AG-82B1-S-10-0290_amend_3.pdf
PDF 31 KB Posted
- Solicitation number
- AG-82B1-S-10-0290
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1442.pdf | ||
| OSPREY CAMPGROUND DWGs.pdf | ||
| Osprey Specifications.pdf | ||
| AG-82B1-C-10-0317.pdf | ||
| S-10-0290_amend_6.pdf | ||
| S-10-0290_amend_5.pdf | ||
| S-10-0290_amend_4.pdf | ||
| SF 30 Front Page editible.pdf | ||
| Amend 0001.pdf | ||
| AG-82B1-S-10-0290.pdf | ||
| OSPREY CAMPGROUND DWGs.pdf | ||
| Osprey Specifications.pdf | ||
| Solicitation's SF 1442 - COVER PAGE.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Three (3) 5/19/10 381133
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service Intermountain EROC 740 Simms Street Golden, CO 80401
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-82B1-S-10-0290
9B. DATED (SEE ITEM 11)
4/7/10
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
The attached summary of the questions and answers resulting form the pre-bid conference held on May 18, 2010 at the Osprey Campground is provided for the information of prospective bidders.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Stephen M. Patton
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
AG-82B1-S-10-0290 Page 2 Amendment 3
Attendees Representing
Mike Shoup USFS Jim Grubb USFS Steve Oravetz USFS Mike Thom USFS Greg hetzlet USFS Kory Hedrick Versatile Industries Willy Peck Western Reclamation Jack Borley GWR Ext Harley Lippert Lippert Heavy Equipment Mr. Howard Erosion Control & Site Services Mike Sackett Sackett Excavating Scott Foster Sackett Excavating Bud Cooper BBS, Inc.
Questions and Answers
1. Will screening of native material be allowed for bedding?
Ans. See Specification Section 02221 Part 2.10.A.4
2. Will the Forest Service pay for construction staking?
Ans. Construction staking is incidental to other items. Payment will be made only for the pay items in the schedule of items.
3. Where is the water source for the compaction effort?
Ans. There is no government-provided water source. The contractor shall provide their own water source. The dry hydrant at Outlet is a potential source, however, the contractor must obtain fire department approval prior to use.
4. Will electronic copies of the project files be available after award?
Ans. Yes
5. The general area where excavation will occur is likely to have have boulders. How does the Forest Service intend to handle rock excavation should it be necessary?
Ans. Refer to Specification Section 02221 Part 3.02.A.7. Offerors should take note that the schedule of items contains no separate pay item for rock excavation.
AG-82B1-S-10-0290 Page 3 Amendment 3
General Information
The Bonner County Public Works Department is currently reviewing the project plans. Any additional requirements imposed as a result of their review will be handled as a change under the Changes clause after award.
All other contract terms and conditions remain unchanged.
File details come from the government source that posted it. Updated .