About this file

Schedule B Amend 4

View the file

Other files

File Type Posted
Wednesday March 10 2010.pdf PDF
SF 30 AMEND 4.PDF PDF
SF 30 AMEND 3.PDF PDF
TrapperBunk Sht_12 —
TrapperBunk Sht_19 —
TrapperBunk Sht_5 —
SF 30 AMEND 2.PDF PDF
TrapperBunk Sht_18 —
TrapperBunk Sht_11 —
SF 30 AMENDMENT 1.PDF PDF
TrapperBunk Sht_1 —
SF 1442.PDF PDF
TrapperBunk Sht_7 —
TrapperBunk Sht_17 —
TrapperBunk Sht_13 —
TrapperBunk Sht_15 —
AG-82B1-S-10-0126.pdf PDF
TrapperBunk Sht_3 —
SF 1442.PDF PDF
TrapperBunk Sht_28 —
TrapperBunk Sht_10 —
TrapperBunk Sht_16 —
TrapperBunk Sht_4 —
TrapperBunk Sht_14 —
wage determination.txt TXT text file
TrapperBunk Sht_9 —
TrapperBunk Sht_25 —
TrapperBunk Sht_8 —
TrapperBunk Sht_23 —
TrapperBunk Sht_20 —
TrapperBunk Sht_27 —
374_SPS.doc DOC document
TrapperBunk Sht_26 —
TrapperBunk Sht_22 —
TrapperBunk Sht_6 —
TrapperBunk Sht_21 —
TrapperBunk Sht_24 —
TrapperBunk Sht_2 —
Amendment 001 —
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITAION NUMBER AG-82B10-S-10-0113 AMENDMENT FOUR (4)

SECTION B - Supplies or Services and Prices/Costs Schedule of Items

TRAPPER BUNKHOUSE ROAD RECONSTRUCTION

DARBY RANGER DISTRICT

BITTERROOT NATIONAL FOREST

ITEM
DESCRIPTION
Method of Measure
Units
Quantities
Unit Cost
Total Cost
15101
Mobilization
LSQ
LS
1
$ ________
$ __________
15204
Draina Structure Survey and Staking
AQ
Each
23
$ ________
$ __________
15710
Sediment Trap
AQ
Each
3
$ ________
$ __________
20301
Removal, Drainage Stuctures
AQ
Each
13
$ ________
$ __________
20407
Select Borrow, Compaction Method B, Finishing Method A
DQ
CY
60
$ ________
$ __________
20419
Drainage Excavation, Type Ditch
DQ
Foot
540
$ ________
$ __________
20420
Drainage Excavation, Type Reshape Catch Basin
AQ
Each
7
$ ________
$ __________
20426A
Grade dips, Type I
AQ
Each
10
$ ________
$ __________
20426B
Grade dips, Type II
AQ
Each
1
$ ________
$ __________
20459
Excavation
DQ
CY
100
$ ________
$ __________
25101
Placed Riprap, Class 2
DQ
CY
44
$ ________
$ __________
25158
Catchbasin Riprap, Class 1
AQ
Each
29
$ ________
$ __________
30307
Road reconditioning, scarify 6 inch depth
DQ
Mile
7.06
$ ________
$ __________
32111
Aggregate base, grading F-SR, with 2% Bentonite compaction method B
AQ
Ton
12520
$ ________
$ __________
60201A
18 in pipe culvert
AQ
LF
748
$ ________
$ __________
60201B
48 in pipe culvert
AQ
LF
48
$ ________
$ __________
60202A
28 inch span, 20 inch rise
AQ
LF
32
$ ________
$ __________
60202B
35 inch span, 24 inch rise
AQ
LF
34
$ ________
$ __________
60708
Clean Culvert
AQ
Each
8
$ ________
$ __________
61910
Replace Cattleguard Wing
AQ
Each
3
$ ________
$ __________
61950
Clean Cattleguard
AQ
Each
4
$ ________
$ __________
62201A
Rental Equipment, Hydraulic Excavator
AQ
Hour
40
$ ________
$ __________
62201B
Rental Equipment, Dump Truck
AQ
Hour
40
$ ________
$ __________
62527
Seeding, Fertilizing and Mulching, Dry Method
DQ
Acre
2
$ ________
$ __________
63390A
Install Stop Sign, (includes post)
AQ
Each
2
$ ________
$ __________
63390B
Install ARRA Sign, (includes posts)
AQ
Each
1
$ ________
$ __________
66050
Cross Drain Type Timber
AQ
LF
220
$ ________
$ __________

Total Cost

ITEM
DESCRIPTION
Method of Measure
Units
Quantities
Unit Cost
Total Cost

OPTION ITEM #1

32111
Aggregate base, grading F-SR, with 2% Bentonite compaction method B
AQ
Ton
940
$ ________
$ __________

OPTION ITEM #2

$ ________
$ __________
30307
Road reconditioning, scarify 6 inch depth
DQ
Mile
2.09
$ ________
$ __________
32111
Aggregate base, grading F-SR, with 2% Bentonite compaction method B
AQ
Ton
3890
$ ________
$ __________

OPTION ITEM #3

$ ________
$ __________
30307
Road reconditioning, scarify 6 inch depth
DQ
Mile
2.84
$ ________
$ __________
32111
Aggregate base, grading F-SR, with 2% Bentonite compaction method B
AQ
Ton
6030
$ ________
$ __________

Option Items Total Cost

BASIS OF AWARD: One contract will be awarded to the responsive and responsible bidder offering the best value to the Government. The Bidder must bid on all items. Only unit prices to the nearest whole dollar will be accepted. Where extended unit prices do not agree with totals or subtotals shown by the Bidder, the unit price governs.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed Price Construction Contracts, shall not be in addition to the contract price. Include your bond payments under Mobilization.

DUNS # _________________________

TINS # __________________________

Email Address: ___________________________

File details come from the government source that posted it. Updated .