Solicitation AG-82B1-S-10-0153.pdf
PDF 269 KB Posted
- Solicitation number
- AG-82B1-S-10-0153
About this file
Full Solicitation package - including experience questionnaire and wage determinations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 2.doc | DOC document | |
| Amendment 1.doc | DOC document | |
| page 1pdf.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION PAGE OF PAGES
(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE 1 60
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING
AG-82B1-S-10-0153 3/26/2010
UNDER BDSA REG. 2 �
AND/OR DMS REG. 1
5a. ISSUED BY 6. DELIVER BY (Date) EROC intermountain Team 740 Simms Street Golden, CO 80401
5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)
AREA CODE NUMBER 9. DESTINATION
Sandra Aiken 208 983-4015 a. NAME OF CONSIGNEE
8. TO:
a. NAME b. COMPANY b. STREET ADDRESS
c. STREET ADDRESS c. CITY
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR BEFORE
CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the
April 12, 2010 @ 4:00 p.m. PST
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT
PRICE
AMOUNT
(a) (b) (c) (d) (e) (f)
RECOVERY – ELECTRICAL
UPGRADES, SAWTOOTH VALLEY
WORK CENTER
Sawtooth National Forest, Custer County
YOU MAY SUBMIT YOUR QUOTE TO THE
ADDRESS IN BLOCK 5A OR BY FAX
TO 208-983-4098
Your quote must include:
SF 18, Schedule of Items, and a Technical Proposal
(Section M). You must be Registered in CCR (Section J) and in ORCA (Section K)
DUNS # ____________________________
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT � NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME OF QUOTER SIGN QUOTATION QUOTATION
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER
18-121 STANDARD FORM 18 (Rev. 6-95)
CONSTRUCTION RFQ AG-82B1-S-10-0153
Sawtooth National Forest Electrical Upgrades , Sawtooth Valley Work Center
PART I—THE SCHEDULE
SECTION B -- SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS: SAWTOOTH VALLEY WORK CENTER ELECTRICAL
UPGRADES
Item No.
Description
Unit
Quantity
Price
Sawtooth Valley Work Center Electrical Updates
LS
B-2 – FURNISHED QUOTES: Technical proposals are required for the evaluation of quotes. See Section M for evaluation and award information. You may use the Experience Questionnaire provided in Section J.
Electrical Upgrades , Sawtooth Valley Work Center
SECTION C -- DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Description of Work:
The work for this project consists of the updating of electrical wiring at the Sawtooth Valley Work Center on the Sawtooth National Recreation Area, Sawtooth National Forest. The project consists of, but is not limited to, service panel repair and labeling, feeder replacement, luminary replacement, load center replacement, grounding work, and branch circuit installation. Work shall include the installation of new anchor bolts. All work shall comply with local and state codes and industry standards.
Project Location:
The project is located on the Sawtooth National Recreation Area on the Sawtooth National Forest. The project is located at the Sawtooth Valley Work Center which is approximately 15 miles by road south of the city of Stanley, Idaho. The project is located in Custer County, T8N, R14E, Section 9.
Period of Performance:
The Contractor shall (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use no later than 45 calendar days. The time stated for completion shall include final cleanup on the premises.
Pre-bid Tour –Wednesday, March 31, 2010 at 1:00 pm at the Sawtooth Valley Work Center for information call DuWayne Kimball, 208-737-3207.
Estimated Start Date: May 03, 2010
Estimated Price Range: between $25,000 and $100,000
PROJECT SPECIFICATIONS
Section 000050 - Project Description Section 260500 - Common Work Results For Electrical Section 260519 - Low-Voltage Electrical Power Conductors And Cables Section 260526 - Grounding And Bonding For Electrical Systems Section 260533 - Raceway And Boxes For Electrical Systems Section 260553 - Identification For Electrical Systems Section 262726 - Wiring Devices Section 267500 - Carbon Monoxide (CO) And Smoke Alarms
Electrical Upgrades , Sawtooth Valley Work Center
SECTION 000050
PROJECT DESCRIPTION
PART 1 - GENERAL
1.1 This project is to update electrical wiring at the Sawtooth Valley Work Center and includes work at the following locations with details under “PART 3 EXECUTION” of Specification 000050.
A. Main Service: Minor damage correction and panel labeling.
B. Warehouse: Replace small above grade feeder and three luminaires and other minor work.
C. Ranger Dwelling: Replace load center, feeder and grounding work, and several new and existing branch circuits.
D. Shop/Dwelling: Replace load center, new shop load center, feeder and grounding work, and several new and existing branch circuits.
E. Small Bunkhouse: Feeder and grounding work, and several new and existing branch circuit work.
F. Office: Grounding and minor branch circuit work.
G. Gas House and Barn: Grounding, replace luminaire, and minor work.
H. Main Bunkhouse: Grounding and minor work.
I. Trailer Pads: Grounding and minor work.
1.2 MEASUREMENT AND PAYMENT
A. Measurement shall be the JOB completed and ready for use. The quantity measured shall be paid for at the contract Lump Sum price as shown on the Schedule of Items.
1.3 RELATED WORK
B. The work shall be in accordance with the following subsidiary specifications. The subsidiary specifications are referred to in the text by the Section designation only.
Section 000050 - Project Description Section 260500 - Common Work Results For Electrical Section 260519 - Low-Voltage Electrical Power Conductors And Cables Section 260526 - Grounding And Bonding For Electrical Systems Section 260533 - Raceway And Boxes For Electrical Systems Section 260553 - Identification For Electrical Systems Section 262726 - Wiring Devices Section 267500 - Carbon Monoxide (CO) And Smoke Alarms
Electrical Upgrades , Sawtooth Valley Work Center
PART 2 - PRODUCTS - Not Applicable
PART 3 - EXECUTION
3.1 UTILITIES
A. Utilities, (electricity and water) will not be available for contractor's use. It shall be the contractor's responsibility to maintain water and electrical needed to maintain safe conditions.
3.2 BUILDING ENVIRONMENT
A. Contractor shall maintain a clean, dust free environment throughout the progress of work.
3.3 JOB DETAILS
A. General
1. Work shall be in accordance with the drawings and the project specifications.
2. The site and floor plans shown are not accurate, but are shown to give you an idea of relationships and approximate locations. Where additional receptacles are called for, provide spacing to meet code. Where inadequate receptacle numbers to meet code are requested, locate as directed by the contracting officer using code spacing as a guide.
3. Where fishing new circuits through walls is not possible, install circuits in metal wire mold in finished areas, or EMT in unfinished areas with NM cabling allowed where strung through joists in residential unfinished basements (see specifications).
4. Numbers for replacing existing receptacle and switches with plates may be incorrect.
a. Where a building indicates the replacement of these devices, notify the Contracting Officer of any additional devices beyond what is called for installation, for approval.
b. Upon replacement, Kitchen and Bathroom GFCI requirements shall be met and may be protected through down feed.
c. Upon replacement, warehouse, shops, and other similar work areas shall also have GFCI protection provided at each receptacle. Down feeding GFCI protection is not allowed.
5. All light fixtures in ranger dwelling, dwelling portion of the shop/dwelling, and small bunkhouse shall be pulled, check the existing wiring for brittleness and damage, and reinstall or if called for, replaced. Replace damaged or brittle wiring, at connections with new pigtails.
6. Provide proper pigtails where inadequate conductor length is present at pulled luminaries, replaced receptacles and switches according to specifications.
7. All five buildings with phone service shall have a ground rod installed for the phone service if over 20 feet to the electrical entrance panel, and shall in all cases be bonded to the electrical grounding electrode system.
Electrical Upgrades , Sawtooth Valley Work Center
B. Main Service
1. Label the load center to reflect the following information in quotes:
Ckt 1,3 (30 amp) "Gas House" Ckt 5,7 (30 amp) "Barn" verify this and correct as needed.
Ckt 9,11 (100 amp) "Rangers Dwelling" Ckt 2,4 (70 amp) "Shop/Bunkhouse" Ckt 6 (20 amp) "Warehouse" Ckt 8,10 (100 amp) "Little Bunkhouse"
2. Install a knockout plug (about 3” hole) in panel.
3. Repair damage to panel enclosure by straightening edges and repaint any damaged finish with factory battleship gray paint. Painting the entire enclosure not required.
C. Warehouse
1. Replace damaged 1/2” EMT w/2 #12 and 1 #12 ground feeding warehouse from service to the eave of the building with weatherproof fittings. Install a NEMA 3R or other approved junction box at flying splice and exposed circuit entrance at eave to warehouse.
Inspect exposed conductors at flying splice for damage and report to contracting officer conductor condition.
2. Replace exterior luminary (type E) at personnel entrance.
3. Replace two interior bare bulb luminaries (type A) in the work area. Remove the two luminaries in the garage area and relocate circuit to feed two luminaries (type G) to be located equally spaced in the room up near the peak of the roof mounted horizontal to the earth with the long axis perpendicular to the ridge line. Chain or pendant mounting not allowed, this will require building small mounting platforms to support the entire length of the luminaries.
4. Replace missing cover plate and plastic switch faceplate with metal cover/face plates.
Replace both receptacles with GFCI Receptacles (down feed not permitted) with metal faceplates.
D. Ranger Dwelling
1. Install a ground rod at the main disconnect (building north exterior). Install a ground kit and bond water service.
a. Separate ground and neutral but bonding shall remain intact unless feeder to the building contains an equipment grounding conductor or is installed in metal conduit all the way back to the service (remove all neutral bonding at the building and test resistance between neutral and conduit with the power off).
2. Verify conduit grounding path from existing load center to main disconnect or install an #8 equipment grounding conductor.
3. Replace existing Square D load center (9-inch wide) in kitchen as shown.
4. Remove and replace water heater circuit. The existing disconnect at the water heater may be reused.
Electrical Upgrades , Sawtooth Valley Work Center
5. Remove circuit extensions to the furnace and washer. Install furnace (fused single pole switch disconnect required) and washer (GFCI receptacle required) on new individual circuits.
6. Kitchen receptacles (2 existing on counter, fridge, and two general) shall be removed from the existing circuit(s) and installed on two new circuits called for.
a. The existing circuits shall remain operational to feed devices to remain, but dead end conductors shall be removed if possible without damaging the kitchen finish, otherwise shall be permanently disconnected from source of power.
b. The existing boxes may be reused or blanked off with a blank face plate.
c. Kitchen counter top shall have four counter top receptacles, spaced maximum per
NEC on 2 circuits.
d. Fridge, shall be on the circuit opposite of the two general use receptacles.
e. If the fridge or two general use receptacles do not exist, provide receptacles with the general use receptacles located close to center on the east and west walls.
7. Install a dryer circuit with receptacle between the two windows in the basement about where shown on the drawings.
8. Install a receptacle by bathroom sink on new circuit.
9. Install a new general purpose receptacle circuit to feed only 4 new GFCI protected receptacles located on the west and south walls of the basement. Space as if meeting NEC 210.52(A)(1). The receptacles may be down fed from a GFCI receptacle, or, each receptacle may be GFCI type.
10. Replace two kitchen luminaries (missing globes) (type A), two bedroom luminaries (missing globes) (type A), two luminaries (type B) in upstairs clothes closets, two luminaries at the bathroom sink with a single luminary over the sink (type C), one over stairs (type B), and one on back porch (type D). See luminary schedule.
11. Install new CO and smoke alarm interconnected circuit with devices and interconnect.
CO/smoke combination alarm is only required in the basement, one smoke alarm on the main floor, and three for the bedrooms and hall.
12. Replace existing 12 receptacles, and 8 single pole; five 3-way; and one 4-way switch.
Note: Many existing receptacles are 2 prong without ground.
a. If an equipment ground exists in the circuit it shall be properly connected and attached in each device box.
b. Where equipment grounding does not exist, GFCI protection shall be provided at each receptacle or down fed from the first receptacle in the circuit.
13. Label panel including a descriptive label for existing unlabeled circuits.
E. Shop/Dwelling
1. Replace load center and install a ground rod and bond water service.
a. Separate grounds and neutrals but bonding shall remain intact unless feeder to the building contains an equipment grounding conductor or is installed in metal conduit all the way back to the service (remove all neutral bonding at the building and test resistance between neutral and conduit with the power off).
Electrical Upgrades , Sawtooth Valley Work Center
b. With separation of shop loads, heater, and kitchen receptacles it is likely that the 4 existing 20 amp circuits will decrease to 3 circuits as shown in the panel schedule, otherwise combine the 2 smallest loads into a single breaker to make a total of 3 existing circuits.
2. Replace water heater circuit, load center is within sight so a separate disconnect is not required.
3. Kitchen receptacles (2 existing near counter right hand side and one by water heater) shall be removed from the existing circuit(s) and installed on two new circuits called for.
a. The existing circuits shall remain operational to feed devices to remain, but dead end conductors shall be removed if possible without damaging the kitchen finish, otherwise shall be permanently disconnected from source of power.
b. The existing boxes may be reused or blanked off with a blank face plate.
c. Kitchen counter tops shall have 2 additional receptacles, located/spaced maximum per NEC on same 2 circuits.
d. Install a general receptacle for the fridge and one on the wall next to the table.
These may not be on the same circuit as the receptacle to serve the microwave stand.
4. Install a receptacle by bathroom sink on new circuit.
a. Remove and blank off receptacle in bathroom sink luminary.
5. Install one receptacle each, in the center of the bedroom west wall and east wall on existing circuit that feeds the bedroom.
6. Separate wall heater from all other loads and install on individual branch circuit as shown.
7. Install a switch and luminary type E on the building exterior. Place on a circuit that feeds the bedroom.
8. Replace kitchen sink luminary, type A.
9. Install new CO and smoke alarm interconnected circuit with devices and interconnect.
CO/smoke combination alarms are required in the shop and living room, one smoke alarm in the bedroom.
10. Provide access to existing electrical service behind plywood of open closet/shelving by routing out a rectangular hole centered on the receptacle. Round and smooth plywood edges after machining.
11. Replace existing 8 receptacles, and 2 single pole; and two 3-way switch in dwelling.
Note: Many existing receptacles are 2 prong without ground.
a. If an equipment ground exists in the circuit it shall be properly connected and attached in each device box.
b. Where equipment grounding does not exist, GFCI protection shall be provided at each receptacle or down fed from the first receptacle in the circuit.
12. Label new load center including a descriptive label for existing unlabeled circuits.
13. Install new feeder and load center to shop, separate all shop loads from residential loads.
14. Welder receptacle is either tapped into the stove or is unprotected, route to new shop load center.
Electrical Upgrades , Sawtooth Valley Work Center
15. Install 3 evenly spaced GFCI receptacles to feed the entire bench, down feeding the GFCI protection is not allowed.
16. Install a 240 VAC, NEMA L6-20R receptacle near welder receptacle.
17. Install a 240VAC, NEMA R6-15R receptacle at the air compressor location.
18. Replace cord set for table saw with a #12/2 with ground cord set incorporating an anti-restart device such as a Woodhead #20054-25 and NEMA L6-20P plug, with the load side hard wired into the table saw end with strain relief.
19. Replace plug end for grinder cord, NEMA 5-15P plug Hubbell #HBL5266C or equal.
20. Replace cord set on newest air compressor, #14/2 with ground type SO, NEMA 6-15P plug, and change air compressor motor taps to operate at 240 VAC.
21. Replace existing 2 receptacles with GFCI receptacles, GFCI down feed not permitted.
22. Remove the 3 fluorescent luminaries chain hung and improperly wired above the bench.
Install two new luminaries (type G) chain hung 24” from ceiling, tandem wired to be directly over someone working at the bench yet provide lighting to the rest of the room.
23. Remove the switch by the garage door. It is unknown what purpose this switch serves.
24. Replace single pole switch at shop exterior entrance with 3-way switch and extend circuit to a second 3-way at shop dwelling access door.
25. Install a pilot light switch and a motion sensor controlled luminaire type F at the shop entrance.
26. Label panels including a descriptive label for existing unlabeled circuits.
F. Small Bunkhouse
1. Install a ground rod and bond water service.
a. Separate grounds and neutrals but bonding shall remain intact unless feeder to the building contains an equipment grounding conductor or is installed in metal conduit all the way back to the service (remove all neutral bonding at the building and test resistance between neutral and conduit with the power off).
2. Verify conduit grounding path from existing load center to main disconnect or install an #8 equipment grounding conductor.
3. Install ground bar kit in existing load center and separate equipment grounds and neutrals. Cutler Hammer #GBK10.
4. Replace the 4 existing 20 amp circuit breakers with Cutler-Hammer #BR120CAF.
5. Install 2 new circuits to feed the kitchen counters. One for each side of the sink and 2 serving the counter sharing the bathroom wall. Fridge to remain on existing circuit.
6. Install a receptacle by bathroom sink on new GFCI protected circuit.
7. Replace bathroom and kitchen luminaries, type A.
8. Replace exterior entrance luminary, type E.
9. Install new CO and smoke alarm interconnected circuit #BR115CAF with devices and interconnect. CO/smoke combination alarm is only required in the living room, and one smoke alarm in the bedroom.
10. Label panel including a descriptive label for existing unlabeled circuits.
11. Replace existing 6 receptacles, and 2 single pole; and two 3-way switches. Note: Many existing receptacles are 2 prong without ground.
a. If an equipment ground exists in the circuit it shall be properly connected and attached in each device box.
Electrical Upgrades , Sawtooth Valley Work Center
b. Where equipment grounding does not exist, GFCI protection shall be provided at each receptacle or down fed from the first receptacle in the circuit.
c. The GFCI receptacle in the kitchen may remain.
G. Office
1. Install a ground rod and bond water service.
a. Install a ground bar kit in existing load center, Square D #PK15GTA.
b. Separate grounds and neutrals but bonding shall remain intact unless feeder to the building contains an equipment grounding conductor or is installed in metal conduit all the way back to the service (remove all neutral bonding at the building and test resistance between neutral and conduit with the power off).
c. Separate neutrals on neutral bar to only one conductor per lug.
2. Install a receptacle by bathroom sink on new circuit.
3. Remove the rest of the bathroom fluorescent luminaries at the sink and blank-off/remove circuits as possible. See photo of luminaries of Ranger Dwelling bathroom for type.
4. Replace front entry interior luminary (type B).
5. Remove and reinstall both luminaries in the large office area with box extensions.
6. Label panel including a descriptive label for existing unlabeled circuits.
7. Replace existing 8 two-prong receptacles, and 5 single pole switches. Many existing receptacles are 2 prong without ground.
a. If an equipment ground exists in the circuit it shall be properly connected and attached in each device box.
b. Where equipment grounding does not exist, GFCI protection shall be provided at the breaker, each receptacle, or down fed from the first receptacle in the circuit.
H. Gas House
1. Install a ground rod.
a. Install a ground bar kit in existing load center, Square D #PK4GTA.
b. Separate grounds and neutrals but bonding shall remain intact unless feeder to the building contains an equipment grounding conductor or is installed in metal conduit all the way back to the service (remove all neutral bonding at the building and test resistance between neutral and conduit with the power off).
2. Remove both fuses, insert fuse holders with Type S adapter and Type S 15 amp fuses.
3. Replace exterior HPS luminary with luminary and motion sensor (type F).
I. Barn
1. Install a ground rod.
a. Install a ground bar kit in existing load center, Square D #PK4GTA.
b. Separate grounds and neutrals but bonding shall remain intact unless feeder to the building contains an equipment grounding conductor or is installed in metal conduit
Electrical Upgrades , Sawtooth Valley Work Center all the way back to the service (remove all neutral bonding at the building and test resistance between neutral and conduit with the power off).
2. Install an additional 0.5” EMT conduit strap on existing conduit inadequately supported in feed room.
J. Main Bunkhouse
1. Solidly remount the existing electrical service.
2. Install a ground bar kit in existing interior upstairs load center, Square D #PK15GTA.
a. Separate equipment grounds and neutrals.
3. Replace kitchen circuit breakers in spaces 22, 27, 30, and 33 with Square D #QO120GFI breakers. Replace three washer circuit breakers (two in basement load center and one upstairs) with the same, circuit numbers are unknown.
a. Only in the unlikely event that any of these are multi-wire circuits then the first receptacle may be replaced with a GFCI receptacle down feeding the other receptacles.
4. Remove and blank off the receptacles in the kitchen and bathroom sink luminaires.
5. Install missing cover plate in basement.
K. East Trailer Pads
1. Install knockout plug (goof seal) in service.
2. Install a supplementary ground rod 10 feet from service.
3. Remount all five fence post mounted trailer pedestals securely to the posts.
L. North Trailer Pads
1. The two Midwest Pedestals protected by circuit breakers shall have the 20 amp breakers replaced with GE #THQL1120GF breakers.
2. Remove and blank-off 20 amp receptacle and disable 20 amp fuse in fused pedestal.
END OF SECTION - 000050
Electrical Upgrades , Sawtooth Valley Work Center
SECTION 260500
COMMON WORK RESULTS FOR ELECTRICAL
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Electrical equipment coordination and installation.
2. Common electrical installation requirements.
1.2 SUBMITTALS
A. Product Data:
1. For any substitutions for equipment referred to by name.
1.3 QUALITY ASSURANCE
A. The installation shall conform to the 2008 Edition of the National Electrical Code (NFPA 70) and to the requirements specified herein.
B. The Contractor shall perform all work necessary and required to accomplish the task as detailed on the drawings and discussed in the installation notes. All work shall be done by a state licensed electrician.
1.4 MEASUREMENT AND PAYMENT
A. No separate measurement or payment will be made for work specified in this section. All work will be included in other items listed in the Schedule of Items.
PART 2 - PRODUCTS
2.1 PRODUCTS REFERRED TO BY NAME
A. The materials referred to by trade name, make, or catalog number on the drawings shall be regarded as establishing a minimum standard of quality; substitutions of equal or greater quality can be made by submitting a data sheet of the proposed substituted item to the Contracting Officer, for approval.
Electrical Upgrades , Sawtooth Valley Work Center
PART 3 - EXECUTION
3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION
A. Comply with NECA 1.
B. Measure indicated mounting heights to bottom of unit for suspended items and to center of unit for wall-mounting items.
C. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity.
END OF SECTION - 260500
Electrical Upgrades , Sawtooth Valley Work Center
SECTION 260519
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
PART 4 - GENERAL
4.1 SUMMARY
A. This Section includes the following:
1. Building wires and cables rated 600 V and less.
2. Connectors, splices, and terminations rated 600 V and less.
4.2 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
B. Comply with NFPA 70.
4.3 MEASUREMENT AND PAYMENT
A. No separate measurement or payment will be made for work specified in this section. All work will be included in other items listed in the Schedule of Items.
PART 5 - PRODUCTS
5.1 CONDUCTORS AND CABLES
A. Copper Conductors: Comply with NEMA WC 70.
B. Conductor Insulation: Comply with NEMA WC 70 for Types THHN-THWN.
C. Multiconductor Cable: Comply with NEMA WC 70 for nonmetallic-sheathed cable, Type NM and Type SO with ground wire.
5.2 CONNECTORS AND SPLICES
A. Description: Factory-fabricated connectors and splices of size, ampacity rating, material, type, and class for application and service indicated.
Electrical Upgrades , Sawtooth Valley Work Center
PART 6 - EXECUTION
6.1 CONDUCTOR MATERIAL APPLICATIONS
A. Typical: Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.
6.2 CONDUCTOR INSULATION AND MULTICONDUCTOR CABLE APPLICATIONS AND
WIRING METHODS
A. Exposed Branch Circuits: Type THHN-THWN, single conductors in raceway.
B. Branch Circuits in Crawlspaces and Unfinished Basements: Nonmetallic-sheathed cable, Type NM.
C. Branch Circuits Concealed in Ceilings, Walls, and Partitions: Nonmetallic-sheathed cable, Type NM.
D. Appliance Connections: Type SO, hard service cord with stainless-steel, wire-mesh, strain relief device at terminations to suit application.
6.3 INSTALLATION OF CONDUCTORS AND CABLES
A. Conceal cables in finished walls, ceilings, and floors, unless otherwise indicated.
B. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.
C. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips, that will not damage cables or raceway.
D. Install exposed cables parallel and perpendicular to surfaces of exposed structural members, and follow surface contours where possible.
6.4 CONNECTIONS
A. Tighten electrical connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A and UL 486B.
B. Make splices and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors.
C. Wiring at Outlets: Install conductor at each outlet, with at least 6 inches (150 mm) of slack.
Electrical Upgrades , Sawtooth Valley Work Center
6.5 FIELD QUALITY CONTROL
A. Remove and replace malfunctioning or damaged units.
END OF SECTION - 260519
Electrical Upgrades , Sawtooth Valley Work Center
SECTION 260526
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
PART 7 - GENERAL
7.1 SUMMARY
A. This Section includes methods and materials for grounding systems and equipment.
7.2 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
B. Comply with UL 467 for grounding and bonding materials and equipment.
7.3 MEASUREMENT AND PAYMENT
A. No separate measurement or payment will be made for work specified in this section. All work will be included in other items listed in the Schedule of Items.
PART 8 - PRODUCTS
PART 9 - CONDUCTORS
A. Insulated Conductors: Copper wire or cable insulated for 600 V unless otherwise required by applicable Code or authorities having jurisdiction.
B. Bare Copper Conductors:
1. Solid Conductors: ASTM B 3.
2. Stranded Conductors: ASTM B 8.
9.2 CONNECTORS
A. Listed and labeled by a nationally recognized testing laboratory acceptable to authorities having jurisdiction for applications in which used, and for specific types, sizes, and combinations of conductors and other items connected.
B. Bolted Connectors for Conductors and Pipes: Copper or copper alloy, bolted pressure-type, with at least two bolts.
1. Pipe Connectors: Clamp type, sized for pipe.
Electrical Upgrades , Sawtooth Valley Work Center
9.3 GROUNDING ELECTRODES
A. Ground Rods: Copper-clad steel; 3/4 inch by10 feet (19 mm by 3 m) in diameter.
PART 10 - EXECUTION
10.1 APPLICATIONS
A. Conductors: Install solid conductor for No. 10 AWG and smaller, and stranded conductors for No. 6 AWG and larger, unless otherwise indicated.
B. Underground Grounding Conductors: Install bare copper conductor, as sized on the drawings minimum.
1. Bury at least 18 inches (450 mm) below grade.
C. Conductor Terminations and Connections:
1. Pipe and Equipment Grounding Conductor Terminations: Bolted connectors.
2. Connections to Ground Rods: Bolted connectors.
10.2 EQUIPMENT GROUNDING
A. Install insulated equipment grounding conductors with all new branch circuits. Where not otherwise shown in the drawings size per NEC 250.122 minimum.
10.3 INSTALLATION
A. Grounding Conductors: Route along shortest and straightest paths possible, unless otherwise indicated or required by Code. Avoid obstructing access or placing conductors where they may be subjected to strain, impact, or damage.
B. Ground Rods: Drive rods until tops are 2 inches (50 mm) below finished floor or final grade, unless otherwise indicated.
1. Interconnect ground rods with grounding electrode conductor below grade and as otherwise indicated. Make connections without exposing steel or damaging coating, if any.
C. Grounding and Bonding for Piping:
Metal Water Service Pipe: Install copper grounding conductors from building's main service equipment, or grounding bus, to main metal water service entrances to building. Connect grounding conductors to main metal water service pipes, using a bolted clamp connector. Where a dielectric main water fitting is installed, connect grounding conductor on street side of fitting and bond across the fitting.
END OF SECTION 260526
Electrical Upgrades , Sawtooth Valley Work Center
SECTION 260533
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
PART 11 - GENERAL
11.1 SUMMARY
A. This Section includes raceways, fittings, boxes, and enclosures.
11.2 DEFINITIONS
A. EMT: Electrical metallic tubing.
11.3 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
B. Comply with NFPA 70.
11.4 MEASUREMENT AND PAYMENT
A. No separate measurement or payment will be made for work specified in this section. All work will be included in other items listed in the Schedule of Items.
PART 12 - PRODUCTS
12.1 METAL CONDUIT AND TUBING
A. EMT: ANSI C80.3.
B. Fittings for EMT, and Cable: NEMA FB 1; listed for type and size raceway with which used, and for application and environment in which installed.
1. Fittings for EMT: Steel or die-cast, set-screw or compression type.
12.2 SURFACE RACEWAYS
A. Surface Metal Raceways: One-piece steel with snap-on covers, Manufacturer's standard enamel finish if off-white, otherwise with prime coating or finish, ready for field painting off-white similar to wall finishes. Where the standard finish is not off-white but is similar in color to the wall finish acceptable to the Contracting Officer, painting is not required.
Electrical Upgrades , Sawtooth Valley Work Center
12.3 BOXES, ENCLOSURES, AND CABINETS
A. Sheet Metal Outlet and Device Boxes: NEMA OS 1.
B. Nonmetallic Outlet and Device Boxes: NEMA OS 2.
C. Small Sheet Metal Pull and Junction Boxes: NEMA OS 1.
D. Cast-Metal Access, Pull, and Junction Boxes: NEMA FB 1, cast aluminum with gasketed cover.
PART 13 - EXECUTION
13.1 RACEWAY APPLICATION
A. Outdoors: Apply raceway products as specified below, unless otherwise indicated:
1. Exposed Conduit: EMT where UL listed raintight fittings are used and the raceway is 6-inch (150-mm) minimum above finished grade.
2. Boxes and Enclosures, Aboveground: NEMA 250, Type 3R.
B. Comply with the following indoor applications, unless otherwise indicated:
1. Exposed, Shops and Work Areas: EMT.
2. Exposed, Living Quarters: Surface metal raceway.
3. Boxes and Enclosures: NEMA 250, Type 1.
C. Raceway Fittings: Compatible with raceways and suitable for use and location.
13.2 INSTALLATION
A. Comply with NECA 1 for installation requirements applicable to products specified in Part 2 except where requirements on Drawings or in this Article are stricter.
B. Keep raceways at least 6 inches (150 mm) away from parallel runs of flues and hot-water pipes.
Install horizontal raceway runs above water piping.
C. Complete raceway installation before starting conductor installation.
END OF SECTION - 260533
SECTION E -- INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements (APR 1984) 52.246-12 Inspection of Construction (AUG 1996)
SECTION F -- DELIVERIES OR PERFORMANCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 45 days after the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
Electrical Upgrades , Sawtooth Valley Work Center
SECTION H – SPECIAL CONTRACT REQUIREMENTS
KEY PERSONNEL
The key personnel specified in the Offeror's Technical Proposal are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract.
No diversion shall be made by the Contractor without the written consent of the Contracting Officer:
Provided that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by this clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.
FIRE CONTROL
(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service.
Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.
Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.
An equitable adjustment in contract time may be made for this period.
(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.
(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement.
Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.
(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:
One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with a 4 BC or higher rating.
Electrical Upgrades , Sawtooth Valley Work Center
One - shovel, round point #0 lady or equal.
One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.
One - water container (at least 1-gallon capacity), not required with stationary equipment.
(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.
(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:
One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.
One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.
Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.
(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.
(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site when all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.
(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.
(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.
All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.
Electrical Upgrades , Sawtooth Valley Work Center
(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.
(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.
When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:
(i) All high fire risk operations could be terminated at 1300 local time.
(ii) All burning could be stopped, including debris burning fires.
(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.
(12) Pump and Trailer. NOT USED
(13) Burning. Before starting any open burning, the Contractor shall comply with the following:
(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.
(ii) Submit a burning permit from the District Ranger.
(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.
(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.
(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.
(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his discretion, prohibit all open burning for definite periods within specific areas of the National Forest.
Electrical Upgrades , Sawtooth Valley Work Center
PREWORK CONFERENCE
Prior to commencement of work, the Contracting Officer’s Representative will arrange a meeting with the Contractor to discuss the contract terms and work performance requirements. Also at this meeting such things as work progress schedule and fire prevention and suppression plans shall be developed and established in writing.
PART II -- CONTRACT CLAUSES
SECTION I -- CONTRACT CLAUSES
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.204-9 Personal Identity Verification of Contractor Personnel (SEP 2007) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008)
(Applicable if contract exceeds $30,000) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.219-6 Notice of Total Small Business Set-Aside (JUN 2003) 52.222-3 Convict Labor (JUN 2003) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (FEB 1988) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988) 52.222-20 Walsh-Healy Public Contracts Act (DEC 1996) (Applicable if contract exceeds $10,000) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) (Applicable if contract exceeds $10,000) 52.222-26 Equal Opportunity (MAR 2007) (Applicable if contract exceeds $10,000) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) (Applicable if contract exceeds $10,000) 52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998) (Applicable if contract exceeds $10,000) 52.222-50 Combating Trafficking in Persons (SEP 2007) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction
Contracts (DEC 2007) 52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003) 52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.224-1 Privacy Act Notification (APR 1984) 52.224-2 Privacy Act (APR 1984)
Electrical Upgrades , Sawtooth Valley Work Center
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) (Applicable if contract exceeds $30,000) 52.228-11 Pledges of Assets (FEB 1992) (Applicable if contract exceeds $30,000) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) (Applicable if contract exceeds $30,000) 52.228-14 Irrevocable Letter of Credit (DEC 1999) (Applicable if contract exceeds $30,000) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-23 Assignment of Claims (JAN 1986) 52.232-27 Prompt Payment for Construction Contracts (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003) 52.233-1 Disputes (JUL 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
(APR 1984)
52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .