Solicitation_0053.doc
DOC document 388 KB Posted
- Solicitation number
- AG-82B1-S-10-0053
About this file
RECOVERY-COMMERCIAL GRAVEL FOR THE RIO GRANDE NATIONAL FOREST
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-82B1-S-10-0053
Commercial Gravel
INTERMOUNTAIN ECONOMIC RECOVERY OPERATION CENTER INSTRUCTION SHEET
issuing office:
U.S. Department of Agriculture
Forest Service
Intermountain EROC 740 Simms Street Golden, CO 80401
FAX (303) 275-5299
solicitation no. RFQ AG-82B1-S-10-0053 offers are solicited for: RECOVERY – COMMERCIAL GRAVEL FOR THE RIO GRANDE N.F.
important – notice to quoter:
AT A MINIMUM, QUOTER SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR RESPONSE TO THIS SOLICITATION:
1.SF-1449 Request For Quotation (Complete, date, and sign)
2.Section I – Schedule of Items (Pages 4-6). (Complete Unit Price and Amount)
3.Representations and Certifications (Pages 26-38). (Complete the Representations and Certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov)
4. Amendments (If Applicable)
IT IS REQUIRED YOU WRITE THE SOLICITATION NUMBER ON THE OUTSIDE OF YOUR ENVELOPE.
Return to:
USDA, Forest Service
Intermountain EROC
Attn: George Jackson
740 Simms Street
Golden, CO 80401
IT IS REQUIRED THAT ALL CONTRACTOR’S BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION DATABASE PRIOR TO AWARD UNDER THIS SOLICITATION. SEE CLAUSe 52.205-7 Central contractor registration FOR DETAILS ON HOW TO APPLY.
it is the offerors responsibility to watch for any and all amendments to the solicitation, which shall be issued electronically through fedbizops.
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
349288
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
AG-82B1-S-10-0053
6. SOLICITATION ISSUE DATE
02/05/10
7. FOR SOLICITATION
INFORMATION CALL
a. NAME
Judy Martin
b. TELEPHONE NUMBER (No collect calls)
(208) 557-5841
8. OFFER DUE DATE/LOCAL TIME
02/19/10 3:00 p.m. MST
9. ISSUED BY
CODE
| 10. THIS ACQUISITION IS: |
USDA, Forest Service Intermountain EROC
740 Simms Street
Golden, CO 80401
FORMCHECKBOX
UNRESTRICTED or FORMCHECKBOX
SET ASIDE: 100 % FOR
FORMCHECKBOX
Small Business FORMCHECKBOX Emerging Small Business
FORMCHECKBOX
Hubzone Small Business FORMCHECKBOX 8(A)
FORMCHECKBOX
Service-Disabled Veteran Owned Small Business
NAICS:
212321 SIZE STANDARD: 500 Employees
FORMCHECKBOX
13a. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
13b. RATING
11. Delivery for FOB Destination unless Block is Marked
FORMCHECKBOX
See Schedule
12. Discount Terms
14. METHOD OF SOLICITATION
FORMCHECKBOX
RFQ FORMCHECKBOX
IFB FORMCHECKBOX
RFP
| 16. ADMINISTERED BY |
15. DELIVER TO
See Delivery Schedule Same as Block 9
17a. CONTRACTOR/
OFFEROR
FACILITY
| 18a. PAYMENT WILL BE MADE BY |
TELEPHONE NO.:_____________________________________
DUNS NO:_____________________ TIN No. ___________________________ U.S. Dept. of Agriculture National Finance Center
P.O. Box 60000
New Orleans, LA 70160-0001
FORMCHECKBOX
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
FORMCHECKBOX
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
RECOVERY – COMMERCIAL GRAVEL, Rio Grande National Forest Faxes will be accepted.
PLEASE PLACE YOUR QUOTE IN SECTION I- SCHEDULE OF ITEMS
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
FORMCHECKBOX
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA FORMCHECKBOX
ARE FORMCHECKBOX
ARE NOT ATTACHED.
FORMCHECKBOX
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA FORMCHECKBOX
ARE FORMCHECKBOX
ARE NOT ATTACHED.
28. FORMCHECKBOX
CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _____ COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. FORMCHECKBOX
AWARD OF CONTRACT: REF. ___________________ OFFER DATED _________________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT)
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
STANDARD FORM 1449 (REV. 3/2005)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
FORMCHECKBOX
RECEIVED FORMCHECKBOX
INSPECTED FORMCHECKBOX
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ___________________________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
| 32c. DATE |
| 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
| 32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
| 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE |
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
| 33. SHIP NUMBER |
| 34. VOUCHER NUMBER |
| 35. AMOUNT VERIFIED CORRECT FOR |
| 36. PAYMENT |
FORMCHECKBOX
COMPLETE FORMCHECKBOX
PARTIAL FORMCHECKBOX
FINAL
37. CHECK NUMBER
PARTIAL
FINAL
| 38. S/R ACCOUNT NUMBER |
| 39. S/R VOUCHER NUMBER |
| 40. PAID BY |
| 41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT |
| 42a. RECEIVED BY (Print) |
| 41b. SIGNATURE AND TITLE OF CERIFYING OFFICER |
| 41c. DATE |
42.b. RECEIVED AT (Location)
| 42.c DATE REC’D (YY/MM/DD) |
| 42d. TOTAL CONTAINERS |
Standard Form 1449 (REV. 3/2005) Back
SECTION I--SUPPLIES OR SERVICES AND PRICES
COMMERCIAL GRAVEL
Rio Grande National Forest
Saguache, Divide, and Conejos Peak Ranger District Saguache, Mineral, Rio Grande, Hinsdale, Conejos, and Archuleta Counties, Colorado
I- 1- Schedule of Items Item 1 – Gravel for the Saguache Ranger District
| Sub-Item No. |
| Description |
| Unit of Issue |
| Estimated Quantity |
| Unit Price Per Hour |
| Total Amount |
| 1.1 |
| Buffalo Pass Campground |
| C.Y. |
| 174 |
| $__________ |
| $_____________ |
| 1.2 |
| Luders Campground |
| C.Y. |
| 72 |
| $__________ |
| $_____________ |
| 1.3 |
| Stone Cellar Campground |
| C.Y. |
| 102 |
| $__________ |
| $_____________ |
| 1.4 |
| Poso Group Area |
| C.Y. |
| 36 |
| $__________ |
| $_____________ |
| 1.5 |
| Big Springs Picnic Area |
| C.Y. |
| 75 |
| $__________ |
| $_____________ |
| 1.6 |
| North Crestone Trailhead |
| C.Y. |
| 96 |
| $__________ |
| $_____________ |
| 1.7 |
| Middle Creek Trailhead |
| C.Y. |
| 60 |
| $__________ |
| $_____________ |
| 1.8 |
| Major Creek Trailhead |
| C.Y. |
| 60 |
| $__________ |
| $_____________ |
| TOTAL QUOTE FOR ITEM 1 |
| $_____________ |
Item 2 – Gravel for the Divide Ranger District
| Sub-Item No. |
| Description |
| Unit of Issue |
| Estimated Quantity |
| Unit Price Per Hour |
| Total Amount |
| 2.1 |
| Ivey Creek Campground |
| C.Y. |
| 55 |
| $__________ |
| $_____________ |
| 2.2 |
| Rock Creek Campground |
| C.Y. |
| 100 |
| $__________ |
| $_____________ |
| 2.3 |
| Rock Creek Picnic Area |
| C.Y. |
| 20 |
| $__________ |
| $_____________ |
| 2.4 |
| Comstock Campground |
| C.Y. |
| 60 |
| $__________ |
| $_____________ |
| 2.5 |
| Lost Trail Campground |
| C.Y. |
| 72 |
| $__________ |
| $_____________ |
| 2.6 |
| Rio Grande Campground |
| C.Y. |
| 102 |
| $__________ |
| $_____________ |
| 2.7 |
| Road Canyon Campground |
| C.Y. |
| 75 |
| $__________ |
| $_____________ |
| 2.8 |
| Marshall Park Campground |
| C.Y. |
| 160 |
| $__________ |
| $_____________ |
| 2.9 |
| River Hill Campground |
| C.Y. |
| 183 |
| $__________ |
| $_____________ |
| 2.10 |
| Thirty Mile Campground |
| C.Y. |
| 341 |
| $__________ |
| $_____________ |
| 2.11 |
| North Clear Creek Campground |
| C.Y. |
| 220 |
| $__________ |
| $_____________ |
| 2.12 |
| Silver Thread Campground |
| C.Y. |
| 110 |
| $__________ |
| $_____________ |
| 2.13 |
| Lower Beaver Creek Campground |
| C.Y. |
| 221 |
| $__________ |
| $_____________ |
| 2.14 |
| Park Creek Campground |
| C.Y. |
| 140 |
| $__________ |
| $_____________ |
| 2.15 |
| Tucker Ponds Campground |
| C.Y. |
| 140 |
| $__________ |
| $_____________ |
| 2.16 |
| Cathedral Campground |
| C.Y. |
| 200 |
| $__________ |
| $_____________ |
| 2.17 |
| Highway Springs Campground |
| C.Y. |
| 196 |
| $__________ |
| $_____________ |
| 2.18 |
| Shallow Creek Trailhead |
| C.Y. |
| 15 |
| $__________ |
| $_____________ |
| 2.19 |
| Deep Creek Trailhead |
| C.Y. |
| 10 |
| $__________ |
| $_____________ |
| Sub-Item No. |
| Description |
| Unit of Issue |
| Estimated Quantity |
| Unit Price Per Hour |
| Total Amount |
| 2.20 |
| Comstock Trailhead |
| C.Y. |
| 5 |
| $__________ |
| $_____________ |
| TOTAL QUOTE FOR ITEM 2 |
| $_____________ |
Item 3 – Gravel for the Conejos Peak Ranger District
| Sub-Item No. |
| Description |
| Unit of Issue |
| Estimated Quantity |
| Unit Price Per Hour |
| Total Amount |
| 3.1 |
| Trujillo Meadows Campground |
| C.Y. |
| 255 |
| $__________ |
| $_____________ |
| 3.2 |
| Mogote Campground |
| C.Y. |
| 205 |
| $__________ |
| $_____________ |
| 3.3 |
| Mix Lake Campground & Picnic Area |
| C.Y. |
| 120 |
| $__________ |
| $_____________ |
| 3.4 |
| Stunner Campground |
| C.Y. |
| 60 |
| $__________ |
| $_____________ |
| 3.5 |
| Alamosa River Campground |
| C.Y. |
| 60 |
| $__________ |
| $_____________ |
| 3.6 |
| Chama Basin Trailhead |
| C.Y. |
| 50 |
| $__________ |
| $_____________ |
| 3.7 |
| Red Lake Trailhead |
| C.Y. |
| 50 |
| $__________ |
| $_____________ |
| 3.8 |
| Three Forks Trailhead |
| C.Y. |
| 50 |
| $__________ |
| $_____________ |
| 3.9 |
| Lower South Fork Trailhead |
| C.Y. |
| 50 |
| $__________ |
| $_____________ |
| TOTAL QUOTE FOR ITEM 3 |
| $_____________ |
I- 2: Vendor’s may quote on one or more Item(s). Vendor’s shall quote on all sub-items within an Item. Only quotes to the nearest cent will be accepted. Vendors shall include the cost of delivery in the Cubic Yard price quoted. No separate delivery/shipping charges will be paid. Award will be based on price and price related factors alone.
The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices quoted, unless the quoter specifies otherwise in the quote.
The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.
SECTION II - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
II- 1 – Scope of Work This project consists of the supply and delivery of Class 6, ¾”minus gravel. Vendor shall deliver gravel to specific designated locations within various campgrounds and trailheads through-out the Rio Grande National Forest in Colorado. Gravel loads to each recreation site may be distributed to individual campsites and picnic sites. Portions of a load may be divided between individual sites.
II- 2 – Project Location and Period of Performance All work shall be completed within the established dates below. The Government will provide the vendor 24 hour notice for site delivery.
Saguache Ranger District
| Location |
| Directions |
| Period of Performance |
| Buffalo Peak Campground |
| From Saguache, CO, at intersection of State Rt. 114 and US Rt. 285, take Rt. 114 west 26.7 miles to campground sign. Turn left at sign onto a single lane dirt road and go 0.6 miles to the campground. |
| May 31 to June 18 as needed |
| Luders Campground |
| From Saguache, drive 21 miles northwest on State Highway 114, then turn left onto County Road NN14 and proceed about 8 miles west to the campground. |
| June 14 to June 25 as needed |
| Stone Cellar Campground |
| From Saguache, travel northwest on State Highway 114 for 35.5 miles. Turn left on County Road 17GG (Forest Road 804) and go about 4 miles to the junction of County Road NN14 (Forest Road 750). Turn left again and travel about a mile to the junction of NN14 and County Road 17FF (Forest Road 787). Turn right onto 787 and follow this road to the campground--about another 12 miles. |
| July 12 to July 23 as needed |
| Poso Group Area |
| From Saguache, CO, take US Rt. 285 south 15.6 miles to La Garita and County Rt. G signs. Turn right at signs onto Rt. G and go 6.3 miles to "Y" intersection (County Rt. 41G). Bear right onto Rt. 41G and go 10.2 miles to another "Y" intersection (Forest Rt. 675). Bear left onto Rt. 675 (single lane with turnouts) and go 1.7 miles to campground sign. Turn left at sign into campground. |
| July 26 to July 30 as needed |
| Big Springs Picnic Area |
| From Saguache travel 16.5 miles west on Highway 114. Then travel 2.7 miles on south on Cty Rd 41G. Turn south on Forest Road 790 and travel 2 miles to Big Springs. |
| June 21 to July 2 as needed |
| N. Crestone Trailhead |
| Take Highway 17 to Moffat and follow the Crestone Road eastward and through Crestone to North Crestone Campground. The trail begins at the end of the road at the east end of the campground. The trail is closed to motorized traffic. |
| July 26 to Aug 6 as needed |
| Middle Creek Trailhead |
| From Saguache, CO, at intersection of State Rt. 114 and US Rt. 285, take Rt. 114 west aproximately 10 miles to Forest Road 870. Turn north on Forest Road 870 and travel aproximately 9 miles to Middle Creek Trailhead |
| July 26 to Aug 6 as needed |
| Major Creek Trailhead |
| Take the Valley View Road east from the junction of Highways 17 and 285, go approximately 8 ½ miles. Major Creek Canyon is directly east. A large house sits at the mouth of the canyon; however, a public access route is passable just to the north by staying on BLM land. |
| July 26 to Aug 6 as needed |
Divide Ranger District
| Location |
| Directions |
| Period of Performance |
| Ivey Creek Campground |
| From Creede, CO continue on Hwy 149 towards Lake City approximately 6.3 miles to FDR 523 (Middle Creek Rd) Turn left onto FDR 523 traveling approximately 4 miles to a "Y" junction, go left onto FDR 528 continue approximately 3 miles to a "T" intersection w/ FDR 526 (Ivy Creek Rd) and stay on this road approximately 3 miles to the campground entrance on the left. |
| June 28-July 7 as needed |
| Rock Creek Campground |
| In Monte Vista, CO, from the intersection of Hwy 160 and take State Rt. 15 south 2 miles to Rock Creek Campground/Forest Rt. 28 sign. Turn right onto Rt. 28 and go 2.5 miles to a "T" intersection (County Rt. 28). Turn left onto County Rt. 28 and go 12.1 miles to campground sign. Turn left at sign into campground. |
| July 12-July 23 as needed |
| Rock Creek Picnic Area |
| In Monte Vista, CO, from the intersection of Hwy 160 and take State Rt. 15 south 2 miles to Rock Creek Campground/Forest Rt. 28 sign. Turn right onto Rt. 28 and go 2.5 miles to a "T" intersection (County Rt. 28). Turn left onto County Rt. 28 and go 12.2 miles to picnic area. Turn left at sign into campground. |
| July 12-July 23 as needed |
| Comstock Campground |
| In Monte Vista, CO, from the intersection of Hwy 160 and take State Rt. 15 south 2 miles to Rock Creek Campground/Forest Rt. 28 sign. Turn right onto Rt. 28 and go 2.5 miles to a "T" intersection (County Rt. 28). Turn left onto County Rt. 28 and go 14.2 miles to campground. Turn left at sign into campground. |
| July 12- July 30 as needed |
| Lost Trail Campground |
| From Creede, CO take Hwy 149 for approximately 18 miles to FDR 520 (Rio Grande Reservoir Rd), proceede on FDR 520 for approximately 17.5 miles to the campground on the left. |
| July 5-July 14 as needed |
| Rio Grande Campground |
| From Creede, CO take Hwy 149 west headed towards Lake City for 7.8 miles to FDR 529 and into the Rio Grande Campground. |
| June 30-July 9 as needed |
| Road Canyon Campground |
| From Creede, CO take Hwy 149 for approximately 18 miles to FDR 520 (Rio Grande Reservoir Rd), proceede on FDR 520 for approximately 5 miles to the campground on the left. |
| July 8-July 16 as needed |
| Marshall Park Campground |
| From Creede, CO, take State Rt. 149 south (toward Lake City) 5.6 miles to Middle Creek Rd. sign. Turn left onto Middle Creek Rd. and go 0.4 miles to campground. |
| May 24-June 4 as needed |
| River Hill Campground |
| From Creede, CO, take State Rt. 149 south (toward Lake City) 19.3 miles to Rio Grande Reservoir sign (Forest Rt. 520). Turn left at sign onto Rt. 520 and go 0.5 miles to "Y" intersection. Bear left, staying on Rt. 520, on dirt road and go 9.3 miles to campground sign. Turn left at sign and go 0.1 miles to campground entrance. |
| August 23-Sept 14 as needed |
| Thirty Mile Campground |
| From Creede, CO, take State Rt. 149 south (toward Lake City) 19.3 miles to Rio Grande Reservoir sign (Forest Rt. 520). Turn left onto Rt. 520 and go 0.5 miles to a "Y" intersection. Bear left onto a dirt road, staying on Rt. 520, and go 10.8 miles to campground sign. Turn left into campground. |
| August 30 - October 1 as needed |
| North Clear Creek Campground |
| From Creede, CO, take State Rt. 149 south (toward Lake City) 21.6 miles to North Clear Creek Road sign (Forest Rt. 510). Turn right at sign onto Rt. 510 (gravel) and go 2.1 miles to campground sign. Turn right into campground. |
| June 14-June 25 as needed |
| Silver Thread Campground |
| From Creede, CO, take State Rt. 149 south (toward Lake City) 23 miles to campground sign. Turn right at sign into campground. |
| June 21-July 2 as needed |
| Lower Beaver Creek Campground |
| In South Fork, CO, at intersection of State Rt. 149 and US Rt. 160, take Rt. 160 west 1.4 miles to Beaver Creek Rd. sign. Turn left at sign onto Beaver Creek Rd. and go 3.1 miles to campground sign. Turn right at sign and go 0.1 miles to campground |
| May 31-June 18 as needed |
| Park Creek Campground |
| From South Fork, CO, take US Rt. 160 west towards Wolf Creek Pass for approximately 7 miles to the Campground entrance on the left. |
| August 9-August 20 as needed |
| Tucker Ponds Campground |
| In South Fork, CO, at intersection of State Rt. 149 and US Rt. 160, take Rt. 160 west 13.5 miles to campground sign (Forest Rt. 390). Turn left at sign onto Rt. 390 |
| August 2 - August 13 as needed |
| Cathedral Campground |
| From South Fork, CO, take US Rt. 160 east 5.3 miles to Embargo Creek Rd. and County Rt. 18 signs. Turn left onto Rt. 18 and go 1.4 miles to a "T" intersection (County Rt. 15). Turn right onto Rt. 15 and go 0.3 miles to another "T" intersection (County Rt. 65). Turn left onto Rt. 65 and go 3.2 miles to "Y" intersection (Forest Rt. 640/650). Bear left onto Rt. 640 (dirt, single lane with no turnouts) and go 7.6 miles to campground sign. Turn right at sign into campground. |
| August 16-Sept 3 as needed |
| Highway Springs Campground |
| In South Fork, CO, at intersection of State Rt. 149 and US Rt. 160, take Rt. 160 west 4.1 miles to campground sign. Turn left into campground. |
| July 26 - August 6 as needed |
| Shallow Creek Trailhead |
| From Creede, CO travel west on Hwy 149 towards Lake City for approximately 3 miles, turn north on Cty Rd 507 for two miles, turn west on FDR 508 for 1/4 mile, just past the cattle guard go make a left, heading south and continue to the end of the road. |
| May 24 - October 5 as needed |
| Deep Creek Trailhead |
| From South Fork, CO at the junction of Hwy 160 and Hwy 149 take Hwy 149 for approximately 18.4 miles to Deep Creek Road take a left onto Deep Creek Road and continue for approximately 2 miles to the Deep Creek Trailhead on the south side of the road. |
| May 24-October 5 as needed |
| Comstock Trailhead |
| In Monte Vista, CO, from the intersection of Hwy 160 and take State Rt. 15 south 2 miles to Rock Creek Campground/Forest Rt. 28 sign. Turn right onto Rt. 28 and go 2.5 miles to a "T" intersection (County Rt. 28). Turn left onto County Rt. 28 and go 14.2 miles to campground. Turn left at sign into campground. |
| July 19 - July 30 as needed |
Conejos Peak Ranger District
| Location |
| Directions |
| Period of Performance |
| Trujillo Meadows Campground |
| In Chama, NM, take State Rt. 17 north 13 miles to Trujillo Meadows Reservoir sign (in Colorado). Turn left at sign (dirt) and go 0.1 miles to a "T" intersection and campground sign (Forest Rt. 118). Turn right onto Rt. 118 and go 2.1 miles to campground on right. Alternate Route: From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight onto Rt. 17 and go 35.2 miles to Trujillo Meadows Reservoir sign. Turn right at sign (dirt) and go 0.1 miles to "T" intersection and campground sign (Forest Rt. 118). Turn right onto Rt. 118 and go 2.1 miles to campground on right. |
| July 5, 2010 to July 30, 2010 as needed |
| Mogote Campground |
| From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight on Rt. 17 and go 13.2 miles to campground sign. Turn left at sign and go 0.3 miles to campground on right. |
| August 30, 2010 to October 1, 2010 as needed |
| Mix Lake Campground & Picnic Area |
| From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight on Rt. 17 and go 21.9 miles to Platoro sign (Forest Rt. 250). Turn right at sign onto Rt. 250 (dirt) and go 23.4 miles to Mix Lake sign. Turn left at sign and go 0.6 miles to campground. |
| August 2, 2009 to August 20, 2009 as needed |
| Stunner Campground |
| In La Jara, CO, at intersection of State Rt. 285 and County Rt. 15, take Rt. 15 west 10.6 miles FDR 255 (Forest Rt. 255). Turn left onto Rt. 255 (dirt) and go 11.4 miles to intersection with Forest Rt. 250. Continue straight on Rt. 250 and go 18.4 miles to "Y" intersection (Forest Rt. 380). Bear right at intersection onto Rt. 380 and go 0.4 miles to campground sign. Turn left at sign and go 0.3 miles to campground. |
| July 27, 2009 to August 6, 2009 as needed |
| Alamosa River Campground |
| In La Jara, CO, at intersection of State Rt. 285 and County Rt. 15, take Rt. 15 west 10.6 miles to FDR 255 (Forest Rt. 255). Turn left onto Rt. 255 (dirt) and go 11.4 miles to intersection with Forest Rt. 250. Continue straight on Rt. 250 and go 3.3 miles to campground sign. Turn left at sign into campground. |
| July 27, 2010 to August 6, 2010 as needed |
| Chama Basin Trailhead |
| From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight on Rt. 17 up cumbres pass and across the Colorado/New Mexico State Line into New Mexico. Continue towards Chama, NM on US Hwy 17 approximately 3.5 miles til you get to FSR 121. Turn right on Forest Service Road 121 through the Rancho de Oso Pardo Ranch on FSR 121. Continue approx. 3 miles to the CO/NM state line back into Colorado on FSR 121 and continue approximately 2 miles to Chama Basin Trail Head on Left on FSR 122. Trail Head is down by Rio Chama River next to livestock corrals. Do Not continue on FSR 121 as it dead ends. |
| August 9, 2010 to August 20, 2010 as needed |
| Red Lake Trailhead |
| Follow Highway 17 to its junction with Forest Road #114, one-half mile south of the summit of La Manga Pass. Follow Road#114 approximately 3 miles to the trail head. |
| August 9, 2010 to August 20, 2010 as needed |
| Three Forks Trailhead |
| From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight on Rt. 17 and go 21.9 miles to Platoro sign in Horca, CO. (Forest Rt. 250). Turn right at sign on FSR250. Continue approximately 20 miles on FSR 250 to town of Platoro. Continue on FSR 250 past Platoro until you get to intersection of FSR250, FSR247. Continue approximately 5 miles on FSR 247 to Three Forks Trail Head which is at the end of FSR 247. FSR 247 runs along Platoro Reservoir for about 3 miles. |
| August 9, 2010 to August 20, 2010 as needed |
| Lower Southfork Trailhead |
| From Antonito, CO, take US Rt. 285 south 0.3 miles to State Rt. 17. Continue straight on Rt. 17 and go 21.9 miles to Platoro sign (Forest Rt. 250). Turn right at sign. Continue on Forest Service Road 250 approximately 10.5 miles on FSR 250 until you see South Fork Trailhead sign. Trailhead parking area on left. |
| August 9, 2010 to August 20, 2010 as needed |
II- 3 – Government-Furnished Property The Government will provide the following items of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract. The following items will be government furnished:
None
II- 4 - Inspection and Acceptance Requirements
Gravel will be inspected by a Government representative upon delivery. If the Government rejects delivery of the gravel the Contractor has 24 hours in which to correct or replace the product under this clause, the Contractor shall be liable for transportation charges up to an amount equal to the cost of transportation by the usual commercial method of shipment from the place of delivery specified in this contract (irrespective of the f.o.b. point or the point of acceptance) to the Contractor’s place of business and return to the place of delivery specified in this contract. The Contractor shall also bear the responsibility for the supplies while in transit.
II- 5 - Noxious Weed Control In order to prevent the potential spread of noxious weeds into work areas, Contractor shall be required to use weed-free gravel. Failure to provide clean gravel may result in the rejection of gravel.
SECTION III - CONTRACT CLAUSES
III- 1 - FAR 52.212-4 Contract Terms and Conditions - Commercial Items (MAR 2009)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights --
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C.3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613). Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include --
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, contract line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration, or 52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor Registration), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt Payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected contract line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in Section 611 of the Contract Disputes Act of 1978 (Public Law 95-563), which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period at fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. 3701, et seq., Contract Work Hours and Safety Standards Act; 41 U.S.C. 51-58, Anti-Kickback Act of 1986; 41 U.S.C. 265 and 10 U.S.C. 2409 relating to whistleblower protections; Section 1553 of the American Recovery and Reinvestment Act of 2009 relating to whistleblower protections for contracts funded under that Act; 49 U.S.C. 40118, Fly American; and 41 U.S.C. 423 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, and Compliance with Laws Unique to Government Contracts paragraphs of this clause.
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) Central Contractor Registration (CCR).
(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(2)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the CCR database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.
FAR 52.212-4 Addendum to - Contract Terms
III- 2 - FAR 52.215-2 Audit and Records—Negotiation (MAR 2009) ALT I (MAR 2009)
(a) As used in this clause, “records” includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form.
(b) Examination of costs. If this is a cost-reimbursement, incentive, time-and-materials, labor-hour, or price redeterminable contract, or any combination of these, the Contractor shall maintain and the Contracting Officer, or an authorized representative of the Contracting Officer, shall have the right to examine and audit all records and other evidence sufficient to reflect properly all costs claimed to have been incurred or anticipated to be incurred directly or indirectly in performance of this contract. This right of examination shall include inspection at all reasonable times of the Contractor’s plants, or parts of them, engaged in performing the contract.
(c) Cost or pricing data. If the Contractor has been required to submit cost or pricing data in connection with any pricing action relating to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the cost or pricing data, shall have the right to examine and audit all of the Contractor’s records, including computations and projections, related to—
(1) The proposal for the contract, subcontract, or modification;
(2) The discussions conducted on the proposal(s), including those related to negotiating;
(3) Pricing of the contract, subcontract, or modification; or
(4) Performance of the contract, subcontract or modification.
(d) Comptroller General or Inspector General.
(1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials, shall have access to and the right to—
(i) Examine any of the Contractor’s or any subcontractor’s records that pertain to and involve transactions relating to this contract or a subcontract hereunder; and
(ii) Interview any officer or employee regarding such transactions.
(2) This paragraph may not be construed to require the Contractor or subcontractor to create or maintain any record that the Contractor or subcontractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) Reports. If the Contractor is required to furnish cost, funding, or performance reports, the Contracting Officer or an authorized representative of the Contracting Officer shall have the right to examine and audit the supporting records and materials, for the purpose of evaluating—
(1) The effectiveness of the Contractor’s policies and procedures to produce data compatible with the objectives of these reports; and
(2) The data reported.
(f) Availability. The Contractor shall make available at its office at all reasonable times the records, materials, and other evidence described in paragraphs (a), (b), (c), (d), and (e) of this clause, for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in Subpart 4.7, Contractor Records Retention, of the Federal Acquisition Regulation (FAR), or for any longer period required by statute or by other clauses of this contract. In addition—
(1) If this contract is completely or partially terminated, the Contractor shall make available the records relating to the work terminated until 3 years after any resulting final termination settlement; and
(2) The Contractor shall make available records relating to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to this contract until such appeals, litigation, or claims are finally resolved.
(g) (1) Except as provided in paragraph (g)(2) of this clause, the Contractor shall insert a clause containing all the terms of this clause, including this paragraph (g), in all subcontracts under this contract. The clause may be altered only as necessary to identify properly the contracting parties and the Contracting Officer under the Government prime contract.
(2) The authority of the Inspector General under paragraph (d)(1)(ii) of this clause does not flow down to subcontracts.
The clause may be altered only as necessary to identify properly the contracting parties and the Contracting Officer under the Government prime contract.
III- 3 - FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (DEC 2007)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 2902.10 et seq.). For example, some USDA-designated items such as mobile equipment hydraulic fluids, diesel fuel additives, and penetrating lubricants are excluded from the preferred procurement requirement for the application of the USDA-designated item to one or both of the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.usda.gov/biopreferred.
III- 4 - FAR 52.236-7 Permits and Responsibilities (NOV 1991)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
III- 5 - FAR 52.237-2 Protection of Government Buildings, Equipment, and Vegetation (APR 1984)
The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor’s failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
III- 6 - FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items (DEC 2009)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer shall check as appropriate.] ___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sep 2006), with Alternate I (Oct 1995)(41 U.S.C. 253g and 10 U.S.C. 2402).
___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Dec 2008) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
__X (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Mar 2009) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).
__X (4) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (Mar 2009) (Pub. L. 111-5).
___ (5) 52.219-3, Notice of Total HUBZone Set-Aside (Jan 1999)(15 U.S.C. 657a).
___ (6) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jul 2005) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
___ (7) [Reserved]
__X (8) (i) 52.219-6, Notice of Total Small Business Aside (June 2003) (15 U.S.C. 644).
___ (ii) Alternate I (Oct 1995) of 52.219-6.
___ (iii) Alternate II (Mar 2004) of 52.219-6.
___ (9) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003)(15 U.S.C. 644).
___ (ii) Alternate I (Oct 1995) of 52.219-7.
___ (iii) Alternate II (Mar 2004) of 52.219-7.
___ (10) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)).
___ (11) (i) 52.219-9, Small Business Subcontracting Plan (Apr 2008)(15 U.S.C. 637 (d)(4).)
___ (ii) Alternate I (Oct 2001) of 52.219-9.
___ (iii) Alternate II (Oct 2001) of 52.219-9.
__X (12) 52.219-14, Limitations on Subcontracting (Dec 1996)(15 U.S.C. 637(a)(14)).
___ (13) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999)(15 U.S.C. 637(d)(4)(F)(i)).
___ (14) (i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Oct…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .