About this file

Exhibit 1

View the file

Other files

File Type Posted
SF 1449 AG-82B1-S-10-0317.pdf PDF
SF 30 AMEND 2.PDF PDF
Questions Answers Site Visit.pdf PDF
Instructions.doc DOC document
AG-82B1-S-10-0317.rtf RTF text file
HazardTreeRemovalSitesVicinity.pdf PDF
LoggingDeck.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Project AreaTree SpeciesTree Diameter Class -Diameter Breast Height Tree numbers determined from forest Service marking except at Project Areas labeled "estimated"TOTAL PER SPECIESTOTAL TREES PER PROJECT AREAWeighted Average Diameter per species in Project AreaWoody Material Level of Treatment All trees in Project AreaDistance to Decking Location (miles)2010 Operating PeriodPriority of Completion
7"- 9"9"- 11"11"- 13"13"- 15"15" - 17"17" - 19"19" - 21"> 21"First Operating SeasonSecond Operating Season
810121416182022
WEST LAKE CGPonderosa Pine43421141414Coff forestMay 1 to May 24Not Applicable2
DOWDY LAKE CGPonderosa Pine13322517671310410512Coff forestMay 1 to May 24Not Applicable2
Douglas fir1110
BELLAIRE LAKE CGPonderosa Pine3019101192348890012Aoff forestMay 1 to June 24Sept 7 to Nov 11*
Lodgepole Pine332293112321365379610
Douglas fir2210
Limber Pine4431111412

JACK'S GULCH CG Ponderosa Pine 18 20 11 9 2 1 1 62 62 11 C off forest May 1 to May 24 Not Applicable 2

MOUNTAIN PARK CGPonderosa Pine10111244371525513Coff forestMay 1 to May 24Not Applicable2
Douglas fir12311

RED FEATHER WC Ponderosa Pine 1 3 7 5 2 3 1 22 22 14 C off forest May 1 to June 24 Not Applicable 2

MANHATTAN DISPERSED SITES 1-5 Ponderosa Pine 2 1 3 3 13 A within Project Area May 1 to June 24 Not Applicable 1

MANHATTAN DISPERSED SITES 6-12Lodgepole Pine7368282117218910Awithin Project AreaMay 1 to June 24Not Applicable1
Ponderosa Pine243141111714
MANHATTAN DISPERSED SITES 13-16Lodgepole Pine302428651129710711Awithin Project AreaMay 1 to June 24Not Applicable1
Ponderosa Pine2214
Limber Pine341810
MANHATTAN DISPERSED SITES 17-29Lodgepole Pine6386381211120226310Awithin Project AreaMay 1 to June 24Not Applicable1
Ponderosa Pine212111043114413
Limber Pine5621111611
Douglas fir1112

MANHATTAN DISPERSED SITE 30 Lodgepole Pine 1 1 1 3 3 10 A within Project Area May 1 to June 24 Not Applicable 1

ASPEN GLEN CG Lodgepole Pine 5 2 12 10 7 3 1 40 40 13 B 5.5 May 1 to May 24 Sept 7 to Nov 1 3

BIG SOUTH CGLodgepole Pine4228915B7May 1 to May 27Sept 7 to Nov 14
Douglas fir118

KELLY FLATS CG Ponderosa Pine 1 1 3 1 3 2 1 12 12 16 A within Project Area May 1 to May 20 Sept 7 to Nov 1 3

DUTCH GEORGE CG Ponderosa Pine 1 1 2 4 4 19 A within Project Area May 1 to May 20 Sept 7 to Nov 1 3

CHAMBERS LAKE CGLodgepole Pine183203248133367181183211B3.5May 1 to June 24Sept 7 to Nov 14
Subalpine fir341810
Engelmann Spruce245111311
EMMALINE LAKE THLodgepole Pine92112139Awithin Project AreaMay 1 to May 27Sept 7 to Nov 13
Limber Pine1114
TOM BENNETT CGLodgepole Pine10242716848911512Awithin Project AreaMay 1 to May 27Sept 7 to Nov 13
Engelmann Spruce174311612
Subalpine fir1241111013
FISH CREEK DUALodgepole Pine325109Awithin Project AreaMay 1 to May 27Sept 7 to Nov 13
Engelmann Spruce1211513

NARROWS (UPPER) CG Ponderosa Pine 1 1 2 2 17 A within Project Area May 1 to May 20 Sept 7 to Nov 1 3

NARROWS (LOWER) CG Ponderosa Pine 1 1 1 3 3 13 A within Project Area May 1 to May 20 Sept 7 to Nov 1 3

ANSEL WATROUS CG Ponderosa Pine 2 1 1 2 1 7 7 18 A within Project Area May 1 to May 20 Sept 7 to Nov 1 3

ASPEN GLEN INFORMATION KIOSK PA Lodgepole Pine 2 13 15 5 5 40 40 12 B 5 May 1 to May 27 Sept 7 to Nov 1 4

BEAVER CREEK THLodgepole Pine41221101814Awithin Project AreaMay 1 to May 27Sept 7 to Nov 13
Limber Pine3311810
TRAP LAKE THEngelmann Spruce1113416B2May 1 to June 30Sept 7 to Nov 14
Subalpine fir1112
TRAP LAKE PALodgepole Pine45614033105119520111B2.5May 1 to June 30Sept 7 to Nov 14
Engelmann Spruce2121611
TUNNEL CGLodgepole Pine6977603319136528228412B10May 1 to June 30Sept 7 to Nov 14
Engelmann Spruce1129
NORTH FORK CGLodgepole Pine44440162111Awithin Project AreaMay 1 to June 24Not Applicable1
Engelmann Spruce1211515

LONG DRAW DISPERSED SITES 1-39 (ESTIMATED) Lodgepole Pine 8 28 28 28 8 100 100 12 A within Project Area May 1 to June 30 Sept 7 to Nov 1 4

LONG DRAW FISHING PA #1 (ESTIMATED) Lodgepole Pine 4 14 14 14 4 50 50 12 B 9 May 1 to June 30 Sept 7 to Nov 1 4

LONG DRAW FISHING PA #2 (ESTIMATED) Lodgepole Pine 4 14 14 14 4 50 50 12 B 10 May 1 to June 30 Sept 7 to Nov 1 4

LONG DRAW FISHING PA #3 (ESTIMATED) Lodgepole Pine 4 14 14 14 4 50 50 12 B 10 May 1 to June 30 Sept 7 to Nov 1 4

GRAND VIEW CG (ESTIMATED) Lodgepole Pine 1 6 6 6 1 20 20 12 B 11.5 May 1 to June 30 Sept 7 to Nov 1 4

LONG DRAW CG (ESTIMATED) Lodgepole Pine 1 6 6 6 1 20 20 12 B 8 May 1 to June 30 Sept 7 to Nov 1 4

CORRAL PARK TH (ESTIMATED) Lodgepole Pine 3 8 8 8 3 30 30 12 B 7.5 May 1 to June 30 Sept 7 to Nov 1 4

RAWAH TH Lodgepole Pine 14 14 7 35 35 10 B 14 May 1 to June 30 Sept 7 to Nov 1 4

OPTIONAL TREES 1-300 (ESTIMATED)Lodgepole Pine717555281053325030011See Note BelowSee Note BelowSee Note BelowSee Note Below
Ponderosa Pine141511621105011
TOTAL105912068954891847845373993
27%30%22%12%5%2%1%1%
CG: Campground; WC: Work Center; TH: Trail Head; CTR: Center; PA: Parking area; DUA: Day Use AreaTotal number and percent of trees by speciesTotal number of trees by woody material level of treatmentEstimated Optional Trees
Optional Trees: May be selected and included at the discretion of the COR. Optional TreesPonderosa Pine48612%A1770144
may be included within any of the listed Project Areas. The diameter distribution for optionalLodgepole Pine338385%B1665135
trees is an estimate based on the designated trees at all sites. The Woody Material level of treatment forEngelmann Spruce501%C25821
optional trees will be the same as the Project Area. As an example if optional trees are added at Rawah THSubalpine fir190%
the Woody Material Level of treatment will be A. If optional trees are added at Jacks Gulch the Woody MaterialDouglas fir8< 1%Priority of Completion:
Level of Treatment will be C. Optional Tree Priority of treatment will be the same as the priority assigned forLimber Pine471%* Bellaire Lake CG: 326 trees marked with white paint and orange tags must be treated by June 24, 2010. The remaininng 576 trees can be treated during the second operating season.
the Project Area where the optional trees are included.

&"Times New Roman,Bold"&14Section J, Exhibit 1 Summary of Work

Sheet2

Sheet3

File details come from the government source that posted it. Updated .