SecJExhibit1.xlsx
XLSX spreadsheet 33 KB Posted
- Solicitation number
- AG-82B1-S-10-0317
About this file
Exhibit 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1449 AG-82B1-S-10-0317.pdf | ||
| SF 30 AMEND 2.PDF | ||
| Questions Answers Site Visit.pdf | ||
| Instructions.doc | DOC document | |
| AG-82B1-S-10-0317.rtf | RTF text file | |
| HazardTreeRemovalSitesVicinity.pdf | ||
| LoggingDeck.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Project Area | Tree Species | Tree Diameter Class -Diameter Breast Height Tree numbers determined from forest Service marking except at Project Areas labeled "estimated" | TOTAL PER SPECIES | TOTAL TREES PER PROJECT AREA | Weighted Average Diameter per species in Project Area | Woody Material Level of Treatment All trees in Project Area | Distance to Decking Location (miles) | 2010 Operating Period | Priority of Completion | ||||||||
| 7"- 9" | 9"- 11" | 11"- 13" | 13"- 15" | 15" - 17" | 17" - 19" | 19" - 21" | > 21" | First Operating Season | Second Operating Season | ||||||||
| 8 | 10 | 12 | 14 | 16 | 18 | 20 | 22 | ||||||||||
| WEST LAKE CG | Ponderosa Pine | 4 | 3 | 4 | 2 | 1 | 14 | 14 | 14 | C | off forest | May 1 to May 24 | Not Applicable | 2 |
| DOWDY LAKE CG | Ponderosa Pine | 13 | 32 | 25 | 17 | 6 | 7 | 1 | 3 | 104 | 105 | 12 | C | off forest | May 1 to May 24 | Not Applicable | 2 |
| Douglas fir | 1 | 1 | 10 |
| BELLAIRE LAKE CG | Ponderosa Pine | 30 | 19 | 10 | 11 | 9 | 2 | 3 | 4 | 88 | 900 | 12 | A | off forest | May 1 to June 24 | Sept 7 to Nov 1 | 1* |
| Lodgepole Pine | 332 | 293 | 112 | 32 | 13 | 6 | 5 | 3 | 796 | 10 | |||||||
| Douglas fir | 2 | 2 | 10 | ||||||||||||||
| Limber Pine | 4 | 4 | 3 | 1 | 1 | 1 | 14 | 12 |
JACK'S GULCH CG Ponderosa Pine 18 20 11 9 2 1 1 62 62 11 C off forest May 1 to May 24 Not Applicable 2
| MOUNTAIN PARK CG | Ponderosa Pine | 10 | 11 | 12 | 4 | 4 | 3 | 7 | 1 | 52 | 55 | 13 | C | off forest | May 1 to May 24 | Not Applicable | 2 |
| Douglas fir | 1 | 2 | 3 | 11 |
RED FEATHER WC Ponderosa Pine 1 3 7 5 2 3 1 22 22 14 C off forest May 1 to June 24 Not Applicable 2
MANHATTAN DISPERSED SITES 1-5 Ponderosa Pine 2 1 3 3 13 A within Project Area May 1 to June 24 Not Applicable 1
| MANHATTAN DISPERSED SITES 6-12 | Lodgepole Pine | 73 | 68 | 28 | 2 | 1 | 172 | 189 | 10 | A | within Project Area | May 1 to June 24 | Not Applicable | 1 | |||
| Ponderosa Pine | 2 | 4 | 3 | 1 | 4 | 1 | 1 | 1 | 17 | 14 |
| MANHATTAN DISPERSED SITES 13-16 | Lodgepole Pine | 30 | 24 | 28 | 6 | 5 | 1 | 1 | 2 | 97 | 107 | 11 | A | within Project Area | May 1 to June 24 | Not Applicable | 1 |
| Ponderosa Pine | 2 | 2 | 14 | ||||||||||||||
| Limber Pine | 3 | 4 | 1 | 8 | 10 |
| MANHATTAN DISPERSED SITES 17-29 | Lodgepole Pine | 63 | 86 | 38 | 12 | 1 | 1 | 1 | 202 | 263 | 10 | A | within Project Area | May 1 to June 24 | Not Applicable | 1 | |
| Ponderosa Pine | 2 | 12 | 11 | 10 | 4 | 3 | 1 | 1 | 44 | 13 | |||||||
| Limber Pine | 5 | 6 | 2 | 1 | 1 | 1 | 16 | 11 | |||||||||
| Douglas fir | 1 | 1 | 12 |
MANHATTAN DISPERSED SITE 30 Lodgepole Pine 1 1 1 3 3 10 A within Project Area May 1 to June 24 Not Applicable 1
ASPEN GLEN CG Lodgepole Pine 5 2 12 10 7 3 1 40 40 13 B 5.5 May 1 to May 24 Sept 7 to Nov 1 3
| BIG SOUTH CG | Lodgepole Pine | 4 | 2 | 2 | 8 | 9 | 15 | B | 7 | May 1 to May 27 | Sept 7 to Nov 1 | 4 | |
| Douglas fir | 1 | 1 | 8 |
KELLY FLATS CG Ponderosa Pine 1 1 3 1 3 2 1 12 12 16 A within Project Area May 1 to May 20 Sept 7 to Nov 1 3
DUTCH GEORGE CG Ponderosa Pine 1 1 2 4 4 19 A within Project Area May 1 to May 20 Sept 7 to Nov 1 3
| CHAMBERS LAKE CG | Lodgepole Pine | 183 | 203 | 248 | 133 | 36 | 7 | 1 | 811 | 832 | 11 | B | 3.5 | May 1 to June 24 | Sept 7 to Nov 1 | 4 |
| Subalpine fir | 3 | 4 | 1 | 8 | 10 | |||||||||||
| Engelmann Spruce | 2 | 4 | 5 | 1 | 1 | 13 | 11 |
| EMMALINE LAKE TH | Lodgepole Pine | 9 | 2 | 1 | 12 | 13 | 9 | A | within Project Area | May 1 to May 27 | Sept 7 to Nov 1 | 3 | |
| Limber Pine | 1 | 1 | 14 |
| TOM BENNETT CG | Lodgepole Pine | 10 | 24 | 27 | 16 | 8 | 4 | 89 | 115 | 12 | A | within Project Area | May 1 to May 27 | Sept 7 to Nov 1 | 3 | |
| Engelmann Spruce | 1 | 7 | 4 | 3 | 1 | 16 | 12 | |||||||||
| Subalpine fir | 1 | 2 | 4 | 1 | 1 | 1 | 10 | 13 |
| FISH CREEK DUA | Lodgepole Pine | 3 | 2 | 5 | 10 | 9 | A | within Project Area | May 1 to May 27 | Sept 7 to Nov 1 | 3 | ||
| Engelmann Spruce | 1 | 2 | 1 | 1 | 5 | 13 |
NARROWS (UPPER) CG Ponderosa Pine 1 1 2 2 17 A within Project Area May 1 to May 20 Sept 7 to Nov 1 3
NARROWS (LOWER) CG Ponderosa Pine 1 1 1 3 3 13 A within Project Area May 1 to May 20 Sept 7 to Nov 1 3
ANSEL WATROUS CG Ponderosa Pine 2 1 1 2 1 7 7 18 A within Project Area May 1 to May 20 Sept 7 to Nov 1 3
ASPEN GLEN INFORMATION KIOSK PA Lodgepole Pine 2 13 15 5 5 40 40 12 B 5 May 1 to May 27 Sept 7 to Nov 1 4
| BEAVER CREEK TH | Lodgepole Pine | 4 | 1 | 2 | 2 | 1 | 10 | 18 | 14 | A | within Project Area | May 1 to May 27 | Sept 7 to Nov 1 | 3 | |
| Limber Pine | 3 | 3 | 1 | 1 | 8 | 10 |
| TRAP LAKE TH | Engelmann Spruce | 1 | 1 | 1 | 3 | 4 | 16 | B | 2 | May 1 to June 30 | Sept 7 to Nov 1 | 4 | |
| Subalpine fir | 1 | 1 | 12 |
| TRAP LAKE PA | Lodgepole Pine | 45 | 61 | 40 | 33 | 10 | 5 | 1 | 195 | 201 | 11 | B | 2.5 | May 1 to June 30 | Sept 7 to Nov 1 | 4 |
| Engelmann Spruce | 2 | 1 | 2 | 1 | 6 | 11 |
| TUNNEL CG | Lodgepole Pine | 69 | 77 | 60 | 33 | 19 | 13 | 6 | 5 | 282 | 284 | 12 | B | 10 | May 1 to June 30 | Sept 7 to Nov 1 | 4 |
| Engelmann Spruce | 1 | 1 | 2 | 9 |
| NORTH FORK CG | Lodgepole Pine | 4 | 4 | 4 | 4 | 0 | 16 | 21 | 11 | A | within Project Area | May 1 to June 24 | Not Applicable | 1 | ||
| Engelmann Spruce | 1 | 2 | 1 | 1 | 5 | 15 |
LONG DRAW DISPERSED SITES 1-39 (ESTIMATED) Lodgepole Pine 8 28 28 28 8 100 100 12 A within Project Area May 1 to June 30 Sept 7 to Nov 1 4
LONG DRAW FISHING PA #1 (ESTIMATED) Lodgepole Pine 4 14 14 14 4 50 50 12 B 9 May 1 to June 30 Sept 7 to Nov 1 4
LONG DRAW FISHING PA #2 (ESTIMATED) Lodgepole Pine 4 14 14 14 4 50 50 12 B 10 May 1 to June 30 Sept 7 to Nov 1 4
LONG DRAW FISHING PA #3 (ESTIMATED) Lodgepole Pine 4 14 14 14 4 50 50 12 B 10 May 1 to June 30 Sept 7 to Nov 1 4
GRAND VIEW CG (ESTIMATED) Lodgepole Pine 1 6 6 6 1 20 20 12 B 11.5 May 1 to June 30 Sept 7 to Nov 1 4
LONG DRAW CG (ESTIMATED) Lodgepole Pine 1 6 6 6 1 20 20 12 B 8 May 1 to June 30 Sept 7 to Nov 1 4
CORRAL PARK TH (ESTIMATED) Lodgepole Pine 3 8 8 8 3 30 30 12 B 7.5 May 1 to June 30 Sept 7 to Nov 1 4
RAWAH TH Lodgepole Pine 14 14 7 35 35 10 B 14 May 1 to June 30 Sept 7 to Nov 1 4
| OPTIONAL TREES 1-300 (ESTIMATED) | Lodgepole Pine | 71 | 75 | 55 | 28 | 10 | 5 | 3 | 3 | 250 | 300 | 11 | See Note Below | See Note Below | See Note Below | See Note Below |
| Ponderosa Pine | 14 | 15 | 11 | 6 | 2 | 1 | 1 | 0 | 50 | 11 |
| TOTAL | 1059 | 1206 | 895 | 489 | 184 | 78 | 45 | 37 | 3993 |
| 27% | 30% | 22% | 12% | 5% | 2% | 1% | 1% |
| CG: Campground; WC: Work Center; TH: Trail Head; CTR: Center; PA: Parking area; DUA: Day Use Area | Total number and percent of trees by species | Total number of trees by woody material level of treatment | Estimated Optional Trees | |||
| Optional Trees: May be selected and included at the discretion of the COR. Optional Trees | Ponderosa Pine | 486 | 12% | A | 1770 | 144 |
| may be included within any of the listed Project Areas. The diameter distribution for optional | Lodgepole Pine | 3383 | 85% | B | 1665 | 135 |
| trees is an estimate based on the designated trees at all sites. The Woody Material level of treatment for | Engelmann Spruce | 50 | 1% | C | 258 | 21 |
| optional trees will be the same as the Project Area. As an example if optional trees are added at Rawah TH | Subalpine fir | 19 | 0% | |||
| the Woody Material Level of treatment will be A. If optional trees are added at Jacks Gulch the Woody Material | Douglas fir | 8 | < 1% | Priority of Completion: | ||
| Level of Treatment will be C. Optional Tree Priority of treatment will be the same as the priority assigned for | Limber Pine | 47 | 1% | * Bellaire Lake CG: 326 trees marked with white paint and orange tags must be treated by June 24, 2010. The remaininng 576 trees can be treated during the second operating season. | ||
| the Project Area where the optional trees are included. |
&"Times New Roman,Bold"&14Section J, Exhibit 1 Summary of Work
Sheet2