S-10-0221_amend_1.pdf
PDF 509 KB Posted
- Solicitation number
- AG-82B1-S-10-0221
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S-10-0221_amend_4.pdf | ||
| S-10-0221_amend_3.pdf | ||
| S-10-0221_amend_2.pdf | ||
| S-10-0221_maps.pdf | ||
| AG-82B1-S-10-0221.pdf | ||
| EXPERIENCE AND CAPABILITY QUESTIONNAIRE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Continuation of Amendment One (1) Page 1
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
One (1) 5/27/10 374626
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service Intermountain EROC 740 Simms Street Golden, CO 80401
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-82B1-S-10-0221
9B. DATED (SEE ITEM 11)
5/25/10
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
See next page for solicitation changes
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Stephen M. Patton
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
5/27/10
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Continuation of Amendment One (1) Page 2
1. The Schedule of Items is changed to add Item #107, Virginia Hill to the BASE BID. Please use the attached Schedule of Items to submit your offer.
2. C-2, LOCATION AND DESCRIPTION, (1) Location of Projects, the following is added:
Item #107 – Virginia Hill 1 is one unit (70 acres) located approximately 20 miles (by road) south and west of the town of Eureka in T35N, R27W, west half of section 21. From the
Eureka Ranger Station drive North on Highway 93 .5 miles to Highway 37. Take a left on
Highway 37 and drive 7.8 miles and take a left on Forest Service Road 856, Pinkham Creek
Road. Take Pinkham Creek Road for 10.7 miles. Turn left on Forest Service Road 7147, Teepee Lake Road. Follow Teepee Lake Road approximately 2.5 miles, the unit is below the road on the right, flagged in Pink (see project map for location). In this unit excavator piling shall be done in an area of 70 acres. The machine work shall be done on dry or frozen ground. Dozer work will not be accepted for this contract.
3. C-4, CONTRACTOR RESPPONSIBILITIES, (4) PERFORMANCE STANDARD (Slash
Treatment) is changed to read as folows:
All slash piling shall be conducted in such a manner as to allow operations without damaging residual trees. All standing trees shall be retained in an undamaged condition. Existing slash shall be piled by the date specified for each item under the Period of Performance section.
All slash cut by the contractor shall not be left on the ground longer than one calendar year. Slash shall be pulled back 5 feet from culverts on the fillslope. No slash shall be left on roads or fill-slope after piling.
4. F-2, Required Completion Dates is changed as follows:
Item 101 Sullivan Fuels, the completion date is changed to September 30, 2011
The following is added:
Item No. Estimated Start Work Date Completion Date (Mandatory)
107, Virginia Hill August 15, 2010 September 30, 2013
5. Section J, the vicinity map and unit map for Item 107 Virginia Hill is added.
RECOVERY Rexford-Fortine Slashing and Excavator Piling AG-82B1-S-10-0221
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES
SCHEDULE OF ITEMS
RECOVERY Rexford-Fortine Slashing and Excavator Piling
Kootenai National Forest
Rexford Ranger District
Lincoln County, Montana
SCHEDULE OF ITEMS
BASE BID
Item Unit Total
Number Description Unit Quantity Price Price_____
ITEM NO. 101: Sullivan Fuels Excavator Piling
101 Sullivan Fuels Excavator Pile Acres 50 $_________ $____________
ITEM NO. 101 Total Price $____________
ITEM NO. 102: North Bridge 43W Excavator Piling (**Timing Restriction**)
102 North Bridge 43W Excavator Pile Acres 33 $_________ $____________
ITEM NO. 102 Total Price $____________
ITEM NO. 103: Black Butte Fuels Excavator Piling
103 Black Butte Fuels Excavator Pile Acres 54 $_________ $____________
ITEM NO. 103 Total Price $____________
ITEM NO. 104: Pinkham Fuels Slashing and Excavator Piling
Subitem:
104a Pinkham Fuels Slash Acres 36 $_________ $____________
104b Pinkham Fuels Excavator Pile Acres 36 $_________ $____________
ITEM NO. 104 Total Price $____________
ITEM NO. 107: Virginia Hill 1 Excavator Piling
107 Virginia Hill 1 Excavator Pile Acres 70 $_________ $____________
ITEM NO. 107 Total Price $____________
ITEM NO. 301: Big Bull Cable Excavator Piling
301 Big Bull Cable Excavator Pile Acres 66 $_________ $____________
ITEM NO. 301 Total Price $____________
ITEM NO. 302: Beaver Slope Slashing and Piling
302a Beaver Slope Slash Acres 16 $_________ $____________
302b Beaver Slope Excavator Pile Acres 16 $_________ $____________
ITEM NO. 302 Total Price $____________
ITEM NO. 303: Elk Mountain #20 Excavator Piling
303 Elk Mountain #20 Excavator Pile Acres 58 $_________ $____________
ITEM NO. 303 Total Price $____________
ITEM NO. 304: Dry Lake Slashing and Piling
304a Dry Lake Slash Acres 31 $_________ $____________
304b Dry Lake Excavator Pile Acres 31 $_________ $____________
ITEM NO. 304 Total Price $____________
ITEM NO. 305: Trego 54 Excavator Piling
305 Trego 54 Excavator Pile Acres 47 $_________ $____________
ITEM NO. 305 Total Price $____________
OPTIONAL ITEMS
All or some combination of the following optional items may be awarded depending on prices received and funding available at the time of award:
ITEM NO. 105: Honey Hole Slashing and Piling:
105a Honey Hole Slash Acres 38 $_________ $____________
105b Honey Hole Excavator Pile Acres 38 $_________ $____________
ITEM NO. 105 Total Price $____________
ITEM NO. 106: Rexford Bench Excavator Piling:
106 Rexford Bench Excavator Pile Acres 30 $_________ $____________
ITEM NO. 106 Total Price $____________
ITEM NO. 306: Whiskibas #5 Excavator Piling:
306 Whiskibas #5 Excavator Pile Acres 25 $_________ $____________
ITEM NO. 306 Total Price $____________
ITEM NO. 307: Whiskibas #6 Excavator Piling:
307 Whiskibas #6 Excavator Pile Acres 20 $_________ $____________
ITEM NO. 307 Total Price $____________
ITEM NO. 308: No Braynur Excavator Piling:
308 No Braynur Excavator Pile Acres 52 $_________ $____________
ITEM NO. 308 Total Price $____________
Contractor Name: Phone:
Signature: FAX:
Address: E-Mail:
TIN #:
City, State, Zip: DUNS#:
NOTES:
(1)The Government may make multiple awards under this solicitation. Proposals may be submitted for any combination of items. Offers will not be accepted for quantities less than those specified for each item and shall be submitted for all subitems within each item. Award of this contract is contingent upon funding being available at the time of award.
(2) Offerors desiring to be considered for more than one line item may limit their award exposure by completing the following:
This offer is tendered on the basis that the offeror will accept not less than _____ acres nor more than _____ acres
(including optional items) of slashing and excavator piling.
2010 Eureka Stimulus Slashing and Excavator Piling
Koocanusa Reservoir m
Legend Forest Service State Land Private Land
Item # 104Item # 105
Item # 103 Item # 102
Item # 101
Item # 106
To Eureka mTo Libby
Item #107
Virginia Hill Item#107 70 Acres
Legend Forest Service Private
Pinkham rd.
FS rd. 856
FS rd. 7147
To Eu rek a m
T 35N R 27W Sec. 21T 35N R27W Sec. 20