FINAL HotCreek_Bridge6.pdf

PDF 2 MB Posted

Attached to
Recovery** - Hot Creek and Sagehen Trail Bridges, Boise NF
Solicitation number
AG-82B1-S-10-0287
Issued by

About this file

J1 Drawings (5)

View the file

Other files

File Type Posted
SageHen_Bridge1.pdf PDF
FS ARRA SIGN DETAILS.pdf PDF
FINAL HotCreek_Bridge3.pdf PDF
FINAL HotCreek_Bridge5.pdf PDF
Wage Determination.docx DOCX document
SageHenBridge2.pdf PDF
AG-82B1-S-10-0287.pdf PDF
TrailBridgeSupplementals.docx DOCX document
fire precautions.docm DOCM document
AG-82B1-S-10-0287.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0+10 0+20 0+30 0+40 0+50 0+60

5.

5.

6.

7.

4.

.3

.0

.2

0.

4.

7.

0.

0+15 0+25 0+35 0+45 0+55 0+65

File details come from the government source that posted it. Updated .