RECOVERY Backhoe Services for the Rio Grande National Forest
Solicitation number
AG-82B1-S-10-0072
Issued by

About this file

Backhoe Services for the Rio Grande National Forest

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-82B1-S-10-0072

Backhoe Services for the Rio Grande N.F.

INTERMOUNTAIN ECONOMIC RECOVERY OPERATION CENTER INSTRUCTIONS

issuing office:

U.S. Department of Agriculture

Forest Service

Intermountain EROC 740 Simms Street Golden, CO 80401

FAX (303) 275-5299

solicitation no. RFQ AG-82B1-S-10-0072 offers are solicited for: Recovery - Backhoe Services for the Rio Grande National Forest important – notice to quoter:

AT A MINIMUM, QUOTER SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR RESPONSE TO THIS SOLICITATION:

1.SF-1449 Request For Quotation (Complete, date, and sign)

2.Section I – Schedule of Items (Pages 4-7) (Complete Unit Price and Amount)

3.Experience Questionnaire (Pages 44-45)

4.Representations and Certifications (Pages46-57). (Complete the Representations and Certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov) IT IS REQUIRED YOU WRITE THE SOLICITATION NUMBER ON THE OUTSIDE OF YOUR ENVELOPE.

Return to:

USDA, Forest Service

Intermountain EROC

740 Simms Street

Golden, CO 80401 IT IS REQUIRED THAT ALL CONTRACTOR’S BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION DATABASE PRIOR TO AWARD UNDER THIS SOLICITATION. SEE CLAUSe 52.205-7 Central contractor registration FOR DETAILS ON HOW TO APPLY.

it is the offerors responsibility to watch for any and all amendments to the solicitation, which shall be issued electronically through fedbizops.

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

350994

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

AG-82B1-S-10-0072

6. SOLICITATION ISSUE DATE

02/05/10

7. FOR SOLICITATION

INFORMATION CALL

a. NAME

Judy Martin

b. TELEPHONE NUMBER (No collect calls)

(208) 557-5841

8. OFFER DUE DATE/LOCAL TIME

02/19/10 3:00 p.m. MST

9. ISSUED BY

CODE

10. THIS ACQUISITION IS:

USDA, Forest Service Intermountain EROC

740 Simms Street

Golden, CO 80401

FORMCHECKBOX

UNRESTRICTED or FORMCHECKBOX

SET ASIDE: 100 % FOR

FORMCHECKBOX

Small Business FORMCHECKBOX Emerging Small Business

FORMCHECKBOX

Hubzone Small Business FORMCHECKBOX 8(A)

FORMCHECKBOX

Service-Disabled Veteran Owned Small Business

NAICS:

115310 SIZE STANDARD: $7.0 Million

FORMCHECKBOX

13a. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

13b. RATING

11. Delivery for FOB Destination unless Block is Marked

FORMCHECKBOX

See Schedule

12. Discount Terms

14. METHOD OF SOLICITATION

FORMCHECKBOX

RFQ FORMCHECKBOX

IFB FORMCHECKBOX

RFP

16. ADMINISTERED BY

15. DELIVER TO

See Delivery Schedule Same as Block 9

17a. CONTRACTOR/

OFFEROR

FACILITY

18a. PAYMENT WILL BE MADE BY

TELEPHONE NO.:_____________________________________

DUNS NO:_____________________ TIN No. ___________________________ U.S. Dept. of Agriculture National Finance Center

P.O. Box 60000

New Orleans, LA 70160-0001

FORMCHECKBOX

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

FORMCHECKBOX

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

RECOVERY - BACKHOE SERVICES ON THE RIO GRANDE N.F., Saguache, Divide, & Conejos Peak Ranger Districts, Rio Grande National Forest Faxed quotes will be accepted.

PLEASE PLACE YOUR QUOTE IN SECTION I- SCHEDULE OF ITEMS

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

FORMCHECKBOX

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA FORMCHECKBOX

ARE FORMCHECKBOX

ARE NOT ATTACHED.

FORMCHECKBOX

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA FORMCHECKBOX

ARE FORMCHECKBOX

ARE NOT ATTACHED.

28. FORMCHECKBOX

CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _____ COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. FORMCHECKBOX

AWARD OF CONTRACT: REF. ___________________ OFFER DATED _________________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT)

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT)

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

STANDARD FORM 1449 (REV. 3/2005)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

FORMCHECKBOX

RECEIVED FORMCHECKBOX

INSPECTED FORMCHECKBOX

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ___________________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER
34. VOUCHER NUMBER
35. AMOUNT VERIFIED CORRECT FOR
36. PAYMENT

FORMCHECKBOX

COMPLETE FORMCHECKBOX

PARTIAL FORMCHECKBOX

FINAL

37. CHECK NUMBER

PARTIAL

FINAL

38. S/R ACCOUNT NUMBER
39. S/R VOUCHER NUMBER
40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERIFYING OFFICER
41c. DATE

42.b. RECEIVED AT (Location)

42.c DATE REC’D (YY/MM/DD)
42d. TOTAL CONTAINERS

Standard Form 1449 (REV. 3/2005) Back

SECTION I--SUPPLIES OR SERVICES AND PRICES

BACKHOE SERVICES FOR THE RIO GRANDE NATIONAL FOREST

Saguache, Divide, and Conejos Peak Ranger Districts Rio Grande National Forest Saguache, Mineral, Rio Grande, Hinsdale, Conejos, and Archuleta Counties, Colorado I- 1 – Schedule of Items Item 1 – Backhoe Services on the Saguache Ranger District

Sub-Item No.
Description
Unit of Issue
Estimated Quantity
Unit Price Per Hour
Total Amount
1.1
Buffalo Pass Campground
HR
79
$__________
$_____________
1.2
Luders Campground
HR
40
$__________
$_____________
1.3
Stone Cellar Campground
HR
25
$__________
$_____________
1.4
Poso Group Area
HR
8
$__________
$_____________
1.5
Big Springs Picnic Area
HR
24
$__________
$_____________
1.6
North Crestone Trailhead
HR
16
$__________
$_____________
1.7
Middle Creek Trailhead
HR
8
$__________
$_____________
1.8
Major Creek Trailhead
HR
8
$__________
$_____________
TOTAL QUOTE FOR ITEM 1
$_____________

Item 2 – Backhoe Services on the Divide Ranger District

Sub-Item No.
Description
Unit of Issue
Estimated Quantity
Unit Price Per Hour
Total Amount
2.1
Ivey Creek Campground
HR
15
$__________
$_____________
2.2
Rock Creek Campground
HR
16
$__________
$_____________
2.3
Rock Creek Picnic Area
HR
6
$__________
$_____________
2.4
Comstock Campground
HR
7
$__________
$_____________
2.5
Lost Trail Campground
HR
26
$__________
$_____________
2.6
Rio Grande Campground
HR
8
$__________
$_____________
2.7
Road Canyon Campground
HR
8
$__________
$_____________
2.8
Marshall Park Campground
HR
30
$__________
$_____________
2.9
River Hill Campground
HR
35
$__________
$_____________
2.10
Thirty Mile Campground
HR
66
$__________
$_____________
2.11
North Clear Creek Campground
HR
46
$__________
$_____________
2.12
Silver Thread Campground
HR
22
$__________
$_____________
2.13
Lower Beaver Creek Campground
HR
39
$__________
$_____________
2.14
Park Creek Campground
HR
26
$__________
$_____________
2.15
Tucker Ponds Campground
HR
28
$__________
$_____________
2.16
Cathedral Campground
HR
51
$__________
$_____________
2.17
Highway Springs Campground
HR
31
$__________
$_____________
2.18
Shallow Creek Trailhead
HR
4
$__________
$_____________
2.19
Deep Creek Trailhead
HR
6
$__________
$_____________
Sub-Item No.
Description
Unit of Issue
Estimated Quantity
Unit Price Per Hour
Total Amount
2.20
Comstock Trailhead
HR
8
$__________
$_____________
TOTAL QUOTE FOR ITEM 2
$_____________

Item 3 – Backhoe Services on the Conejos Peak Ranger District

Sub-Item No.
Description
Unit of Issue
Estimated Quantity
Unit Price Per Hour
Total Amount
3.1
Trujillo Meadows Campground
HR
102
$__________
$_____________
3.2
Mogote Campground
HR
82
$__________
$_____________
3.3
Mix Lake Campground & Picnic Area
HR
46
$__________
$_____________
3.4
Stunner Campground
HR
20
$__________
$_____________
3.5
Alamosa River Campground
HR
20
$__________
$_____________
3.6
Chama Basin Trailhead
HR
2
$__________
$_____________
3.7
Red Lake Trailhead
HR
2
$__________
$_____________
3.8
Three Forks Trailhead
HR
2
$__________
$_____________
3.9
Lower South Fork Trailhead
HR
2
$__________
$_____________
TOTAL QUOTE FOR ITEM 3
$_____________

I- 2 - Quoters may quote on one or more Items. Quoter’s shall quote on all sub-items within an Item. Only quotes to the nearest cent will be accepted.

NOTE: Costs for intial move in and out, as well as moves between job locations, are considered incidental to the ordered work; therefore, the Contractor must consider this expense in their unit pricing.

The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.

Award will be based on price and experience/past performance. Quoter’s are to fill out and submit the Experience Questionnaire in Section J with their quote. It is the vendor’s responsibility to submit the information requested by the agency for evaluation purposes, and a vendor that does not do so runs the risk that its quotation will be rejected as unacceptable.

I- 3 – AGAR 452.216-74 Ceiling Price The Ceiling Price of this contract is $77,000. The Contractor shall not make expenditures or incur obligations in the performance of this contract which exceed the ceiling price specified herein, except at the Contractor’s own risk.

SECTION II - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

II- 1 – Scope of Work This project consists of hourly backhoe work which will occur at various campgrounds and trailheads through-out the Rio Grande National Forest in Colorado. Primary work will include, but is not limited to, removal of identified site fixtures such as picnic tables, fire rings, barriers (log/concrete), site markers, fee tubes, and entrance signing, disposal of material into an on-site dumpster, ground leveling, extending and widening campsite spurs, spreading and leveling gravel, and the placement of barriers and rocks.

II- 2 – Project Location and Period of Performance All work shall be completed within the established dates. On sight work shall occur during day light hours on weekdays only, unless prior arrangements are made with the COR.

Saguache Ranger District

Location
Directions
Period of Performance
Buffalo Peak Campground
From Saguache, CO, at intersection of State Rt. 114 and US Rt. 285, take Rt. 114 west 26.7 miles to campground sign. Turn left at sign onto a single lane dirt road and go 0.6 miles to the campground.
May 24 – June 4, 2010
Luders Campground
From Saguache, drive 21 miles northwest on State Highway 114, then turn left onto County Road NN14 and proceed about 8 miles west to the campground.
June 14 – June 18, 2010
Stone Cellar Campground
From Saguache, travel northwest on State Highway 114 for 35.5 miles. Turn left on County Road 17GG (Forest Road 804) and go about 4 miles to the junction of County Road NN14 (Forest Road 750). Turn left again and travel about a mile to the junction of NN14 and County Road 17FF (Forest Road 787). Turn right onto 787 and follow this road to the campground--about another 12 miles.
July 12 – July 18, 2010
Poso Group Area
From Saguache, CO, take US Rt. 285 south 15.6 miles to La Garita and County Rt. G signs. Turn right at signs onto Rt. G and go 6.3 miles to "Y" intersection (County Rt. 41G). Bear right onto Rt. 41G and go 10.2 miles to another "Y" intersection (Forest Rt. 675). Bear left onto Rt. 675 (single lane with turnouts) and go 1.7 miles to campground sign. Turn left at sign into campground.
July 21 – July 23, 2010
Big Springs Picnic Area
From Saguache travel 16.5 miles west on Highway 114. Then travel 2.7 miles on south on Cty Rd 41G. Turn south on Forest Road 790 and travel 2 miles to Big Springs.
June 21 – June 25, 2010
N. Crestone Trailhead
Take Highway 17 to Moffat and follow the Crestone Road eastward and through Crestone to North Crestone Campground. The trail begins at the end of the road at the east end of the campground. The trail is closed to motorized traffic.
July 26 – August 30, 2010
Middle Creek Trailhead
From Saguache, CO, at intersection of State Rt. 114 and US Rt. 285, take Rt. 114 west aproximately 10 miles to Forest Road 870. Turn north on Forest Road 870 and travel aproximately 9 miles to Middle Creek Trailhead
July 26 – August 30, 2010
Major Creek Trailhead
Take the Valley View Road east from the junction of Highways 17 and 285, go approximately 8 ½ miles. Major Creek Canyon is directly east. A large house sits at the mouth of the canyon; however, a public access route is passable just to the north by staying on BLM land.
July 26 – August 30, 2010

Divide Ranger District

Location
Directions
Period of Performance
Ivey Creek Campground
From Creede, CO continue on Hwy 149 towards Lake City approximately 6.3 miles to FDR 523 (Middle Creek Rd) Turn left onto FDR 523 traveling approximately 4 miles to a "Y" junction, go left onto FDR 528 continue approximately 3 miles to a "T" intersection w/ FDR 526 (Ivy Creek Rd) and stay on this road approximately 3 miles to the campground entrance on the left.
June 26 – July 7, 2010 as needed
Rock Creek Campground
In Monte Vista, CO, from the intersection of Hwy 160 and take State Rt. 15 south 2 miles to Rock Creek Campground/Forest Rt. 28 sign. Turn right onto Rt. 28 and go 2.5 miles to a "T" intersection (County Rt. 28). Turn left onto County Rt. 28 and go 12.1 miles to campground sign. Turn left at sign into campground.
July 12 – July 23, 2010 as needed
Rock Creek Picnic Area
In Monte Vista, CO, from the intersection of Hwy 160 and take State Rt. 15 south 2 miles to Rock Creek Campground/Forest Rt. 28 sign. Turn right onto Rt. 28 and go 2.5 miles to a "T" intersection (County Rt. 28). Turn left onto County Rt. 28 and go 12.2 miles to picnic area. Turn left at sign into campground.
July 12 – July 23, 2010 as needed
Comstock Campground
In Monte Vista, CO, from the intersection of Hwy 160 and take State Rt. 15 south 2 miles to Rock Creek Campground/Forest Rt. 28 sign. Turn right onto Rt. 28 and go 2.5 miles to a "T" intersection (County Rt. 28). Turn left onto County Rt. 28 and go 14.2 miles to campground. Turn left at sign into campground.
July 12 – July 30, 2010 as needed
Lost Trail Campground
From Creede, CO take Hwy 149 for approximately 18 miles to FDR 520 (Rio Grande Reservoir Rd), proceede on FDR 520 for approximately 17.5 miles to the campground on the left.
July 5 – July 14, 2010 as needed
Rio Grande Campground
From Creede, CO take Hwy 149 west headed towards Lake City for 7.8 miles to FDR 529 and into the Rio Grande Campground.
June 30 – July 9, 2010 as needed
Road Canyon Campground
From Creede, CO take Hwy 149 for approximately 18 miles to FDR 520 (Rio Grande Reservoir Rd), proceede on FDR 520 for approximately 5 miles to the campground on the left.
July 8 – July 16, 2010 as needed
Marshall Park Campground
From Creede, CO, take State Rt. 149 south (toward Lake City) 5.6 miles to Middle Creek Rd. sign. Turn left onto Middle Creek Rd. and go 0.4 miles to campground.
May 24 – June 4, 2010 as needed
River Hill Campground
From Creede, CO, take State Rt. 149 south (toward Lake City) 19.3 miles to Rio Grande Reservoir sign (Forest Rt. 520). Turn left at sign onto Rt. 520 and go 0.5 miles to "Y" intersection. Bear left, staying on Rt. 520, on dirt road and go 9.3 miles to campground sign. Turn left at sign and go 0.1 miles to campground entrance.
Aug. 23 – Sept. 14, 2010 as needed
Thirty Mile Campground
From Creede, CO, take State Rt. 149 south (toward Lake City) 19.3 miles to Rio Grande Reservoir sign (Forest Rt. 520). Turn left onto Rt. 520 and go 0.5 miles to a "Y" intersection. Bear left onto a dirt road, staying on Rt. 520, and go 10.8 miles to campground sign. Turn left into campground.
Aug. 30 – Oct. 4, 2010 as needed
North Clear Creek Campground
From Creede, CO, take State Rt. 149 south (toward Lake City) 21.6 miles to North Clear Creek Road sign (Forest Rt. 510). Turn right at sign onto Rt. 510 (gravel) and go 2.1 miles to campground sign. Turn right into campground.
June 14 – June 25, 2010 as needed
Silver Thread Campground
From Creede, CO, take State Rt. 149 south (toward Lake City) 23 miles to campground sign. Turn right at sign into campground.
June 21 – July 2, 2010 as needed
Lower Beaver Creek Campground
In South Fork, CO, at intersection of State Rt. 149 and US Rt. 160, take Rt. 160 west 1.4 miles to Beaver Creek Rd. sign. Turn left at sign onto Beaver Creek Rd. and go 3.1 miles to campground sign. Turn right at sign and go 0.1 miles to campground
May 31 – June 18, 2010 as needed
Park Creek Campground
From South Fork, CO, take US Rt. 160 west towards Wolf Creek Pass for approximately 7 miles to the Campground entrance on the left.
Aug. 9 – Aug. 20, 2010 as needed
Tucker Ponds Campground
In South Fork, CO, at intersection of State Rt. 149 and US Rt. 160, take Rt. 160 west 13.5 miles to campground sign (Forest Rt. 390). Turn left at sign onto Rt. 390
Aug. 2 – Aug. 13, 2010 as needed
Cathedral Campground
From South Fork, CO, take US Rt. 160 east 5.3 miles to Embargo Creek Rd. and County Rt. 18 signs. Turn left onto Rt. 18 and go 1.4 miles to a "T" intersection (County Rt. 15). Turn right onto Rt. 15 and go 0.3 miles to another "T" intersection (County Rt. 65). Turn left onto Rt. 65 and go 3.2 miles to "Y" intersection (Forest Rt. 640/650). Bear left onto Rt. 640 (dirt, single lane with no turnouts) and go 7.6 miles to campground sign. Turn right at sign into campground.
Aug. 13 – Sept. 3, 2010 as needed
Highway Springs Campground
In South Fork, CO, at intersection of State Rt. 149 and US Rt. 160, take Rt. 160 west 4.1 miles to campground sign. Turn left into campground.
July 26 – Aug. 6, 2010 as needed
Shallow Creek Trailhead
From Creede, CO travel west on Hwy 149 towards Lake City for approximately 3 miles, turn north on Cty Rd 507 for two miles, turn west on FDR 508 for 1/4 mile, just past the cattle guard go make a left, heading south and continue to the end of the road.
May 24 – Oct. 5, 2010 as needed
Deep Creek Trailhead
From South Fork, CO at the junction of Hwy 160 and Hwy 149 take Hwy 149 for approximately 18.4 miles to Deep Creek Road take a left onto Deep Creek Road and continue for approximately 2 miles to the Deep Creek Trailhead on the south side of the road.
May 24 – Oct. 5, 2010 as needed
Comstock Trailhead
In Monte Vista, CO, from the intersection of Hwy 160 and take State Rt. 15 south 2 miles to Rock Creek Campground/Forest Rt. 28 sign. Turn right onto Rt. 28 and go 2.5 miles to a "T" intersection (County Rt. 28). Turn left onto County Rt. 28 and go 14.2 miles to campground. Turn left at sign into campground.
July 19 – July 30, 2010 as needed

Conejos Peak Ranger District

Location
Directions
Period of Performance
Trujillo Meadows Campground
In Chama, NM, take State Rt. 17 north 13 miles to Trujillo Meadows Reservoir sign (in Colorado). Turn left at sign (dirt) and go 0.1 miles to a "T" intersection and campground sign (Forest Rt. 118). Turn right onto Rt. 118 and go 2.1 miles to campground on right. Alternate Route: From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight onto Rt. 17 and go 35.2 miles to Trujillo Meadows Reservoir sign. Turn right at sign (dirt) and go 0.1 miles to "T" intersection and campground sign (Forest Rt. 118). Turn right onto Rt. 118 and go 2.1 miles to campground on right.
July 5 – July 30, 2010 as needed
Mogote Campground
From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight on Rt. 17 and go 13.2 miles to campground sign. Turn left at sign and go 0.3 miles to campground on right.
Aug. 30 – Oct. 1, 2010 as needed
Mix Lake Campground & Picnic Area
From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight on Rt. 17 and go 21.9 miles to Platoro sign (Forest Rt. 250). Turn right at sign onto Rt. 250 (dirt) and go 23.4 miles to Mix Lake sign. Turn left at sign and go 0.6 miles to campground.
Aug. 2 – Aug. 20, 2010 as needed
Stunner Campground
In La Jara, CO, at intersection of State Rt. 285 and County Rt. 15, take Rt. 15 west 10.6 miles FDR 255 (Forest Rt. 255). Turn left onto Rt. 255 (dirt) and go 11.4 miles to intersection with Forest Rt. 250. Continue straight on Rt. 250 and go 18.4 miles to "Y" intersection (Forest Rt. 380). Bear right at intersection onto Rt. 380 and go 0.4 miles to campground sign. Turn left at sign and go 0.3 miles to campground.
July 27 – Aug. 6, 2010 as needed
Alamosa River Campground
In La Jara, CO, at intersection of State Rt. 285 and County Rt. 15, take Rt. 15 west 10.6 miles to FDR 255 (Forest Rt. 255). Turn left onto Rt. 255 (dirt) and go 11.4 miles to intersection with Forest Rt. 250. Continue straight on Rt. 250 and go 3.3 miles to campground sign. Turn left at sign into campground.
June 27 – Aug. 6, 2010 as needed
Chama Basin Trailhead
From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight on Rt. 17 up cumbres pass and across the Colorado/New Mexico State Line into New Mexico. Continue towards Chama, NM on US Hwy 17 approximately 3.5 miles til you get to FSR 121. Turn right on Forest Service Road 121 through the Rancho de Oso Pardo Ranch on FSR 121. Continue approx. 3 miles to the CO/NM state line back into Colorado on FSR 121 and continue approximately 2 miles to Chama Basin Trail Head on Left on FSR 122. Trail Head is down by Rio Chama River next to livestock corrals. Do Not continue on FSR 121 as it dead ends.
August 9, 2010 to August 20, 2010 as needed
Red Lake Trailhead
Follow Highway 17 to its junction with Forest Road #114, one-half mile south of the summit of La Manga Pass. Follow Road#114 approximately 3 miles to the trail head.
August 9, 2010 to August 20, 2010 as needed
Three Forks Trailhead
From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight on Rt. 17 and go 21.9 miles to Platoro sign in Horca, CO. (Forest Rt. 250). Turn right at sign on FSR250. Continue approximately 20 miles on FSR 250 to town of Platoro. Continue on FSR 250 past Platoro until you get to intersection of FSR250, FSR247. Continue approximately 5 miles on FSR 247 to Three Forks Trail Head which is at the end of FSR 247. FSR 247 runs along Platoro Reservoir for about 3 miles.
August 9, 2010 to August 20, 2010 as needed
Lower Southfork Trailhead
From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight on Rt. 17 and go 21.9 miles to Platoro sign (Forest Rt. 250). Turn right at sign. Continue on Forest Service Road 250 approximately 10.5 miles on FSR 250 until you see South Fork Trailhead sign. Trailhead parking area on left.
August 9, 2010 to August 20, 2010 as needed

II- 3 – Government-Furnished Property The Government will provide the following items of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract. The following items will be government furnished:

20 to 30 yard Dumpster

Class 6 Gravel ¾” Minus

Barrier Material

II- 4 - Repair of Equipment Contractor shall provide quality equipment capable of safely performing the work under the terms of the contract. All repairs are the sole responsibility of the Contractor. Repairs shall be made promptly and equipment returned to use within 48 hours. In lieu of repairing equipment, the Contractor may furnish similar replacement equipment within the time specified.

II- 5 - Pollution and Erosion Control During all operations under this contract, the Contractor shall exercise reasonable measures to direct surface runoff water to stabilized waterways and to keep the drainage systems functioning effectively to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes from the Contractor's operations, including camps, parking areas, and equipment maintenance areas shall be stored and collected in a sanitary manner and disposed of in a State-approved sanitary landfill.

Oil from crankcases or gear boxes, equipment waste or spilled or excess fuel shall be placed in containers and removed from the work site and disposed of as approved and required by Federal, State and Local laws.

Equipment ordered for operations in close proximity to streams or bodies of water will be required to meet more stringent requirements regarding seals and fittings that prevent the leaking of hydraulic fluids, lubricants and fuels. Failure to comply will result in immediate rejection of equipment. Fueling should occur at locations as far as practicable from open water or wet areas to prevent potential contamination.

II- 6 - Noxious Weed Control In order to prevent the potential spread of noxious weeds into work areas, Contractor shall be required to use weed-free equipment.

The following is considered proof of weed-free equipment:

The Contractor will be required to clean all equipment prior to entry on to the work area. This cleaning shall remove all dirt and plant parts and material that could carry noxious weed seeds into the work area. Only equipment so cleaned and inspected by the Forest Service will be allowed to operate within the work area. All subsequent move-ins of equipment shall be treated in the same manner as initial move-in. "Equipment" does not include pickup trucks and personal vehicles.

Failure to provide clean equipment may result in the rejection of equipment. The Contractor shall make all equipment available for inspection by the Forest Service at an agreed upon location. The Contractor shall give the Forest Service at least 24 hours advance notification when equipment is ready for inspection.

II- 7 – Safety

Contractors shall comply with OSHA regulations and provide employees a work environment that is sanitary and not hazardous, which includes providing personal protective equipment. Contractors must maintain a health and safety plan and an accident prevention program, which includes frequent and regular inspections of the project site, materials and equipment. Contractors are responsible for risk management regarding contractor/employee and public safety, which include experience of operator to handle road and terrain conditions, getting to the worksite, traffic control and coordination with other users.

II- 8 – Maintenance of Traffic and Use of Warning Devicies The Contractor shall provide signs, other devices, and traffic control for occupied work areas in accordance with National standards as contained in Part VI of the Manual of Uniform Traffic Control Devices (MUTCD), 2003 edition, and these specifications. All signs and devices remain the property and responsibility of the Contractor.

(a) - Traffic Conditions

(1) - Roads shall be open to traffic unless otherwise approved in writing by the COR.

(b) - Devices

(1) - Required signs can be mounted on portable or temporary mountings. Standard MUTCD legends shall be used.

(2) - Traffic approaching the work area from either direction and side approaches shall be warned by signing.

(3) - Signs will, at all times, be within one mile of the operating equipment or personnel, unless otherwise approved in writing by the COR.

(4) - Hazards incidental to the work within or on the traveled way, shoulders, or turnouts shall be marked with hazard identification, illuminated beacons, an other MUTCD devices to safely guide road users through the area. Work shall be scheduled to provide for completion of segments on a daily basis.

(5) - Advisory speed plates may be used to control traffic through the work area.

(c) - Equipment

(1) - All vehicles and machinery operating on or from the traveled way or road shoulder shall have flashing amber lights or rotary beacons operated continuously while work is in progress.

(2) - Vehicles and machinery not currently used in the maintenance operation shall be parked off the traveled way at approved locations to minimize interference with the normal use of the road.

(3) - Use of motorized equipment other than hand held equipment such as power saws and brushcutters will not be permitted off designated roads in the project area without approval of the Contracting Officer's Representative.

II- 9 - Inspection Requirements

The Government will have a representative on site during work to identify work required and provide guidance and inspections of the work to assure proper oversight and contract compliance.

When inspection indicates that the performance objectives were not met, the work will be deemed unsatisfactory and payment will not be made until the Contractor has assured the Government that it has corrected the deficiencies. Inspections after rework will be made in the same manner as the first inspection.

SECTION III - CONTRACT CLAUSES

III- 1 - FAR 52.212-4 Contract Terms and Conditions - Commercial Items (MAR 2009)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights --

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C.3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613). Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include --

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, contract line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration, or 52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor Registration), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt Payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected contract line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in Section 611 of the Contract Disputes Act of 1978 (Public Law 95-563), which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period at fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. 3701, et seq., Contract Work Hours and Safety Standards Act; 41 U.S.C. 51-58, Anti-Kickback Act of 1986; 41 U.S.C. 265 and 10 U.S.C. 2409 relating to whistleblower protections; Section 1553 of the American Recovery and Reinvestment Act of 2009 relating to whistleblower protections for contracts funded under that Act; 49 U.S.C. 40118, Fly American; and 41 U.S.C. 423 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, and Compliance with Laws Unique to Government Contracts paragraphs of this clause.

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments.

(9) The specification.

(t) Central Contractor Registration (CCR).

(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(2)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the CCR database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.

FAR 52.212-4 Addendum to - Contract Terms

III- 2 - FAR 52.215-2 Audit and Records—Negotiation (MAR 2009) ALT I (MAR 2009)

(a) As used in this clause, “records” includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form.

(b) Examination of costs. If this is a cost-reimbursement, incentive, time-and-materials, labor-hour, or price redeterminable contract, or any combination of these, the Contractor shall maintain and the Contracting Officer, or an authorized representative of the Contracting Officer, shall have the right to examine and audit all records and other evidence sufficient to reflect properly all costs claimed to have been incurred or anticipated to be incurred directly or indirectly in performance of this contract. This right of examination shall include inspection at all reasonable times of the Contractor’s plants, or parts of them, engaged in performing the contract.

(c) Cost or pricing data. If the Contractor has been required to submit cost or pricing data in connection with any pricing action relating to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the cost or pricing data, shall have the right to examine and audit all of the Contractor’s records, including computations and projections, related to—

(1) The proposal for the contract, subcontract, or modification;

(2) The discussions conducted on the proposal(s), including those related to negotiating;

(3) Pricing of the contract, subcontract, or modification; or

(4) Performance of the contract, subcontract or modification.

(d) Comptroller General or Inspector General.

(1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials, shall have access to and the right to—

(i) Examine any of the Contractor’s or any subcontractor’s records that pertain to and involve transactions relating to this contract or a subcontract hereunder; and

(ii) Interview any officer or employee regarding such transactions.

(2) This paragraph may not be construed to require the Contractor or subcontractor to create or maintain any record that the Contractor or subcontractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) Reports. If the Contractor is required to furnish cost, funding, or performance reports, the Contracting Officer or an authorized representative of the Contracting Officer shall have the right to examine and audit the supporting records and materials, for the purpose of evaluating—

(1) The effectiveness of the Contractor’s policies and procedures to produce data compatible with the objectives of these reports; and

(2) The data reported.

(f) Availability. The Contractor shall make available at its office at all reasonable times the records, materials, and other evidence described in paragraphs (a), (b), (c), (d), and (e) of this clause, for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in Subpart 4.7, Contractor Records Retention, of the Federal Acquisition Regulation (FAR), or for any longer period required by statute or by other clauses of this contract. In addition—

(1) If this contract is completely or partially terminated, the Contractor shall make available the records relating to the work terminated until 3 years after any resulting final termination settlement; and

(2) The Contractor shall make available records relating to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to this contract until such appeals, litigation, or claims are finally resolved.

(g) (1) Except as provided in paragraph (g)(2) of this clause, the Contractor shall insert a clause containing all the terms of this clause, including this paragraph (g), in all subcontracts under this contract. The clause may be altered only as necessary to identify properly the contracting parties and the Contracting Officer under the Government prime contract.

(2) The…