Statement of Work.pdf
PDF 2 MB Posted
- Solicitation number
- AG-82B1-S-10-0180
About this file
Statement of Work to include maps and drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| abstract toilets S-10-180.pdf | ||
| Ltr of Intent to Award.Toilet Demo.pdf | ||
| experience questionnaire.pdf | ||
| Exp. Qstnr.docm | DOCM document | |
| SF 1442.PDF | ||
| Wage Determination La Plata.txt | TXT text file | |
| Wage Determination Archeuleta.txt | TXT text file | |
| AG-82B1-S-10-0180.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
San Juan National Forest 2010 Toilet and Recreation Site Demolition
B- 1 - SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY
UNIT
PRICE
TOTAL
PRICE
02120(01)
Vault Toilet Removal and Disposal – Single Wood, Vault Demo In-Place Pine Point #11, Transfer Park 1A, Florida #1 & Florida # 2 Middle Mt. #1, Middle Mt. and Graham Creek
Each 7
02120(02)
Vault Toilet Removal and Disposal – Single Wood, Vault Removal Snowslide, Vallecito CG - Deer 1B, Deer #2, Chipmunk, Wapiti, 1A and 3B
Each
02120(03) Vault Toilet Removal and Disposal – Single Wood, Vault Demo In-Place Williams Creek CG(#1,#2,#5,#7,#8) Middle Fork, Buckles Lake TH, Eight Mile Lookout and First Fork #2
Each 9
02120(04) Vault Toilet Removal and Disposal – Double Wood, Vault Removal Piedra Picnic Ground, West Fork #2, Bridge CG #1,#2 & #3, Chris Park Loop#1
Each 6
02120(05) Vault Toilet Removal and Disposal – Double Wood, Vault Demo In-Place Cimarrona#1,Williams Creek#3, West Fork #1
Each 3
02120(06)
Vault Toilet Removal and Disposal – Double Masonry, Vault Demo In-Place Pine Point #19, Miller Creek & Chimney Rock
Each
02510(01) 1” Waterline LF
02510(02)
Cap water line (Miller Creek and Pine Point) Each 2
03301(01) Concrete Pad Lump Sum
San Juan National Forest Page C1 Section C 2010 Toilet Demolition Project
SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1 SCOPE OF WORK
Work for this project consists of demolition of 35 vault toilet at 19 recreation site locations in the Columbine and Pagosa Ranger Districts of the San Juan National Forest; backfill of all excavation, capping of two water lines, relocation of approximately 100ft of water line and construction of a concrete pad at one toilet demolition site.
The toilets will be pumped by the Forest prior to contractor mobilization and in accordance with the enclosed schedule. The contractor will need to coordinate with the CO on the demolition to allow for these arrangements. The contactor will adhere to the attached schedule, unless otherwise approved by the CO. Generally, work will begin June 14th 2010 and will be restricted to weekdays (Monday through Friday) so as to not impact visitor use. No work shall be permitted from July 1st to July 6th 2010. Demolition and installation work will suspend from July 31th through Sept 6th and may resume on Sept 7th.
The final work day is projected to be Sept 17th 2010.
The project scope is more particularly described as follows:
1. The vaults may be collapsed in-place where specified, but must be demolished to a point that no water may be retained.
Where a new toilet is to be installed on the same site, the vaults must be removed. The toilet buildings range in size from 36 to 192 square feet. Concrete pads are estimated to be 4 inches thick and generally extend 12 to 24 inches outside the building walls. Single vaults are estimated to be 36 inches diameter by 8 feet deep and the estimated volume of a single toilet is 2 cubic yards. Double toilets are generally two times the size and volume of single toilets. The void left by the vault must be backfilled and compacted using contractor supplied pit run material. It is incumbent upon the contractor to verify material quantities. Compaction shall be completed in lifts not to exceed 12 inches depth and by no less than three passes over the entire surface of each lift with a mechanical vibrating tamper. The top six (6) inches shall remain loose enough to allow plant growth.
2. All demolition materials shall be removed from forest property and properly disposed of at a waste disposal facility or as otherwise approved by the CO. All work completed shall be done in a manner that minimizes damage to the surrounding vegetation and adjacent improvements. Damage to other structures and utilities not designated for removal, shall be repaired by the contractor at no expense to the Government. The Contractor shall restore grade in the construction area to approximate natural contours. This shall also include disturbed area where new toilets have been installed.
3. At times, the contractor will have to coordinate with the toilet installation contractor and the CO regarding scheduling of work.
4. A 6 inch thick reinforced concrete pad shall be constructed at the Chimney Rock toilet demolition site. The pad shall match existing grade of the adjacent concrete paving. Reinforcement shall be constructed of #4 rebar tied at 16 inch spacing. Concrete shall be placed on a 2 inch minimum layer of ¾-inch washed gravel. Gravel is to be placed on top of 2 feet of fill material. Concrete pad is approximately 127 square feet set in an existing concrete pad, enclosed by low rock walls, which are to be left in place.
5. The water lines at Miller site and Pine Point (near toilet #19) are to be capped as approved by the CO.
6. A segment of the water line near Williams Creek toilet #8 will be relocated to accommodate the installation of a new vault toilet building. Approximately 100 feet of high density polyethylene water line and two fittings will be required as approved by the CO. The contractor will be required to verify line material, sizing and fitting requirements.
C.2 LOCATION OF WORK
This project is located in the Columbine and Pagosa Ranger Districts of the San Juan National Forest near the towns of Durango, Bayfield and Pagosa Springs, Colorado. Project locations are described further in the attached project schedule and project location maps.
2010 Toilet Demolition Project Schedule
Vault Requirements Building Name
Demo Start
Demo Finish Notes Location
Pagosa District Remove PIEDRA PICNIC GROUND TOILET 6/14/10 6/15/10 T37NR3WSec21 Remove BRIDGE CG TOILET #1 6/16/10 6/17/10 T37NR3WSec9 Remove BRIDGE CG TOILET #2 6/16/10 6/17/10 T37NR3WSec9 Remove BRIDGE CG TOILET #3 6/16/10 6/17/10 T37NR3WSec9 Collapse in place WILLIAMS CREEK CG TOILET #1 6/21/10 6/22/10 T38NR3WSec30 Collapse in place WILLIAMS CREEK CG TOILET #2 6/21/10 6/22/10 T38NR3WSec30 Collapse in place CIMARRONA CG TOILET #1 6/23/10 6/24/10 T38NR3WSec8 To be decided MIDDLE FORK TH TOILET 6/23/10 6/24/10 T38NR2WSec24 Collapse in place WEST FORK CG TOILET #1 6/28/10 6/29/10 T37NR1ESec7 Remove WEST FORK CG TOILET #2 6/28/10 6/29/10 T37NR1ESec7 Collapse in place WILLIAMS CREEK CG TOILET #3 9/07/10 9/08/10 T38NR3WSec30 Collapse in place WILLIAMS CREEK CG TOILET #5 9/07/10 9/08/10 T38NR3WSec30 Collapse in place WILLIAMS CREEK CG TOILET #7 9/07/10 9/08/10 T38NR3WSec30 Collapse in place WILLIAMS CREEK CG TOILET #8 9/07/10 9/08/10 Move water line as per CO T38NR3WSec30 To be decided BUCKLES LAKE TH TOILET 9/09/09 9/10/09 T33NR3WSec30
Collapse in place CHIMNEY ROCK 9/13/10 9/17/10 Cap excavation with concrete pad T34NR4WSec17
Collapse in place EIGHT MILE LOOKOUT 9/13/10 9/17/10 T34NR1WSec19 Collapse in place FIRST FORK #2 9/13/10 9/17/10 T36NR4WSec28
Columbine District Collapse in place FLORIDA CG #1 7/06/10 7/07/10 T37NR7WSec19 Collapse in place FLORIDA CG #2 7/06/10 7/07/10 T37NR7WSec19 Collapse in place MILLER 7/06/10 7/08/10 Cap water line as per CO T36NR7WSec8 Collapse in place TRANSFER PARK CG 1A 7/06/10 7/07/10 T37NR12WSec17 Remove VALLECITO CG DEER 1B 7/12/10 7/13/10 T37NR6WSec16 Remove VALLECITO CG DEER #2 7/12/10 7/13/10 T37NR6WSec16 Remove VALLECITO CG CHIPMUNK 7/12/10 7/13/10 T37NR6WSec16 Remove VALLECITO CG WAPITI 7/12/10 7/13/10 T37NR6WSec16 Remove VALLECITO CG 1A 7/12/10 7/13/10 T37NR6WSec16 Remove VALLECITO CG 3B 7/12/10 7/13/10 T38NR9WSec36 Collapse in place GRAHAM 7/19/10 7/23/10 T36NR6WSec16 Collapse in place MIDDLE MT. 7/19/10 7/23/10 T36NR6WSec9 Collapse in place MIDDLE MTN. CG #1 7/19/10 7/20/10 T36NR6WSec9 Collapse in place PINE POINT (near site 11) 7/19/10 7/20/10 T36NR6WSec9 Collapse in place PINE POINT (near site 19) 7/19/10 7/20/10 Cap water line as per CO T36NR6WSec9 Remove SNOWSLIDE TOILET 7/19/10 7/20/10 T36NR11WSec21 Collapse in place CHRIS PARK LOOP #1 9/20/10 9/21/10 T38NR9WSec36
I*
I*
I*
I*
I*
I*I*
First Fork Trailhead
Chimney Rock
T35N R3WT35N R4WT35N R5W
T34N R3W T34N R4W
T34N R5W
T34N R3WAT34N R4WA
T35N R22W
T35N R2W
T34N R5WA
T36N R3W T36N R4W
T34N R2W
T36N R2.5W T36N R2W
T36N R5W
T34N R2.5W
US-160
630.1
CTY-700
ST
-15
CTY-600741
681133
620.F
627.A
629.D
628.C
.C
626.B
629.B1 622030
841.B
630.J
3.A
630.E
620.R
620.E
620.K
CTY-146
620.S 681.A
920.A
.A
630.B
920.F
841.A
923030
620.P
918.B
629.F626.D 63 0.K
121.A
Dolores
Rico Silverton
Mancos Cortez
Durango Bayfield
Ignacio
Pagosa Springs
£¤160
£¤84 £¤151
£¤550
£¤145
£¤160 £¤184
£¤160
£¤550
£¤160
PAGOSA
COLUMBINEMANCOS-DOLORES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
SAN JUAN NATIONAL FOREST
Toilet Replacement & Demo
PROJECT LOCATION MAP
³
Area of Detail
0 4 8 12 162
Miles
I*
I*
I*
I*
I*
I*
I*
I*I*
I* I*I*
I*I* I*
I*I*
I*
I*
I*
I*
I*
I*
I*
I*
I*
Williams Creek Campground
Cimarrona Campground
Bridge Campground
Piedra Picnic Site
Middle Fork Trailhead
First Fork Trailhead T36N R2W T36N R1W
T35N R3WT35N R4W
T36N R3W
T37N R2W
T36N R4W
T37N R1W
T38N R3WT38N R4W
T36N R5W
T38N R1W
T35N R5W
T38N R2W
T35N R1WT35N R2W
T37N R5W
T37N R3WT37N R4W
T38N R5W
T37N R1E
T38N R1E
T36N R2.5W
T35N R22W
T37N R4.5W
T38N R4.5W
T34N R3WAT34N R4WA
T37N R2.5W
T34N R5WA
US
-16
CTY-400
CTY-600
630.1
CTY-200741
9.A
631.N
620.F
634.G
629.C
US
-84
634.D
855.B
622030
631.I
1.A
666.E
7.C
642.C
661.A
4.E
.A
620.S
645.J
631.H
646.A
Dolores
Rico Silverton
Mancos Cortez
Durango Bayfield
Ignacio
Pagosa Springs
£¤160
£¤84 £¤151
£¤550
£¤145
£¤160 £¤184
£¤160
£¤550
£¤160
PAGOSA
COLUMBINEMANCOS-DOLORES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
SAN JUAN NATIONAL FOREST
Toilet Replacement & Demo
PROJECT LOCATION MAP
³
Area of Detail
0 4 8 12 162
I*
I*I*
West Fork Campground
623 1
19 21
18 16 15
23 24
15 13
34 35 323136 33 34
2728293025262728
T37N R1ET37N R1W
T38N R1ET38N R1W
US
-16
033 72
039.A
Dolores
Rico Silverton
Mancos Cortez
Durango Bayfield
Ignacio
Pagosa Springs
£¤160
£¤84 £¤151
£¤550
£¤145
£¤160 £¤184
£¤160
£¤550
£¤160
PAGOSA
COLUMBINEMANCOS-DOLORES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
SAN JUAN NATIONAL FOREST
Toilet Replacement & Demo
PROJECT LOCATION MAP
³
Area of Detail
0 0.2 0.4 0.6 0.80.1
I*
I*
I*I*
I*
I*
I* I*
I*
I*
I*
I*
I* I*
I*
I*I*
Transfer Campground
Snowslide Campground T36N R9W
T35N R9W
T36N R11W T36N R10W
T35N R11W T35N R10W T35N R8W
T36N R8W
T35N R12W
T36N R12W
T34N R9WAT34N R11WA T34N R10WA
T37N R11W
T34N R8WA
T37N R10W T37N R9W
T34.5N R9W
T37N R8W
T34N R12WA
T37N R12W
T34N R9WT34N R11W T34N R10WT34N R12W T34N R8W
US-160
US
-55
CTY-124
CT
Y_
CTY-240
ST
-14
CTY-203
CT
Y-2
CTY-141
CT
Y-2
ST-3
CTY-207
CTY-204
CTY-208
344 171.P
316.A
071.A171.A
571.F
CTY-124A
567.F
CTY_DHILLS
171.D
571.D
1.S
Dolores
Rico Silverton
Mancos Cortez
Durango Bayfield
Ignacio
Pagosa Springs
£¤160
£¤84 £¤151
£¤550
£¤145
£¤160 £¤184
£¤160
£¤550
£¤160
PAGOSA
COLUMBINEMANCOS-DOLORES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
SAN JUAN NATIONAL FOREST
Toilet Replacement & Demo
PROJECT LOCATION MAP
³
Area of Detail
0 0.5 1 1.5 20.25
I*
I*
I*
I*
I*I* I*
I*
I*
I*
I*
I*
I* I*
I*
I*
I*
I* I*
I*
I*
I*
I*
I*
I*
I*
I* I*
I*I*
I*
I*
I*
I*
I*
I*
I*
I*I*
I*
I*
I*I*
Chris Park Loop #1
Florida Campground
Pine Point
Graham
Vallecito Campground
Miller Creek Middle Mountain Campground
Transfer Park CampgroundT37N R8W T37N R6W
T35N R8W
T37N R9W T37N R5W
T35N R7W T35N R6W
T36N R7W T36N R5WT36N R9W
T36N R6W
T36N R8W
T35N R9W T35N R5W
T37N R7W
T36N R10W
T35N R10W
T37N R10W
T38N R7WT38N R8WT38N R9W T38N R6W T38N R5W
T34N R5WAT34N R8WA T34N R6WAT34N R7WA
T34N R8W T34N R5WT34N R7W T34N R6WT34N R9W
T34N R9WA
T38N R10W
T34N R10W
T34N R10WA
T35N R4W
T36N R4W
T38N R4W
T37N R4.5W
T34.5N R9W
US-160
US
-55
620135
CTY-240
CT
Y-5
CTY_250
CT
Y-2
CT
Y-2
CT
Y-2
595.I
ST-3
CTY-
ST-172
CTY-207
CTY-525
CTY-204
CT
Y-2
620.F
171.P
160.A1
CTY_DHILLS
620.K
682.G1
203.1
604.C
Dolores
Rico Silverton
Mancos Cortez
Durango Bayfield
Ignacio
Pagosa Springs
£¤160
£¤84 £¤151
£¤550
£¤145
£¤160 £¤184
£¤160
£¤550
£¤160
PAGOSA
COLUMBINEMANCOS-DOLORES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
SAN JUAN NATIONAL FOREST
Toilet Replacement & Demo
PROJECT LOCATION MAP
³
Area of Detail
0 0.8 1.6 2.4 3.20.4
I* I*
I*
I*
I*
Eight Mile Lookout
Buckles Lake Trailhead
T34N R1E T34N R1W
T34N R2E
T33N R1ET33N R1W T33N R2ET33N R2W
T35N R1E
T34N R2W
T35N R1WT35N R2W T35N R2E
T34N R1.5W
T33N R12W
US-84
CT
Y-5
CTY-326
US-160
CTY-335
CTY_30
731.B3
024.I
008 663 .I
006.A
653.B
CT
Y-3
799010
1.E
CTY-542
CTY-600 CTY-119
651.C
024.F
663.H
CT
Y-4
6.A
731.E
653.A
649.A
4.E
029.B
024.A
653.D
6.B
656.E
609.B
663.A
7.C75
8.A
655.B
Dolores
Rico Silverton
Mancos Cortez
Durango Bayfield
Ignacio
Pagosa Springs
£¤160
£¤84 £¤151
£¤550
£¤145
£¤160 £¤184
£¤160
£¤550
£¤160
PAGOSA
COLUMBINEMANCOS-DOLORES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
SAN JUAN NATIONAL FOREST
Toilet Replacement & Demo
PROJECT LOCATION MAP
³
Area of Detail
0 0.5 1 1.5 20.25
FO
RE
ST
S
ER
VI
CE
U.
S.
D
EP
AR
TM
EN
T
OF
A
GR
IC
UL
TU
RE
RO
CK
Y M
OU
NT
AI
N
RE
GI
ON
Tr en ch D et ai ls
To ile t D em o
SA
N
JU
AN
NA
TI
ON
AL
F
OR
ES
T
SA
N
JU
AN
N F
CI
M
-0
1-
F
ST
S
ER
VI
CE
U.
S.
D
EP
AR
TM
EN
T
OF
A
GR
IC
UL
TU
RE
RO
CK
Y M
OU
NT
AI
N
RE
GI
ON
W illi am s
Cr ee k
CG
T oi le t #
W at er lin e Re lo ca tio n
W illi am s
Cr ee k Ca m pg ro un d W at er
S ys te m
SA
N
JU
AN
NA
TI
ON
AL
F
OR
ES
T
PA
GO
SA
R
AN
GE
R
DI
ST
RI
CT
ST
S
ER
VI
CE
U.
S.
D
EP
AR
TM
EN
T
OF
A
GR
IC
UL
TU
RE
RO
CK
Y M
OU
NT
AI
N
RE
GI
ON
To ile t # a nd
W at er lin e
Ca p
Lo ca tio n
Pi ne
P oi nt C am pg ro un d
SA
N
JU
AN
NA
TI
ON
AL
F
OR
ES
T
CO
LU
M
BI
NE
R
AN
GE
R
DI
ST
RI
CT
ST
S
ER
VI
CE
U.
S.
D
EP
AR
TM
EN
T
OF
A
GR
IC
UL
TU
RE
RO
CK
Y M
OU
NT
AI
N
RE
GI
ON
To ile t & W at er lin e
Ca p
Lo ca tio n
M ille r C re ek C am pg ro un d
SA
N
JU
AN
NA
TI
ON
AL
F
OR
ES
T
CO
LU
M
BI
NE
R
AN
GE
R
DI
ST
RI
CT
San Juan National Forest 2010 Toilet Demolition Project 02-02-10 CSI List - 1 CSI Specifications
CSI Specifications
No. of Pages
DIVISION 1 – GENERAL REQUIREMENTS
Section 01010 - Summary of Work ... ……………………………………………………...3 Section 01150 - Archeological Protection … ... …………………………………………….2 Section 01170 - Accident Prevention……………………………………………………….3 Section 01291 - Measurement and Payment … ……………………………………………4 Section 01732 - Mobilization …………………………………………………………….. 2
DIVISION 2 – SITE CONSTRUCTION
Section 02084 - High Density Polyethylene Piping Section 02120 - Removal and Disposal of Existing Vault Toilet Structure Section 02316 - Trenching, Backfilling and Compacting . ……………………………… Section 02510 - Water Distribution…… ... ………………………………………………
DIVISION 3 – CONCRETE
Section 03301 - Concrete, Formwork and Reinforcement
San Juan National Forest 2010 Toilet Demolition Project 02-02-10 01010 - 1 Summary of Work
SECTION 01010
SUMMARY OF WORK
PART 1 - GENERAL
1.01 SUMMARY
A. Work for this project consists of demolition of 35 vault toilet at 19 recreation site locations in the Columbine and Pagosa Ranger Districts of the San Juan National Forest; backfill of all excavation, capping of two water lines, relocation of approximately 100ft of water line and construction of a concrete pad at one toilet demolition site.
1.02 LOCATION
A. This project is located in the Columbine and Pagosa Ranger Districts of the San Juan National Forest near the towns of Durango, Bayfield and Pagosa Springs, Colorado.
1.03 GENERAL SITE CONDITIONS AND WEATHER
A. The elevation of these sites are approximately 7,000 to 9,000 feet above mean sea level. The construction sitse experience heavy snowfall and extremely cold temperatures, with snow on the ground typically from mid-November through May.
B. In-depth soil surveys have not been performed; however, rocks at the ground surface are evident throughout the area. The Contractor should expect to encounter such rock during excavation and grubbing operations. Blasting of rocks will not be permitted without special permission.
C. In-depth water table surveys have not been performed; however, if water is encountered during excavation, the Contractor shall perform adequate dewatering to keep the excavation free from water and dispose of the water without damage to property.
1.04 USE OF PREMISES
A. General: Contractor shall have full use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by the Government's right to perform work or to retain other contractors on portions of Project.
San Juan National Forest 2010 Toilet Demolition Project 02-02-10 01010 - 2 Summary of Work
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. Closures will be permitted, when required, upon written approval of the Contracting Officer (CO).
C. Confine storage of materials to areas as approved by the CO.
D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.
E. Preservation of Natural Features: Confines all operations to work limits of the project.
Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
1. Provide temporary barriers to protect existing trees and plants and root zones.
2. Do not remove, injure, or destroy trees or other plants without prior approval.
Consult with CO and remove agreed-on roots and branches that interfere with construction.
3. Do not fasten ropes, cables, or guys to existing trees.
4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
F. Existing Utilities: Notify CO and utility companies of proposed locations and times for excavation.
1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.
1.05 MEALS AND LODGING
A. Meals and lodging are commercially available in the City of Durango, Bayfield or Pagosa Springs. Meals or lodging will not be available at Forest Service facilities.
1.06 CAMPING
San Juan National Forest 2010 Toilet Demolition Project 02-02-10 01010 - 3 Summary of Work
A. With approval by the Columbine and Pagosa Springs Ranger Districts, National Forest Service lands may be used by the Contractor to have one fully contained recreation vehicle which may remain at this site for security.
1.07 CONSTRUCTION SEQUENCE
A. The schedule of construction shall occure in accordance with the schedule in the statement of work. Changes from this schedule must be approved by the CO.
B. Depending on conditions, normal fire restrictions may apply to activities associated with this project.
C. The Contractor may have an option to develop water and/or power utilities in the early stages of construction so they may be used for the remainder of the construction project.
1.08 FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
1.09 PERMITS
A. Special permits for electrical work or any other permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION
San Juan National Forest 2010 Toilet Demolition Project 02-01-10 01150 - 1 Archeological Protection
SECTION 01150
ARCHEOLOGICAL PROTECTION
PART 1 - GENERAL
1.01 SUMMARY
A. The work of this section consists of protecting archeological resources contained in soil deposits.
1.02 DEFINITIONS
A. Resources: Prehistoric, historic, and recent 20th century artifacts, including charcoal, human bones, ash, fire rocks, and building materials that indicate the presence of past human occupation.
B. Archeologically Sensitive Areas: Areas that have been determined to contain significant in-the-ground archeological resources.
C. Nonsensitive Areas: Areas that have a low likelihood of containing significant in- the-ground archeological resources.
D. Archeological Monitor: Representative of the Government designated to record and collect cultural resources for compliance with Government regulations to protect in-the-ground resources.
1.03 SUBMITTALS
NOT USED
1.04 QUALITY ASSURANCE
A. At least one week before on-site work begins, Contractor shall meet with Contracting Officer (CO) and Archeological Monitor to discuss the work schedule and equipment and special methods to be used in archeologically sensitive areas. Contractor shall ensure that approved work schedule is followed throughout construction.
PART 2 - PRODUCTS
NOT USED
San Juan National Forest 2010 Toilet Demolition Project 02-01-10 01150 - 2 Archeological Protection
PART 3 - EXECUTION
3.01 OBSERVATION
A. Archeological Monitor will observe all ground-disturbing site work, including construction of temporary facilities, at all archeologically sensitive areas, from a safe location mutually agreed on by Contractor and Monitor. As new ground is broken, Monitor will examine excavated materials, using construction layout centerline and perimeter staking as a reference point to record locations of findings.
3.02 DISCOVERY OF RESOURCES
A. If Archeological Monitor discovers resources, immediate relocation of the work to a nonsensitive area may be required to allow Monitor to take soil samples and record resources. While Archeological Monitor is documenting resources in sensitive areas, Contractor shall relocate work to nonsensitive areas where monitoring is not normally required.
B. If resources are discovered while Archeological Monitor is absent, stop work immediately and report the discovery to the Contracting Officer.
3.03 WORK STOPPAGE
A. The Contractor shall plan, schedule, and execute the work to prevent stoppage at one area from stopping all work at the construc tion site.
San Juan National Forest 2010 Toilet Demolition Project 02-01-10 01170- 1 Accident Prevention
SECTION 01170
ACCIDENT PREVENTION
PART 1 - GENERAL
1.01 DESCRIPTION
A. The work of this section consists of establishing an effective accident prevention program and providing a safe environment for all personnel and visitors.
1.02 SUBMITTALS
A. Accident Prevention Program: Before on-site work begins, submit for approval an accident prevention program. If the program requires any revisions or corrections, the Contractor shall resubmit the program within 10 days. No progress payments will be processed until the program is approved. The program shall include:
1. Name of responsible supervisor to carry out the program.
2. Weekly and monthly safety meetings.
3. First aid procedures.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, government personnel, and the Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.
5. Training, both initial and continuing.
6. Planning for possible emergency situations, such as floods, fires, cave- ins, slides, explosions, power outages, and wind storms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
B. Submit a brief report of safety meetings and of inspections.
C. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.
1.03 QUALITY ASSURANCE
A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions. In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.
B. Qualifications of Employees
1. Ensure that employees are physically qualified to perform their assigned duties in a safe manner.
San Juan National Forest 2010 Toilet Demolition Project 02-01-10 01170- 2 Accident Prevention
2. To as great an extent as possible, do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
3. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment. Newly hired operators shall be individually tested by an experienced operator or supervisor to determine if they are capable of safely operating equipment.
1.04 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 days of a reportable accident, fill out and forward to the CO a DI-134 form, which may be obtained from CO.
B. All Other Accidents: The Contractor shall report all other accidents to the CO as soon as possible and assist the CO and other officials as required in the investigation of the accident.
PART 2 – PRODUCTS
2.01 FIRST AID FACILITIES: provide adequate facilities for the number of employees and the type of construction at the site.
2.02 PERSONNEL PROTECTIVE EQUIPMENT: meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.
PART 3 – EXECUTION
3.01 EMERGENCY INSTRUCTIONS: post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
3.02 PROTECTIVE EQUIPMENT
A. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
San Juan National Forest 2010 Toilet Demolition Project 02-01-10 01170- 3 Accident Prevention
3.03 SAFETY MEETINGS
A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.
B. Conduct monthly safety meetings for all levels of supervision. Notify the CO so that he may attend. These meetings shall be used to review the effectiveness of the Contractor's safety effort, to resolve current health and safety problems, to provide a forum for planning safe construction activities, and for updating the accident prevention program. The CO will enter the results of the meetings into his daily log.
3.04 HARD HATS AND PROTECTIVE EQUIPMENT AREAS
A. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide three hard hats for use by visitors.
3.05 TRAINING
A. First Aid: Provide adequate training to ensure prompt and efficient first aid.
B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.
San Juan National Forest 2010 Toilet Demolition Project 2010 01291 - 1 Measurement and Payment
SECTION 01291
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Compensation provided for in the contract is full payment for performing all contract work in a complete and acceptable manner. All risk, loss, damage, or expense arising out of the nature or prosecution of the work is included in the compensation provided by the contract.
B. Work required by the contract will not be paid for directly unless a pay item for the work is designated in the SCHEDULE OF ITEMS.
C. Work referenced for measurement under another section will not be paid for directly unless a pay item for the work is designated in the SCHEDULE OF ITEMS for the referenced section.
D. Work not paid for directly is considered to be included under the other contract pay items.
E. Unless otherwise shown, work measured and paid for under one pay item will not be paid for under any other pay item.
F. The quantity to be paid for is the quantity designated in the SCHEDULE OF ITEMS.
No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized.
G. When more than one class, size, or thickness is specified in the SCHEDULE OF
ITEMS for any pay item, suffixes will be added to the item number to differentiate between the items.
1.02 DETERMINATION OF QUANTITIES
The following measurements and calculations are used to determine contract quantities:
A. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified.
B. The average end area method shall be used to compute volumes of excavation or embankment. However, if in the judgment of the CO the average end area method is
2010 01291 - 2 Measurement and Payment impractical, measurement shall be made by volume in hauling vehicles, or by other three-dimensional methods.
C. For aggregates weighed for payment, the tonnage weight shall not be adjusted for moisture content, unless otherwise provided for elsewhere in these specifications.
1.03 UNITS OF MEASUREMENT
Payment will be by units defined and determined according to measure. Unless otherwise specified, the meanings of the following terms are as follows:
A. Cubic Yard in Place (yd3): Measure solid volumes by the average end area method as follows:
1. Measure cross sections of the original ground and use with design or staked templates, or take other comparable measurements to determine the end areas.
Do not measure work outside of the established lines or slopes.
2. If any portion of the work is acceptable, but is not completed to the established lines and slopes, remeasure cross sections or comparable measurements of the portion of the work. Deduct any quantity outside the designated or staked limits.
Use these measurements to calculate new end areas.
3. Compute the quantity using the average end areas multiplied by the horizontal distance along a centerline or reference line between the end areas. Deduct any quantity outside the designed or staked limits.
Where it is impractical to measure material by the average end area method, other methods involving three-dimensional measurements may be used.
B. Cubic Yard in the Hauling Vehicle: Measure the cubic yard volume in the hauling vehicle using three-dimensional measurements at the point of delivery. Use vehicles bearing a legible identification mark with the body shaped so the actual contents may be readily and accurately determined. Before use, mutually agree in writing upon the volume of material to be hauled by each vehicle. Vehicles carrying less than the agreed volume may be rejected or accepted at the reduced volume.
Level selected loads. If leveling reveals that the vehicle was hauling less than the approved volume, reduce the quantity of all material received since the last leveled load by the same ratio as the ratio of the current leveled load volume to the agreed volume. Payment will not be made for material in excess of the agreed volume.
Material measured in the hauling vehicle may be weighed and converted to cubic yards for payment purposes if the conversion factors are mutually agreed to in writing.
Compute measurement using measurements of material in the hauling vehicles at the point of delivery. Load vehicles to at least their water- level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
2010 01291 - 3 Measurement and Payment
C. Each: One entire unit, which may consist of one or more parts. The quantity is the actual number of units completed and accepted.
D.. Lump Sum (LS): Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.
No adjustment in contract unit price will be made for variations in quantity due to differences in the specific gravity or moisture content.
Use net certified scale weights, or weights based on certified volumes.
1.04 METHODS OF MEASUREMENT
One of the following methods of measurement for determining final payment is designated in the SCHEDULE OF ITEMS for each pay item:
A. Designed Quantities (DQ): These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units designated in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:
1. Changes in the work authorized by the CO.
2. A determination by the CO that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.
3. A written request submitted to the CO showing evidence of errors in the original design that cause the quantity of a pay item to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.
C. Actual Quantities (AQ): These quantities are determined from measurements of completed work.
D. Vehicle Quantities (VQ): These quantities are measured or weighed in hauling vehicles.
E. Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
1.05 EARTHWORK TOLERANCES
A. Where tolerances are shown in the contract, they are intended to define “reasonably close conformity.” Make adjustments of horizontal or vertical alignment within the
2010 01291 - 4 Measurement and Payment tolerances specified in this contract, or shift of balance points up to 100 feet, as necessary to produce the designed roadway section and to balance earthwork. Such adjustments will not be considered “changes.”
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
San Juan National Forest 2010 Toilet Demolition Project 2/2/2010 01732 - 1 Mobilization
SECTION 01732
MOBILIZATION
1.01 SUMMARY
A. Move personnel, equipment, material, and incidentals to the project, and perform all activities necessary to accomplish work at the project site. Obtain permits, insurance, and bonds.
1.02 MEASUREMENT
A. Method: Measure mobilization by the lump sum.
1.03 PAYMENT
A. The accepted quantity, measured as provided above, will be paid at the contract price per unit of measurement for the pay item listed below that is designated in the SCHEDULE OF ITEMS.
B. The mobilization lump sum will be paid as follows:
1. If applicable, bond premiums will be reimbursed according to FAR clause
52.232-5, Payment Under Fixed-Price Construction Contracts, after receipt of evidence of payment.
2. Fifty percent of the lump sum, not to exceed 5 percent of the original contract amount, will be paid following completion of 5 percent of the original contract amount, not including mobilization.
3. Payment of the remaining portion of the lump sum, up to 10 percent of the original contract amount, will be paid following completion of 10 percent of the original contract amount, not including mobilization.
4. Any portion of the lump sum in excess of 10 percent of the original contract amount will be paid after final acceptance.
C. Payment will be included and is incidental to the per unit cost of demolition of each unit paid under item in Section 02120.
San Juan National Forest 2010 Toilet Demolition Project 2/2/2010 01732 - 2 Mobilization
San Juan National Forest 2010 Toilet Demolition Project 2010 02084 - 1 High Density Polyethylene Piping
SECTION 02084
HIGH DENSITY POLYETHYLENE PIPING
1.01 SCOPE
A. Provides for furnishing and installing High Density Polyethylene (HDPE) pipe used for potable water distribution and material related to its installation.
B. Contractor is responsible for verifying pipe material and sizing prior to purchasing materials or commencing waterline relocation.
PART 2 PRODUCTS
2.01 HIGH DENSITY POLYETHYLENE (HDPE) PIPE, TEES, & REDUCERS
A. All waterlines (pipe and fittings) shall be new and unused, of the type, pressure rating or class, and size (nominal diameter) specified and as SHOWN ON THE
DRAWINGS.
B. All material must meet applicable National Sanitation Foundation (NSF) standards for public drinking water. Pipe shall bear the NSF seal. The pipe manufacturer shall provide certification that the pipe meets this specification.
C. High Density Polyethylene (HDPE) plastic pipe shall be PE-3408 as defined in
ASTM D-1248, with a minimum cell classification of 345444 or 33544 in accordance with ASTM D 3350. The pipe shall be SDR7 (200 PSI) pipe and comply dimensionally with ASTM D 2737. Pipe shall comply with AWWA C901 standard for Polyethylene Pressure Pipe. The pipe shall be listed for potable water to ANSI/NSF standard 61.
D. Rolled Pipe
1. HDPE pipe equal to or smaller than 2" diameter shall be provided in rolls of
500 ft length. If the quantity of pipe needed is less than 500 ft, the lengths of rolls may be reduced.
2. HDPE pipe larger than 2" diameter shall be provided in 40' lengths rather than in rolls.
E. HDPE pipe shall be as manufactured by JM Eagle, 4501 W. 49th Street, Tulsa
OK, 74107, 1-800-962-1514, and supplied by Grand Junction Pipe & Supply Co., Durango, CO, phone (970) 385-6733; or approved equal.
San Juan National Forest 2010 Toilet Demolition Project 2010 02084 - 2 High Density Polyethylene Piping
F. HDPE tees and reducers shall be as manufactured by Mueller Company, 500 W.
Eldorado ST., Decatur IL, 62522, and supplied by Grand Junction Pipe & Supply Co., Durango, CO, phone (970) 385-6733; or approved equal.
2.02 TRANSITION FITTINGS - COMPRESSION
A. Fittings shall be as manufactured by Mueller Company, 500 W. Eldorado ST., Decatur IL, 62522, and supplied by Grand Junction Pipe & Supply Co., Durango, CO, phone (970) 385-6733; or approved equal.
B. Fittings shall be compression x female brass pipe thread.
3.01 LAYING PIPE
A. HDPE pipe shall be weaved in the trench to provide horizontal slack in the line for expansion and contraction.
B. Pipe shall be allowed to cool to within 20o F of the shaded trench bottom temperature before backfilling.
3.03 PIPE JOINING
A. The joining method for pipe, tees, and reducers shall be with compression fittings and installed per in accordance with the manufacturer's recommendations.
3.04 PIPE TRANSITIONS
A. Transitions for making connections from HDPE pipe to other threaded pipe or connections shall be per Subsection 2.02 – Transition Fittings – Compression
San Juan National Forest 2010 Toilet Demolition Project 2010 02120 - 1 Removal and Disposal of Existing Vault Toilet Structure
SECTION 02120
REMOVAL AND DISPOSAL OF EXISTING VAULT TOILET STRUCTURE
PART 1 – GENERAL
1.01 SUMMARY
A. This item shall consist of removal and disposal of all members and materials comprising an existing vault toilet structure at the locations designated in accordance with these specifications.
PART 2 – PRODUCTS
NOT APPLICABLE
PART 3 – EXECUTION
3.01 GENERAL
A. Topsoil stripping and storage, if required, shall comply with the applicable specification.
B. The abandoned vaults shall be pumped prior to demolition or removal. Vaults, or parts of them, shall be disposed of the same day as pumped or removed in accordance with location health requirements.
C. Backfill for removed items may be excess material from other excavation or borrow from an approved source.
1. Backfill sha ll be brought up in 12- inch compacted layers.
2. Compaction shall be by mechanical tampers, with at least three passes over the entire surface.
3. Maximum size of rock in backfill shall be 8 inches.
4. Backfill shall be compacted and rounded 6 inches above the natural ground.
D. After the elements of the existing toilet structure have been removed and disposed of, the remaining depression shall be backfilled. Backfilling shall not be done when the depression is saturated or flooded with water. Puddling methods of backfill consolidation will not be permitted.
E. If the backfill is in an existing unsurfaced roadway or parking area, backfill shall be as specified here, except backfill shall be graded to blend with the natural ground and each layer compacted to 85 percent of the optimum dry density determined by AASHTO T-99, Method C.
1. In areas where backfill is in graveled surface or paved surface roadways, backfill shall be as specified here, except it shall be terminated at the grade of the adjacent ground surface and each layer compacted to 85 percent of the optimum dry density determined by AASHTO T-99, Method C. Completion of backfill shall be in accordance with the applicable surfacing specifications.
F. When topsoil replacement is required, backfill and compaction shall comply with 3.1.C, except the backfill shall terminate 6 inches below the natural ground. Placement of topsoil, when required, shall comply with the applicable specifications.
G. Excessive settlement or other evidence of improper backfill shall be corrected by reopening the excavation to the depth required for proper refilling and compaction.
San Juan National Forest 2010 Toilet Demolition Project 2010 02120 - 2 Removal and Disposal of Existing Vault Toilet Structure
3.02 DISPOSAL
A. The Contractor may use any means he may elect to remove the structure as long as he provides for the safety of the public and preservation of existing vegetation.
B. The concrete in existing vault foundation and floor shall be broken into sufficiently small pieces to enable handling and disposed of as directed.
C. All wooden, concrete, and metal materials shall be removed from the site and disposed of at a designated disposal area or as otherwise approved of by the CO.
D. After the area has been backfilled, the disturbed area shall be finish graded to present a natural appearance and cleaned up by removing all debris and materials left from the removal of the toilet structures.
3.03 MEASUREMENT
A. Method of measurement shall be designated in the SCHEDULE OF ITEMS.
B. Measurement will be made for the actual number, type and location of structure demolished.
3.04 PAYMENT
Pay Item Description Pay Unit 02120(01) Vault Toilet Removal and Disposal – Single Wood .............Each
Vault Demo In-Place (Pine Point #11, Transfer Park 1A, Florida #1, Florida #2, Middle Mountain #1, Middle Mountain, Graham Creek)
02120(02) Vault Toilet Removal and Disposal – Single Wood ..............Each
Vault Removal (Snowslide, Vallecito – Deer 1B, Deer #2, Chipmunk, Wapiti 1A & Wapiti 3B)
02120(03) Vault Toilet Removal and Disposal - Single Wood...............Each
Vault Demo In-Place (Williams Creek - #1, #2, #5, #7, & #8, Middle Fork, Buckles Lake TH, Eight Mile Lookout & First Fork #2)
02120(04) Vault Toilet Removal and Disposal - Double Wood .............Each
Vault Removal (Piedra Picnic Ground, West Fork #2, Bridge - #1, #2 & #3 & Chris Park #1)
02120(05) Vault Toilet Removal and Disposal - Double Wood .............Each
(Cimarrona #1, Williams Creek #3 & West Fork #1)
02120(06) Vault Toilet Removal and Disposal - Double Masonry.........Each
San Juan National Forest 2010 Toilet Demolition Project 2010 02120 - 3 Removal and Disposal of Existing Vault Toilet Structure
(Pine Point #19, Miller & Chimney Rock)
3.05 METHOD OF MEASUREMENT
A. The quantity to be measured shall be the number and type of vault toilet structures removed and accepted. Measurement shall include native and/or imported select backfill.
2010 02316 - 1 Trenching, Backfilling, and Compacting
SECTION 02316
TRENCHING, BACKFILLING, AND COMPACTING
A. Includes excavation of trenches, installation of detection and marking tape, and backfill and compaction of trenches for the installation of utility lines to the depths and dimensions AS SHOWN ON THE DRAWINGS.
1.02 PROTECTION
A. Maintain the excavations to guard against and prevent injury to employees and the public. Provide adequate shoring and bracing as required by OSHA and other local governing regulations.
B. Protect the excavation from frost action. Compact ground that has frozen and subsequently thawed as specified herein.
C. Prevent water accumulation in excavations. If clay soil becomes saturated, compact after it has dried as specified herein.
D. Minimum depth of soil cover for utility lines (measured from the top of the pipe, conduit, or cable to final construction ground elevation required) is AS SHOWN
ON THE DRAWINGS.
1.03 REFERENCES
A. Standard Moisture Density Test, AASHTO T-99, Method C or D.
1.04 CLASS OF MATERIAL
A. All material to be excavated for installation of utilities is unclassified.
1.05 APPROVALS
A. Notify the CO when excavation is completed. Do not place pipe, bedding or backfill until the excavation is approved by the CO. Do not cover pipe until placement has been approved by the CO.
2010 02316 - 2 Trenching, Backfilling, and Compacting
PART 2 PRODUCTS
2.01 BEDDING AND INITIAL BACKFILL
A. Well-graded, rounded or angular stone or gravel, sand, or other materia l approved by the CO. Bedding may be processed from onsite-excavated material or imported from offsite. 100% of the material shall pass the 1/2" sieve, and no more than 12% of the material shall pass the No. 200 sieve. Material shall not contain frozen earth, clods, debris, or material with an exceptionally high void content (vegetative matter).
2.02 SUBSEQUENT BACKFILL
A. Earth material free from large rock greater than 6” in its largest dimension, frozen earth, clods, debris, or material with an exceptionally high void content (vegetative matter).
2.04 FREE DRAINING GRAVEL
A. Clean, rounded gravel material 3/4" - 1-1/2" in greatest dimension. AASHTO
M 43-88, Size No. 4.
2.05 SPECIAL BEDDING FOR DIRECT BURIAL CONTROL CABLE
A. For direct burial underground cable, selected fine material (soil, sand, etc.) not containing sharp or hard objects and particles capable of penetrating and mechanically damaging the cable and cable sheath.
2.06 UNDERGROUND DETECTION AND MARKING TAPE
A. General: Buried utilities shall require detection OR marking tape (as specified in Part 2.06-B & C) with the following inscription permanently written on a colored background as shown below:
UTILITY COLOR INSCRIPTION
Water Blue Caution Buried Water Line Below Sewer Green Caution Buried Sewer Line Below Electric Red Caution Buried Electric Line Below Telephone Orange Caution Buried Phone Line Below
For the inscription, similar wording with identical meaning will be approved.
The inscription shall be repeated, consecutively, along the entire length of tape.
Color substitution shall not be permitted.
2010 02316 - 3 Trenching, Backfilling, and Compacting
B. Non-metallic Piping Systems and Telephone: Use Detection tape 3" wide, 1-1/2 mil thick aluminum foil with a polyethylene covering on the inscription side, non- luminescent, and colorfast.
C. Metallic Piping Systems and Electric: Use detection tape as outlined above or marking tape 6" wide, 4-mil thick, low-density polyethylene, non-luminescent, and colorfast.
D. The tape shall be as manufactured by C.H. Hanson Company, 3630 North Wolf
Road, Franklin Park, IL 60131, (800) 827-3398 or approved equal.
3.01 EXCAVATION
A. All excavation shall be by open-cut from ground surface except when boring or tunneling is expressly called for on the drawings.
B. The sides of trenches shall be kept as nearly vertical as practicable. In no instance shall the trench from 6” above the top of the pipe to the bottom of the trench be more than 16” wider than the outside diameter of the pipe. Maximum trench width shall be 24".
3.02 BACKFILLING
A. Direct Buried Control Cable: Place 4" of fine material in direct burial cable trenches prior to installation of cable. After installation of cable, place 4" of fine material along sides and over top of cable. Compact each layer to 90 percent of maximum dry density in accordance with ASSHTO T-99, Method C.
B. Trenches shall be dry prior to placing bedding. Trenches shall not be frozen or have snow in them prior to placing bedding. Depressions in the trench bottom shall be excavated with hand tools to accommodate valves, fittings, etc.
C. Bedding shall be installed to the full width of the trench bottom to a minimum depth of 1/4 the pipe (or conduit) outer diameter (O.D.) below the pipe and across the trench 4" minimum depth in any case, and around the pipe to fully support the lower half of the pipe. The bedding material shall be tamped to the density specified in Paragraph D. Care should be taken to completely fill any space below the pipe.
D. As soon as possible after individual pipe is jointed, sufficient bedding material shall be placed along each side of the pipe to offset conditions that might tend to move the pipe off line and grade. This material sha ll be compacted to 90 percent of maximum dry density in accordance with AASHTO T-99.
2010 02316 - 4 Trenching, Backfilling, and Compacting
E. Backfill shall not be completed until pressure and/or leakage tests have been performed and the CO approves the pipeline. Sufficient backfill shall be placed to prevent pipe movement under pressure tests. This backfill shall be tamped to the density specified in Paragraph D. All joints, valves, etc., shall remain uncovered for inspection purposes during testing.
F. The initial backfill over the pipe and all backfill around the pipe shall be placed by hand and tamped. It shall be placed in one 6" layer and compacted to the density specified in Paragraph D.
G. Subsequent backfill shall be deposited and carefully compacted in layers not to exceed 12" in thickness. Each layer shall be compacted by not less than three passes over the entire surface with a mechanical vibrating tamper
H. Install marking OR detection tape (as specified in Part 2.06-B & C) over the full length of the utility, inscription side up. Tapes shall be installed 10" below finished grade.
I. 6" of topsoil shall be deposited as final backfill in trench areas where this material had been previously stripped and stockpiled. This topsoil layer shall be compacted sufficiently to remain in place but remain loose enough to allow plant growth.
J. Excessive settlement or other evidence of improper backfill shall be corrected by reopening the trench to the depth required for proper compaction and then shall be refilled and satisfactorily compacted.
K. At any location where backfill has settled below normal ground surface, the
Contractor shall provide additional earth…
This is the start of the file's text. The full file is on GovTribe.