Attachment 1-Special Project Specification.pdf

PDF 721 KB Posted

Attached to
SPECIAL NOTICE Federal contract opportunity
Solicitation number
AG-82B1-S-10-0362
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

Attachment 1-Special Project Specification

View the file

Other files for this federal contract opportunity

Other files attached to SPECIAL NOTICE, newest first.
File Type Posted
Hubzone Notification.PDF PDF
Attachment 4-Experience Questionnaire.pdf PDF
AG-82B1-S-10-0362.pdf PDF
Attachment 2-Road and Bridge Plans Drawings.pdf PDF
Attachment 3-DOL General Decision Number ID080015.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Coeur d’Alene River Bridge at Jordan Creek

Rehabilitation Project

FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS

- - 1 - -

Supplemental Project Specifications To FHWA Standard Specifications for Construction of Roads and Bridges (FP-03 Edition)

Idaho Panhandle National Forests Coeur d’Alene River Ranger District

Table of Contents Preface

101 - Terms, Format, and Definitions

102 - Bid, Award, and Execution of Contract

103 - Scope of Work

104 - Control of Work

105 - Control of Material

106 - Acceptance of Work

107 - Legal Relations and Responsibility To the Public

108 - Prosecution and Progress

109 - Measurement and Payment

151 - Mobilization

153 - Contractor Quality Control

154 - Contractor Sampling & Testing

155 - Schedules for Construction Contracts

156 - Public Traffic

157 - Soil Erosion Control

201 - Clearing and Grubbing

203 - Removal of Structures and Obstructions

208 - Structure Excavation And Backfill For Selected Major Structures

- - 2 - -

253 - Gabions and Revetment Matresses

308 - Minor Crushed Aggregate

552 - Structural Concrete

554 - Reinforceing Steel

557 - Timber Structures

561 - Concrete Surface Treatment

622 - Rental Equipment

625 - Turf Establishment

703 - Aggregate

713 - Roadside Improvement Materials

717 - Structural Metal

725 - Miscellaneous

- 3 -

Preface_wo_03_15_2004_m

Preface

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of

National Forest System Roads.

- 4 -

101 - Terms, Format, and Definitions

101.01_nat_us_04_04_2007

101.01 Meaning of Terms.

Add the following:

Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI Symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

http://www.nist.gov/

- 5 -

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the

―purchaser‖.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Adjustment in Contract Price--―Equitable adjustment,‖ as used in the Federal

Acquisition Regulations, or ―construction cost adjustment,‖ as used in the Timber Sale

Contract, as applicable.

Change--―Change‖ means ―change order‖ as used in the Federal Acquisition

Regulations, or ―design change‖ as used in the Timber Sale Contract.

Design Quantity--―Design quantity‖ is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.

Under these FP specifications this term is replaced by the term ―Contract Quantities‖.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

- 6 -

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

- 7 -

R ig h t o f

W a y

R o a d si d e

R o a d si d e

C le a rin g W id th

R o a d w a y

C le a rin g L im it

X Y

G ro u n d

L in e

T ra ve le d W a y

C L B e rm

S u rf a ce

C o u rs e B a se

C o u rs e

F ill

S lo p e

B a ck

S lo p e

D ra in a g e D itc h

G ro u n d

L in e

S u b g ra d e

R o a d B e d

S h a p e s a n d d im e n si o n s w ill v a ry t o f it lo ca l c o n d iti o n s.

S e e d ra w in g s fo r ty p ic a l s e ct io n s.

X a n d Y d e n o te c le a rin g o u ts id e o f ro a d w a y.

N o te

Right - of - Way Line

Right - of - Way Line

Clearing Limit

Shoulder

Shoulder

Figure 101-1—Illustration of road structure terms.

- 8 -

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

- 9 -

103 - Scope of Work

103.01_ipnf_us_2_01_2010

103 Delete

Delete all but subsection 103.01 Intent of Contract and add the following.

103.01 Intent of Contract.

The intent of the contract is to rehabilitate an existing steel pony truss bridge over the Coeur D’Alene River near Jordan Creek on the Idaho Panhandle National

Forests.

This project includes removing unsound concrete, placing cast-in-place concrete, replacing treated timber bearing sills, replacing timber bridge rail and curb, replacing treated timber floor beam nailers, replacing existing nail laminated deck with a glued laminated deck, furnishing and installing treated timber running plank, gabion basket shoulder stabilization, hauling and placing aggregate surfacing, erosion and pollution control, partial stream diversion, contractor construction quality control and all other incidental items necessary to complete the project in accordance with the plans and specifications. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.

- 10 -

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.03_nat_05_11_2004

104.03 Specifications and Drawings.

Add the following:

(c) As-Built-Plans. Furnish one set of as built plans. The Government will provide one set of contract plans to be used exclusively for recording the as-built details of the project.

Use red pencil or red ink to record the information on the as-built plans.

Note all additions or revisions to the location, character, and dimensions of the prescribed work shown on the contract plans. Line out all details shown that are not applicable to the completed work. Check off details shown that were incorporated into the completed work without change.

Retain the plans at the project site and, as work progresses, continually update them to reflect the as-built details. Upon request, make the plans available to the CO to review for compliance with these specifications.

Show the following types of changes on the as-built plans:

(1) Typical section(s)

(a) Revisions in dimensions

(b) Revisions in materials

(2) Plan and profile

Revisions to the alignment

Changes in the construction limits

Revisions in location, type, and grade of road approaches

Location and type of utilities

Location, size, and type of underdrains

- 11 -

Skew of culverts

Channel changes

Location of monuments and permanent references

Elevations for all aerial and underground crossings of utilities

Location, length, and type of fencing

Revisions to grades, elevations, and stationing of intersection PIs

Equations

Culvert diameter, length, type, and stationing. On culvert extensions, indicate the length of the existing pipe and the length of the extension.

Location, length, stationing, and type of retaining walls

Location, length, stationing, and end treatment of guardrail

(3) Bridge

(a) Stationing of bridge ends

(b) Revisions to footing and seal elevations

(c) Pile length, size, type, and tip elevation

(d) Any changes in plan or dimensions including any major changes in reinforcing

(4) Miscellaneous

(a) Revisions to parking areas or turnouts

(b) Final location, type and length of curbs, sidewalks, etc.

Furnish the as-built working plans to the CO before the final inspection. Correct all details found during the final inspection that are not shown on the as-built plans and return to the CO within 5 days.

- 12 -

104.06_ipnf_us_2_01_2010

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads and trails under the jurisdiction of the Forest

Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Commensurate with use, the Contractor will be responsible for any damage to roads under the jurisdiction of the Forest Service used by the Contractor as haul routes for delivery of materials to the project site. Commensurate use road damage repairs will be the responsibility of the Contractor.

- 13 -

105 - Control of Material

105.02_ipnf_us_2_01_2010

105.02 Material Sources.

Add the following before the first paragraph.

Sources have been designated for this project as follows:

Crushed Aggregate Source – Commercial (Contractor Furnished) – There is no available Government source for Crushed Aggregate Surfacing specified for the

Jordan Creek Bridge Rehabilitation Project.

Waste Area – Government Furnished – A waste area for unsuitable and excess material associated with structural excavation will be designated by the CO within one(1) mile of the Jordan Creek Bridge.

Materials Stockpile Site – Government Furnished – The Contractor will be allowed to stockpile materials at approved locations within the project area.

Materials must be stockpiled in such a manner as to allow for safe passage of the general public if approved stockpile site is not within the project road closure area. Provide the Contracting Officer 72 hours advance notification prior to stockpiling any materials at the construction sites outside of the project road closure area.

Under (b) Contractor-located sources add the following:

Prior to any pit development or use of materials, the pit site shall be approved by the

Contracting Officer that the pit site is free of noxious weed as listed on the "All States

Noxious Weeds List”.

- 14 -

105.05_nat_us_05_12_2007

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The

Government is not obligated to make reimbursement for the cost of producing these materials.

- 15 -

106 - Acceptance of Work

106.01_nat_us_07_31_2007

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the

Contractor upon request. Government tests may or may not be performed at the work site.

If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price.

Four methods of determining conformity and accepting work are described in Subsections

- 16 -

106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no additional cost to the

Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the Contracting Officer. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed

Government test results or that produced the test results used as a basis for the dispute.

The Contracting Officer will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the

Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated,

- 17 -the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The Contracting Officer will determine disposition of the nonconforming work.

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

- 18 -

107 - Legal Relations and Responsibility To the Public

107.02_ipnf_us_2_01_2010

107.02 Protection and Restoration of Property and Landscape.

Do not work within the wetted perimeter of streams before July 15 th or after October 30 th unless approved by the Contracting Officer. Perform all in-stream work within the project area in accordance with the approved Erosion Control Plan. During in-stream work, the Contractor will not be allowed to cross the stream with equipment unless approved in writing by the Contracting Officer.

Landscape Preservation

(a) Do not remove, deface, injure, or destroy trees, shrubs, lawn, or natural features not designated for treatment. Confine operations to within the clearing limits or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Retrieve material which falls outside of these limits and dispose of, or incorporate in the work as directed by the Contracting Officer.

(b) Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products on site, take appropriate preventive measures to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual states. If a spill of petroleum product should occur in water, immediately notify the Contracting Officer.

Service all equipment only in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, prepare a Spill Prevention Control and Countermeasures (SPCC)

Plan. Meet all applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.

Preserve the scenic and natural environment along this construction project.

- 19 -

(c) Do not allow objectionable material to enter any stream, river, lake, or other body of water. Retrieve material which falls in these areas and dispose of, or incorporate in the work as directed by the Contracting Officer, and repair damage to vegetation or structures outside the project limits as directed by the Contracting Officer.

(d) Do not operate equipment or otherwise disturb the natural vegetation and soil beyond the areas flagged on the ground or beyond two feet from edge of walkways, top of cuts, or toe of fills.

(e) Prior to the start of construction, submit to the Contracting Officer for approval a schedule and plan for temporary pollution control measures for the following phases of work:

o Structural excavation for concrete repair of bridge bents and piers.

o Stream diversion around work area on pier number 2.

o Site excavation or ground disturbances that can promote surface erosion.

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

- 20 -

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the Contracting Officer of all hazardous material spills.

Provide a written narrative report form no later than 24 hours after the initial report and include the following:

Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

Exact time and location of spill including a description of the area involved.

Containment procedures.

Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the Contracting

Officer and in a manner that complies with Federal, state, and local laws and regulations.

- 21 -

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete

Delete Section 108 in its entirety.

- 22 -

109 - Measurement and Payment

109.02_ipnf_us_2_01_2010

109.02 Measurement Terms and Definitions

Add the following to this subsection:

One of the following methods of measurement for determining final payment is

DESIGNATED IN THE PAY SCHEDULE for each PAY ITEM:

Methods of Measurement:

(a) Designed Quantities (DQ). These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units DESIGNATED IN THE

SCHEDULE OF ITEMS may be authorized under any of the following conditions:

(1) Changes in the work authorized by the CO.

(2) A determination by the CO that errors exist in the original design that cause a PAY ITEM quantity to change by 15 percent or more.

(3) A written request submitted to the CO showing evidence of errors in the original design that cause the quantity of a PAY ITEM to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.

(b) Stake Quantities (SQ). These quantities are determined from staked measurements prior to construction.

(c) Actual Quantities (AQ). These quantities are determined from measurements of completed work.

- 23 -

(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.

(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Change the following:

―(b) Cubic yard‖ to ―(c) Cubic yard‖.

Add the following definition:

(p) Thousand Board Feet (MBF). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

109.00_nat_us_02_17_2005

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

- 24 -

151 - Mobilization

151.00_01_us_10_11_2006

Delete Section 151 in its entirety and replace with the following.

Description

151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site;

obtaining of permits, insurance, and bonds. This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands, according to the requirements within.

Construction Requirements

Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.

Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.

Notify the Contracting Officer in writing at least 72 hours before moving any construction equipment onto the National Forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service.

Inspection will be required after every cleaning.

Use methods of cleaning and locations for cleaning approved by the Contracting Officer.

- 25 -

For work at a commercial washing facility, use an approved facility.

New infestations of noxious weeds of concern to Forest Service and identified by either

Contractor or Forest Service, in the Project Area or on the haul route, will be promptly reported to the other party. Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found.

A current list of noxious weeds of concern to Forest Service is available at each Forest

Service office.

Measurement

151.02 Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment for cleaning will only be made if subsequent cleanings are ordered by the Contracting Officer. Measurement shall be on an ―each‖ basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the Contracting Officer will not be included in the measurement for payment.

Measure mobilization according to Subsection 109.02.

Payment

151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule. Payment will be full compensation for the work prescribed in this Section.

See Subsection 109.05.

Progress payments for mobilization lump sum will be paid as follows:

(a) If applicable, bond premiums will be reimbursed according to FAR Clause

52.232-5 Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.

(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.

- 26 -

(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.

(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.

Include all costs associated with the initial cleaning of equipment in the unit bid price for

Mobilization. Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the Contracting Officer.

- 27 -

153 - Contractor Quality Control

153.02_nat_us_02_17_2005

153.02 Contractor Quality Control Plan.

Add the following:

Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.

153.04_nat_us_10_24_2007

153.04 Records.

Delete all but the first sentence

- 28 -

Section 154. Contractor Sampling and Testing

154.01_ipnf_us_2_01_2010

154.01 Description

Delete this subsection and replace with the following:

This work consists of obtaining samples for testing, testing and reporting required test results. It does not include Contractor quality control testing required under

Section 153. However, include the work required under this Section in the Section

153 quality control plan.

154.03_ipnf_us_2_01_2010

154.03 Testing.

Perform all tests required by the Sampling and Testing Requirement tables at the end of the following sections:

SECTION 552 – Structural Concrete

For all cast-in-place concrete – Comply with the requirements of Section

552 and Table 552-9.

SECTION 308 – Minor Crushed Aggregate

For crushed aggregate – Comply with the requirements of Section 308 and

Table 308-1.

- 29 -

154.06_ipnf_us_2_01_2010

154.06 Measurement.

Do not measure Contractor Sampling and Testing for Payment.

154.07_ipnf_us_2_01_2010

154.07 Payment.

Do not measure Contractor Sampling and Testing for Payment

- 30 -

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete

Delete Section 155 in its entirety.

- 31 -

156 – Public Traffic

156.03_ipnf_us_2_01_2010

156.03 Accommodating Traffic During Work.

The Contractor will be allowed to close that segment of Road No. 412 affected by bridge and approach road construction activities to traffic during construction as outlined below.

No temporary detour or work bridge will be allowed during rehabilitation of the Jordan

Creek Bridge under this bridge repair contract.

Forest Development Road (FDR) No. 412 may be closed to public traffic within the project area during bridge construction work under this contract for one(1) closure period consisting of up to a seventy(70) consecutive day closure period.

It is the responsibility of the Contractor to schedule delivery of materials, equipment and all necessary supplies to the site, to ensure that the bridge can be substantially completed within the above specified closure period and reopened to public traffic.

The Contractor will give the Contraction Officer at least twenty one(21) days advanced written notice prior to any road closure. The Contractor will be responsible for providing, installing, maintaining, and removing construction warning signs and type 3 barricades required for the road closure period.

Traffic delays, as outlined below, may be approved should the project work necessitate short traffic delays outside the approved closure period. Traffic delay periods may be authorized upon receipt of a written approval from the Contracting Officer. Prior notification by the contractor is required for public notice of the contractor’s intent to delay traffic. The Contractor shall submit a written request outlining the traffic delays required at least 7 days prior to starting construction operation that necessitates the traffic delays. The contractor must open the bridge and road as rapidly as possible to allow passage of emergency vehicles.

Time Periods Maximum Delays

Monday – Friday (8:00 a.m. – 4:00 p.m.) ------------------------ 60 Minutes

Monday – Friday (4:00 p.m. – 8:00 a.m.) ------------------------ Open to Traffic

Weekends – (Sat. & Sun) and Holidays -------------------------- Open to Traffic

- 32 -

ROAD No. 412 CLOSED

22.3 MILES AHEAD

Traffic delay periods (60 minutes) between 8:00 a.m. and 4:00 p.m. begin when the first traffic vehicle arrives at the closure site. This traffic delay period is the maximum delay traffic should experience within the entire construction area.

The Contractor shall be responsible for the safe passage of vehicle traffic over the bridge and through the construction site when Road No. 412 is open to public traffic during construction and outside work hours.

Develop a construction sign plan that reflects the Contractor’s plan of operation and submit to the Contracting Officer for approval 14 days prior to commencement of on-site project work. Install construction signs prior to and consistent with the site work being performed.

In addition to typical MUTCD construction zone signing and road closure devices (type

III barricades), the contractor shall install public information signs at the following locations to notify the public of bridge construction and road closures ahead as follows:

o Junction of Primary Forest Route No. 9 (Coeur d’Alene River Road) with

Forest Development Road (FDR) No 412 o Junction of FDR No. 412 with FDR No. 151 o Junction of FDR No. 412 with FDR No. 947 o Junction of FDR No. 208 with FDR No. 3099 o Junction of FDR No. 412 with FDR No. 3099 o Junction of FDR No. 412 with FDR No. 412

Sample road closure sign follows:

- 33 -

156.04_ipnf_us_2_01_2010

156.04 Maintaining Roadways During Work.

(a) Add the following:

The construction of detour roads for this project is not allowed.

156.08_nat_us_02_24_2005

156.08 Traffic and Safety Supervisor.

Delete this subsection in its entirety.

156.10_ipnf_us_2_01_2010

156.10 Measurement and Payment

Delete the entire subsection and replace with the following:

No separate measurement and payment will be made under this Section. All Labor, equipment and materials associated with this item will be considered incidental to other pay items shown on the SCHEDULE OF ITEMS.

- 34 -

157 - Soil Erosion Control

157.02_ipnf_us_2_01_2010

157.02 Materials

Provide straw/hay bales, wattles, logs and rolls from a certified noxious weed free source.

157.03_ipnf_us_2_01_2010

157.03 General

Submit “Soil Erosion Control Plan” detailing permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. The erosion control plan will be submitted by the Contractor to the Contracting Officer at the pre-work meeting and approved by the Contracting Officer prior to the Contractor starting construction activities. Include methods to minimize disturbance to the stream and prevent runoff from the construction site entering directly into the stream. The “Soil

Erosion Control Plan” must address construction activities that have the potential for stream sedimentation.

Reflect in the “Soil Erosion Control Plan” special concerns and measures necessary to protect resources and government improvements. Include:

(a) The construction activities and sequence of implementation relating to specific erosion control measures.

(b) The location and type of permanent controls to be implemented during construction.

(c) The location and type of temporary controls to be implemented during construction.

- 35 -

(d) For work in stream channels with running water a detailed dewatering plan

(stream diversions) or measures to be implemented to control stream turbidity.

Reference Section C(h) – Restrictions – Date restrictions for in-stream work for the Jordan Creek Bridge repairs.

As part of the Soil Erosion Control Plan, Contractor to provide the following:

(a) Emergency Spill Kit. Keep sufficient quantities of absorbent materials on the project site to absorb accidental fuel, hydraulic oil, or other petroleum product spills. Use absorbent materials that are biodegradable, non-water absorbing and designed specifically for the types of spills associated with the Contractor’s operations.

(b) Straw/Hay Bales. Contractor to stockpile five(5) straw/hay bales on the

Jordan Creek project site for the discretionary use as directed by the Contracting

Officer in addition to any bales or silt fence that the Contractor intends to incorporate into the project as a part of the permanent and temporary erosion control measures as required under this specification. These straw/hay bales are intended for unforeseen emergency use. As the straw bales are used from the stockpile, Contractor will replace the used bales within 48 hours. Upon completion of the project, the straw/hay bales will remain in place or removed as directed by the Contracting Officer. Removed bales and remaining stockpiled bales shall be uniformly spread over seed disturbed areas upon substantial completion of the project.

Add the following to the third paragraph:

Upon completion of construction at the site, remove all temporary erosion control devices, dewatering materials and equipment from Government property.

157.08_ipnf_us_2_01_2010

157.08 Water Crossings.

Installation of a work bridge or detour bridge will not be allowed during the rehabilitation work under this contract for the Jordan Creek Bridge. Contractor will be required to stage equipment and materials on both sides of the bridge prior to closure of the existing

Jordan Creek Bridge to eliminate the need for stream crossings with equipment. Any

- 36 -stream crossing with equipment after closure of the bridge structure must be requested by the Contractor and approved in writing by the Contracting Officer.

157.09_ipnf_us_2_01_2010

157.09 Diversions.

Delete the first sentence and replace with the following:

Prior to the start of construction, submit a written stream diversion plan that outlines the methods and location to divert the stream around the work area. Earthen dams are not prohibited.

157.15_ipnf_us_2_01_2010

157.15 Measurement

Do not measure stockpiled emergency use straw/hay bales or emergency spill kit as described under subsection 157.03.

Measure erosion control and stream diversion measures required to perform the in-stream work associated with the concrete pier repairs under this section.

157.16_ipnf_us_2_01_2010

157.16 Payment

No separate payment will be made for emergency spill kit or stockpiled emergency use straw/hay bales specified for discretionary use as directed by the Contracting Officer.

These items will be considered incidental to other pay items in the bid schedule. See

Section 109.05.

- 37 -

201 - Clearing and Grubbing

201.01_ipnf_us_2_01_2010

201.01 Description.

This work consists of clearing and grubbing within clearing limits and other designated areas approved by the Contracting Officer. Clearing limits shall be limited to construction areas necessary for equipment access, roadway and stream work as well as areas necessary to process the clearing and grubbing slash. All clearing limits must be clearly delineated and approved by the Contracting Officer before any clearing and grubbing can take place.

201.06_ipnf_us_2_01_2010

201.06 Disposal.

Due to the minor clearing and grubbing required for this project, no merchantable timber is located within the clearing limits.

201.08_ipnf_us_2_01_2010

Delete this section and add the following:

201.08 Measurement

Clearing and Grubbing will not be measured separately under this contract.

201.09_ipnf_us_2_01_2010

201.09 Payment

No separate payment will be made for clearing and grubbing. These items will be considered incidental to other pay items in the bid schedule. See Section 109.05.

- 38 -

203 – Removal of Structures and Obstructions

203.01_ipnf_us_2_01_2010

203.01 Description.

Delete and replace with the following:

This work consists of disposal of clearing slash, removal and disposal of the Jordan

Creek Bridge pier & bent concrete designated for removal, removal and disposal of treated timber bridge components and hardware designated for removal, removal and disposal of steel running plank and other obstructions as SHOWN ON THE

DRAWINGS.

203.03_ipnf_us_2_01_2010

203.03 Salvaging Material.

Materials designated for removal under this contract are not designated to be salvaged.

203.05_ipnf_us_2_01_2010

203.04 Removing Material.

Take measures necessary to prevent concrete rubble, woody debris from entering the stream channel during removal of concrete and treated timber components from the bridge substructure or superstructure.

203.05_ipnf_us_2_01_2010

203.05 Disposing of Material.

Modify this subsection as follows:

(a) Remove from project.

- 39 -

All materials designated for removal including treated timber bridge components, hardware, steel running plank and concrete rubble, become property of the Contractor and are to be removed from National Forest System Lands and disposed of in accordance with all local, state, and federal requirements.

(b) Burn. Delete this section.

(c) Bury. Delete this section.

- 40 -

208 - Structure Excavation & Backfill for Selected Major Structures

208.01_ipnf_us_2_01_2010

208.01 Description

Structure excavation for the Jordan Creek Bridge Rehabilitation Project is associated with the excavation and backfill to repair concrete pier and bents, installation of gabion baskets and other minor structural excavation work to complete the project as SHOWN

ON THE DRAWINGS and specified by contract.

208.04_ipnf_us_2_01_2010

208.04 General.

Use all suitable material in the construction of the roadway embankment and for structural backfill. Field drain and dry excessively wet material that is otherwise suitable for embankment before placement. Place and shape unsuitable or excess material in the designated sites as described under Section 105 or as directed by the Contracting Officer.

208.11_ipnf_us_2_01_2010

208.11 Compacting.

Each layer shall be compacted with mechanical tampers until surface deformation is no longer visible. Adjust the moisture content of the backfill material to the moisture content suitable for compaction.

- 41 -

Contractor will establish the compactive effort required by the control strip method.

Construct a control strip at the beginning of work on each type of material to be compacted. Ensure that the material used in the construction of the control strip meets the specification requirements and proper moisture content for maximum compaction.

Use compaction equipment in the construction of the control strip designed for this purpose until visual displacement ceases. Replace any compaction equipment that fails to provide adequate compaction. Correct or remove unacceptable control strips and replace them at the Contractor’s expense.

Begin compacting the control strip immediately after the course has been placed to the specified thickness. Ensure that compaction is continuous and uniform over the entire surface. Continue compaction of the control strip with a minimum of three passes or until no discernible increase in density can be obtained by additional compactive effort as determined by the Contracting Officer. Once the compactive effort has been established by the control strip method, apply this compaction process until soil type or other conditions change.

208.12_ipnf_us_2_01_2010

208.12 Acceptance.

Delete reference to Table 208-1.

- 42 -

253 – GABIONS AND REVET MATTRESSES

253.03_ipnf_us_2_01_2010

253.03 General.

Delete the first sentence and add the following:

Surveying will not be required to establish alignment of the gabions.

- 43 -

308 – Minor Crushed Aggregate

308.01_ipnf_us_2_01_2010

308.01 Work

Delete this subsection and add the following:

This work consists of furnishing, placing and compaction of crushed surface aggregate for bridge approaches for the Jordan Creek Bridge as SHOWN ON THE DRAWINGS or designated by the Contracting Officer.

308.04_ipnf_us_2_01_2010

308.04 Placing Crushed Aggregate

Add the following:

Crushed aggregate surfacing will not be placed by the Contractor until the subgrade has been approved in writing by the Contracting Officer.

308.05_ipnf_us_2_01_2010

308.05 Compaction and Finishing Crushed Aggregate

(3) Method 3. Crushed surface aggregate for bridge approaches may be spread with equipment and labor on site. Adjust the moisture content of the material to a level suitable for compaction. Operate hauling equipment over the full width of each layer until visible deformation of the layer ceases. Make at least three complete passes.

- 44 -

552 - Structural Concrete

552.02_nat_us_06_20_2007

Material

552.02 Add the following:

Anchor bolts 717.01

Dowels 717.17

Epoxy resin adhesives 725.21

High strength non-shrink grout 701.02

Mortar 701.02

Portland cement 701.01

Sealants, fillers, seal, and sleeves 712.01

552.03_ipnf_us_2_01_2010

552.03 Composition (Concrete Mix Design)

(l) Dosage of admixtures.

(3) Hydration stabilizing admixtures. Add the following:

When a hydration stabilizer admixture is specified or proposed in the concrete mix design, contractor shall submit for approval, proposed hauling and placement methods that may deviate from these standard specifications.

- 45 -

552.08_ipnf_us_02_01_2010

552.08 Delivery.

(a) Truck mixer/agitator.

Add the following:

Do not allow the sum of all drum revolutions at both mixing and agitating speed to exceed 300 before all concrete has been discharged from the drum; but ensure that the sum of all drum revolutions does not exceed 200 if the outside air temperature is

F or higher. If mixing is done before arrival of the truck at the point of delivery, rotate the drum at mixing speed for 10 to 15 revolutions to reblend possible stagnant spots.

552.09_ipnf_us_02_01_2010

552.09 Quality Control of Mix.

Add the following after the first paragraph:

At least 2 weeks prior to the start of concrete placement operations, arrange a pre-concrete placement conference. Coordinate attendance with the Contracting Officer and any applicable subcontractors. Be prepared to discuss and/or submit the following:

(1) Proposed concrete placement schedule.

(2) Review approved concrete mix design and determination of batch weights.

(3) Discuss Section 153, Contractor Quality Control, minimum frequency schedule for process control sampling and testing (to be performed by the

Contractor).

(4) Discuss batching, mixing, placing, and curing requirements.

(5) Discuss Subsections 106.03, Certification, and 106.05, Statistical

Evaluation of Material for Acceptance.

- 46 -

552.11_ipnf_us_2_01_2010

552.11 Handling and Placing Concrete.

(a) General. Add the following:

The only acceptable method of placing concrete for concrete pier repairs under this project will be by pumping.

552.20_ipnf_us_2_01_2010

552.20 Delete the second sentence of this subsection and substitute the following:

Measure structural concrete by lump sum.

- 47 -

Section 554 – REINFORCING STEEL

554.11_ipnf_us_02_01_2010

554.11

Delete the second paragraph and replace with the following:

Do not measure reinforcing steel separately for concrete bridge abutments or mid span piers.

554.12_ipnf_us_02_01_2010

554.12

Delete this paragraph and replace with the following:

Payment will be made in accordance with 109.05 (b) Indirect Payment. Include all costs associate with this work in Section 552 items.

- 48 -

557 - Timber Structures

557.02_01_us_08_20_2004

557.02 Material.

Furnish, the following compliance certificates to the CO upon delivery of the materials to the jobsite:

(a) Verification of compliance with grading rules and species of timber and lumber. Provide certification by an agency accepted as competent by the

American Lumber Standards Committee (ALSC).

(b) Lot certification of each charge for preservative, penetration in millimeters, and retention in kilograms per cubic meter (assay method) by a qualified independent inspection and testing agency. In addition, have the producer of the treated products provide written certification that Best Management Practices

(BMP's) in accordance with "Best Management Practices for Treated Wood in

Western Aquatic Environments," published by the Western Wood Preservation

Institute (WWPI) and Canadian Institute of Treated wood, were followed, including a description and appropriate documentation of the applicable BMP's used.

(c) Certification from a qualified inspection and testing agency indicating that all glued laminated members are in accordance with the requirements of American

National Standard for Wood Products, "Structural Glued Laminated Timber"

(ANSI/AITC A190.1) modified as SHOWN ON THE DRAWINGS.

(d) Such other certifications as SHOWN ON THE DRAWINGS or called for in the SPECIAL PROJECT SPECIFICATIONS.

Provide shop drawings for all timber 21 days in advance of fabrication. Show all dimensions and fabrication details for all cut, framed, or bored timbers, and material specifications and treatments.

- 49 -

561 – Concrete Surface Treatment

561.00_ipnf_us_02_01_2010

561.01 Work.

This work consists of applying pigmented, water-repellent acrylic penetrating sealer to all exposed concrete surfaces of the rehabilitated piers and intermediate concrete pier walls.

Materials

561.02 Materials.

Conform to the following Subsections:

Color Coating 725.24

CANYON TONE STAIN manufactured by United Coatings meets this specification.

Other products may also meet these requirements and may be considered providing the

Contractor requests its use in writing to the Contracting Officer. Provide sufficient documentation to determine if the proposed product meets this specification and has been successfully applied to five other similar projects that the Contracting Officer can investigate.

Grey color to be approved by the Contracting Officer.

Construction

561.03 Surface Preparation.

New Concrete - Complete the Class 2 – Rubbed Finish on all new concrete. Do not apply the surface treatment until all concrete placement and concrete finish work for the

- 50 -structure is complete. Remove all dust, efflorescence, scale, foreign matter, form oil, grease, and curing compound using methods and materials as recommended by the

Manufacturer of the water-repellent stain.

Existing Concrete – Dense concrete substrates should be brush-blasted or sand-blasted to clean and/or open the surface to achieve adequate penetration as recommended by the

Manufacturer of the pigmented water-repellent stain.

561.04 Weather Limitations.

Apply the surface treatment to a dry concrete surface when the surface temperature is 45 degrees Fahrenheit. or higher and the air temperature in the shade is anticipated to be 45 degrees Fahrenheit or higher during the 24 hours following application or as recommended by the Manufacturer of the water-repellent stain.

561.05 Application.

Apply the stain in two separate applications according to the manufacturer’s recommendations. Provide copies of the printed manufacturer’s application instructions and precautions to the Contracting Officer two weeks prior to scheduled application.

Apply finish to provide a…