, 2010. No work shall be performed on weekends.
C-2 - GOVERNMENT FURNISHED MATERIAL
There are no government furnished materials in this contract.
C-3 - APGAR 452.236-78 STANDARD SPECIFICATIONS
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S.
Customary Units are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract. Copies of these Specifications are available on the internet at www.wfl.fha.dot.gov/design/specs/fp03.htm
C-4 - FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS
Forest Service supplementary specifications are included as a separate APPENDIX of this solicitation. The supplementary specifications applicable to this project are listed in Appendix A.
Clearwater National Forest Page 8 of 66
C-5 – DRAWINGS (Entitled: Wilderness Gateway Bridge Maintenance”)
The following drawings are a part of this solicitation and any resulting contract:
Title Page
Cover Sheet
General Notes, Estimated Quantity Table & General Bridge Photos
Bridge Plan and Elevation and Listed Work Items. 2
Repair Details 3
T101 Bridge Railing Details 4
USFS DWG. NO. R1902, Standard Bridge W-beam Approach Guardrail (Sheet 1 of 2)
USFS DWG. NO. R1902, Standard Bridge W-beam Approach Guardrail (Sheet 2 of 2)
Clearwater National Forest Page 9 of 66
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
Clearwater National Forest Page 10 of 66
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
…commence work under this contract within 10 calendar days after the effective date of Notice to Proceed…
…complete the entire work ready for use no later than September 3, 2010.
FAR 52.211-18 Variation in Estimated Quantity (APR 1984)
Add the following:
Adjustment of contract prices as described in this section shall not apply to Section 622, Rental Equipment, Item 62201, Hydraulic Excavator with Thumb and 62202, Large Dump Truck. The Government reserves the right to reduce or eliminate entirely the work under this item with no adjustment in contract unit price.
52.242-14 Suspension of Work. (APR 1984)
452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996)
Within [ ] calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work.
The maximum workweek that will be approved will be submitted to the COR and approved by the CO.
(End of clause)
Clearwater National Forest Page 11 of 66
SECTION H – SPECIAL CONTRACT REQUIREMENTS
52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009.
(MAR 2009)
(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5).
(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.
52.204-11 American Recovery and Reinvestment Act--Reporting Requirements. (MAR 2009)
(a) Definitions. As used in this clause--
"Contract," as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C.
6301, et seq. For discussion of various types of contracts, see FAR Part 16.
"First-tier subcontract" means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act.
"Jobs created" means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.
"Jobs retained" means an estimate of those previously existing filled positions that are retained as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.
"Total compensation" means the cash and noncash dollar value earned by the executive during the contractor's past fiscal year of the following (for more information see 17 CFR 229.402(c)(2)):
(1) Salary and bonus.
(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised
Clearwater National Forest Page 12 of 66
2004) (FAS 123R), Shared Based Payments.
(3) Earnings for services under non-equity incentive plans. Does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.
(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.
(5) Above-market earnings on deferred compensation which is not tax-qualified.
(6) Other compensation. For example, severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property if the value for the executive exceeds $10,000.
(b) This contract requires the contractor to provide products and/or services that are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act). Section 1512(c) of the Recovery Act requires each contractor to report on its use of Recovery Act funds under this contract. These reports will be made available to the public.
(c) Reports from contractors for all work funded, in whole or in part, by the Recovery Act, and for which an invoice is submitted prior to June 30, 2009, are due no later than July 10, 2009.
Thereafter, reports shall be submitted no later than the 10th day after the end of each calendar quarter.
(d) The Contractor shall report the following information, using the online reporting tool available at http://www.FederalReporting.gov.
(1) The Government contract and order number, as applicable.
(2) The amount of Recovery Act funds invoiced by the contractor for the reporting period. A cumulative amount from all the reports submitted for this action will be maintained by the government's on-line reporting tool.
(3) A list of all significant services performed or supplies delivered, including construction, for which the contractor invoiced in this calendar quarter.
(4) Program or project title, if any.
(5) A description of the overall purpose and expected outcomes or results of the contract, including significant deliverables and, if appropriate, associated units of measure.
(6) An assessment of the contractor's progress towards the completion of the overall purpose and expected outcomes or results of the contract (i.e., not started, less than 50 percent completed, completed 50 percent or more, or fully completed). This covers the contract (or portion thereof) funded by the Recovery Act.
(7) A narrative description of the employment impact of work funded by the Recovery Act. This narrative should be cumulative for each calendar quarter and only address the impact on the contractor's workforce. At a minimum, the contractor shall provide--
(i) A brief description of the types of jobs created and jobs retained in the United States and outlying areas (see definition in FAR 2.101). This description may rely on job titles, broader labor categories, or the contractor's existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work; and
Clearwater National Forest Page 13 of 66
(ii) An estimate of the number of jobs created and jobs retained by the prime contractor, in the United States and outlying areas. A job cannot be reported as both created and retained.
(8) Names and total compensation of each of the five most highly compensated officers of the Contractor for the calendar year in which the contract is awarded if--
(i) In the Contractor's preceding fiscal year, the Contractor received--
(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and
(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and
(ii) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.
(9) For subcontracts valued at less than $25,000 or any subcontracts awarded to an individual, or subcontracts awarded to a subcontractor that in the previous tax year had gross income under $300,000, the Contractor shall only report the aggregate number of such first tier subcontracts awarded in the quarter and their aggregate total dollar amount.
(10) For any first-tier subcontract funded in whole or in part under the Recovery Act, that is over $25,000 and not subject to reporting under paragraph 9, the contractor shall require the subcontractor to provide the information described in (i), (ix), (x), and (xi) below to the contractor for the purposes of the quarterly report. The contractor shall advise the subcontractor that the information will be made available to the public as required by section 1512 of the Recovery Act. The contractor shall provide detailed information on these first-tier subcontracts as follows:
(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent company, if the subcontractor has a parent company.
(ii) Name of the subcontractor.
(iii) Amount of the subcontract award.
(iv) Date of the subcontract award.
(v) The applicable North American Industry Classification System (NAICS) code.
(vi) Funding agency.
(vii) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.
(viii) Subcontract number (the contract number assigned by the prime
Clearwater National Forest Page 14 of 66 contractor).
(ix) Subcontractor's physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.
(x) Subcontract primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.
(xi) Names and total compensation of each of the subcontractor's five most highly compensated officers, for the calendar year in which the subcontract is awarded if--
(A) In the subcontractor's preceding fiscal year, the subcontractor received--
(l) 80 percent or more of its annual gross revenues in Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and
(2) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and
(B) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.
52.214-26 Audit and Records - Sealed Bidding. (MAR 2009) -- Alternate I (MAR 2009)
(a) As used in this clause, "records" includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form.
(b) Cost or pricing data. If the Contractor has been required to submit cost or pricing data in connection with the pricing of any modification to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the cost or pricing data, shall have the right to examine and audit all of the Contractor's records, including computations and projections, related to -
(1) The proposal for the modification;
(2) The discussions conducted on the proposal(s), including those related to negotiating;
(3) Pricing of the modification; or
(4) Performance of the modification.
(c) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized
Clearwater National Forest Page 15 of 66 representative of either of the foregoing officials, shall have access to and the right to--
(1) Examine any of the Contractor's or any subcontractors' records that pertain to, and involve transactions relating to, this contract or a subcontract hereunder; and
(2) Interview any officer or employee regarding such transactions.
(d) Availability. The Contractor shall make available at its office at all reasonable times the materials described in paragraph (b) of this clause, for examination, audit, or reproduction, until 3 years after final payment under this contract, or for any other period specified in Subpart 4.7 of the Federal Acquisition Regulation (FAR). FAR Subpart 4.7, Contractor Records Retention, in effect on the date of this contract, is incorporated by reference in its entirety and made a part of this contract.
(1) If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.
(2) Records pertaining to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to the performance of this contract shall be made available until disposition of such appeals, litigation, or claims.
(e)(1) Except as provided in paragraph (e)(2), the Contractor shall insert a clause containing the provisions of this clause, including this paragraph (e), in all subcontracts.
(2) The authority of the Inspector General under paragraph (c)(2) of this clause does not flow down to subcontracts.
Alternate I (Mar 2009). As prescribed in 14.201-7(a)(2) substitute the following paragraphs (c) and (e) for paragraphs (c) and (e) of the basic clause:
(c) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials, shall have access to and the right to—
(1) Examine any of the Contractor’s or any subcontractors' records that pertain to, and involve transactions relating to, this contract or a subcontract hereunder; and
(2) Interview any officer or employee regarding such transactions.
(e)(1) Except as provided in paragraph (e)(2), the Contractor shall insert a clause containing the provisions of this clause, including this paragraph (e), in all subcontracts.
(2) The authority of the Inspector General under paragraph (c)(2) of this clause does not flow down to subcontracts.
52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American
Act--Construction Materials. (MAR 2009)
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Clearwater National Forest Page 16 of 66
"Domestic construction material" means--
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States.
"Foreign construction material" means a construction material other than a domestic construction
"Manufactured construction material" means any construction material that is not unmanufactured construction material.
"Steel" means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
"Unmanufactured construction material" means raw material brought to the construction site for incorporation into the building or work that has not been--
(1) Processed into a specific form and shape; or
(2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials.
(b) Domestic preference. (1) This clause implements--
(i) Section 1605 of the American Recovery and Reinvestment Act of 2009 (Recovery Act) (Pub. L. 111-5), by requiring, unless an exception applies, that all iron, steel, and other manufactured goods used as construction material in the project are produced in the United States;
and
(ii) The Buy American Act (41 U.S.C. 10a-10d) by providing a preference for unmanufactured domestic construction material.
(2) The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraph (b)(3) and (b)(4) of this clause.
(3) This requirement does not apply to the construction material or components listed by the Government as follows:
NONE
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--
(i) The cost of domestic construction material would be unreasonable.
(A) The cost of domestic iron, steel, or other manufactured goods used as construction material is unreasonable when the cumulative cost of such material will increase the cost of the contract by more than 25 percent;
(B) The cost of unmanufactured construction material is unreasonable
Clearwater National Forest Page 17 of 66 when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or
(iii) The application of the restriction of section 1605 of the Recovery Act or the Buy American Act to a particular construction material would be inconsistent with the public interest.
(c) Request for determination of inapplicability of Section 1605 of the Recovery Act or the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Cost;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(4) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this clause.
(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to section 1605 of the Recovery Act or the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to section 1605 of the Recovery Act or the Buy American Act applies, use of foreign construction material is
Clearwater National Forest Page 18 of 66 noncompliant with section 1605 of the American Recovery and Reinvestment Act or the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Cost Comparison
Construction material description Quantity Unit of measure Cost (dollars)*
Item 1:
Foreign construction material [ ] Domestic construction material [ ]
Item 2:
Foreign construction material [ ] Domestic construction material [ ]
(List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.)
(Include other applicable supporting information.)
(* Include all delivery costs to the construction site.)
(End of clause)
52.225-22 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods--Buy
American Act--Construction Materials. (MAR 2009)
(a) Definitions. "Construction material," "domestic construction material," "foreign construction material," "manufactured construction material," "steel," and "unmanufactured construction material," as used in this provision, are defined in the clause of this solicitation entitled "Required Use of Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-21).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub.
L. 111-5) (Recovery Act) or the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-21 in the request. If an offeror has not requested a determination regarding the inapplicability of 1605 of the Recovery Act or the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American Act by adding to the offered price of the contract--
(i) 25 percent of the offered price of the contract, if foreign iron, steel, or other manufactured goods are used as construction material based on unreasonable cost of comparable manufactured domestic construction material; and
Clearwater National Forest Page 19 of 66
(ii) 6 percent of the cost of foreign unmanufactured construction material included in the offer based on unreasonable cost of comparable domestic unmanufactured construction material.
(2) If two or more offers are equal in price, the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the offeror on the basis of unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-21, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer and a separate cost comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-21 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-21 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
52.225-22 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods--Buy
American Act--Construction Materials. (MAR 2009) -- Alternate I (MAR 2009) material," "manufactured construction material," "steel," and "unmanufactured construction material," as used in this provision, are defined in the clause of this solicitation entitled "Required Use of Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-21).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub.
L. 111-5) (Recovery Act) or the Buy American Act shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-21.
(c) Evaluation of offers. (1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies, the Government will evaluate an cost of comparable manufactured domestic construction material; and
(ii) 6 percent of the cost of foreign unmanufactured construction material
Clearwater National Forest Page 20 of 66
(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-21, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
with paragraphs (c) and (d) of the clause at FAR 52.225-21 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-21 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
52.225-23 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American
Act--Construction Materials under Trade Agreements. (AUG 2009) the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Domestic construction material" means-- (1) An unmanufactured construction material mined or produced in the United States; or
"Foreign construction material' means a construction material other than a domestic construction
"Free trade agreement (FTA) country construction material" means a construction material that--
Clearwater National Forest Page 21 of 66
(1) Is wholly the growth, product, or manufacture of an FTA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in an FTA country into a new and different construction material distinct from the materials from which it was transformed.
"Least developed country construction material" means a construction material that--
(1) Is wholly the growth, product, or manufacture of a least developed country; or from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
"Manufactured construction material" means any construction material that is not unmanufactured construction material.
"Recovery Act designated country" means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Aruba, Austria, Belgium, Bulgaria, Canada, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, or United Kingdom);
(2) A Free Trade Agreement country (FTA)(Australia, Bahrain, Canada, Chile, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Israel, Mexico, Morocco, Nicaragua, Oman, Peru, or Singapore); or
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, East Timor, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Maldives, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, Tanzania, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia).
"Recovery Act designated country construction material" means a construction material that is a WTO GPA country construction material, an FTA country construction material, or a least developed country construction material.
"Steel" means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
Clearwater National Forest Page 22 of 66
"WTO GPA country construction material" means a construction material that--
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was
(b) Construction materials. (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) and the Buy American Act (41 U.S.C.
10a-10d) do not apply to Recovery Act designated country construction material. Consistent with U.S. obligations under international agreements, this clause implements--
(i) Section 1605 of the Recovery Act by requiring, unless an exception applies, that all iron, steel, and other manufactured goods used as construction material in the project are produced in the United States; and
(ii) The Buy American Act by providing a preference for unmanufactured domestic construction material.
(2) The Contractor shall use only domestic or Recovery Act designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.
(3) The requirement in paragraph (b)(2) of this clause does not apply to the construction materials or components listed by the Government as follows:
NONE
(4) The Contracting Officer may add other construction material to the list in paragraph (b)(3) of this clause if the Government determines that--such material will increase the overall cost of the contract by more than 25 percent;
(B) The cost of unmanufactured construction material is unreasonable
United States in sufficient and reasonably available commercial quantities of a satisfactory quality; or
(iii) The application of the restriction of section 1605 of the Recovery Act or the
(c) Request for determination of inapplicability of section 1605 of the Recovery Act or the Buy American Act.
Clearwater National Forest Page 23 of 66
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--
(C) Quantity;
(D) Cost;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and of this clause.
(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract of the Recovery Act or the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to the section 1605 of the Recovery Act or the Buy American Act applies, use of foreign construction material other than that covered by trade agreements is noncompliant with the applicable Act.
measure Cost (dollars)*
Clearwater National Forest Page 24 of 66
Item 1:
Foreign construction material [ ] Domestic construction material [ ]
Item 2:
Foreign construction material [ ] Domestic construction material [ ]
(List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.)
(Include other applicable supporting information.)
(* Include all delivery costs to the construction site.)
(End of clause)
52.225-23 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American
Act--Construction Materials under Trade Agreements. (AUG 2009) -- Alternate I (MAR 2009)
"Bahrainian, Mexican, or Omani construction material" means a construction material that--
(1) Is wholly the growth, product, or manufacture of Bahrain, Mexico, or Oman; or from another country, has been substantially transformed in Bahrain, Mexico, or Oman the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Domestic construction material" means-- (1) An unmanufactured construction material mined or produced in the United States; or
"Foreign construction material" means a construction material other than a domestic construction
"Free trade agreement (FTA) country construction material" means a construction material that--
(1) Is wholly the growth, product, or manufacture of an FTA country; or from another country, has been substantially transformed in an FTA country into a new and different construction material distinct from the materials from which it was
"Least developed country construction material" means a construction material that--
Clearwater National Forest Page 25 of 66
(1) Is wholly the growth, product, or manufacture of a least developed country; or from another country, has been substantially transformed in a least developed country
"Manufactured construction material" means any construction material that is not unmanufactured
"Recovery Act designated country" means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Aruba, Austria, Belgium, Bulgaria, Canada, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan. or United Kingdom);
(2) A Free Trade Agreement country (FTA)(Australia, Bahrain, Canada, Chile, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Israel, Mexico, Morocco, Nicaragua, Oman, Peru, or Singapore); or
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, East Timor, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Maldives, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, Tanzania, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia).
"Recovery Act designated country construction material" means a construction material that is a WTO GPA country construction material, an FTA country construction material, or a least developed country construction material.
"Steel" means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
"WTO GPA country construction material" means a construction material that--
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was
Clearwater National Forest Page 26 of 66
(b) Construction materials. (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) and the Buy American Act do not apply to Recovery Act designated country construction material. Consistent with U.S. obligations under international agreements, this clause implements--
(i) Section 1605 of the Recovery Act, by requiring, unless an exception applies, that all iron, steel, and other manufactured goods used as construction material in the project are produced in the United States; and
(ii) The Buy American Act providing a preference for unmanufactured domestic
(2) The Contractor shall use only domestic or Recovery Act designated country construction material other than Bahrainian, Mexican, or Omani construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.
(3) The requirement in paragraph (b)(2) of this clause does not apply to the construction materials or components listed by the Government as follows:
[Contracting Officer to list applicable excepted materials or indicate "none".]
(4) The Contracting Officer may add other construction material to the list in paragraph (b)(3) of this clause if the Government determines that--such material will increase the overall cost of the contract by more than 25 percent;
(B) The cost of unmanufactured construction material is unreasonable
United States in sufficient and reasonably available commercial quantities of a satisfactory quality; or
(iii) The application of the restriction of section 1605 of the Recovery Act or the
(c) Request for determination of inapplicability of section 1605 of the Recovery Act or the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--
Clearwater National Forest Page 27 of 66
(C) Quantity;
(D) Cost;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and of this clause.
(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract of the Recovery Act or the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to the section 1605 of the Recovery Act or the Buy American Act applies, use of foreign construction material other than that covered by trade agreements is noncompliant with the applicable Act.
measure Cost (dollars)*
Item 1:
Domestic construction material [ ]
Item 2:
Domestic construction material [ ]
Clearwater National Forest Page 28 of 66
(List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.)
(Include other applicable supporting information.)
(* Include all delivery costs to the construction site.)
(End of clause)
52.225-24 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods--Buy
American Act--Construction Materials under Trade Agreements. (MAR 2009) material," "manufactured construction material," "Recovery Act designated country construction material," "steel," and "unmanufactured construction material," as used in this provision, are defined in the clause of this solicitation…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .