Page 3 of Amendment No.1-10-0035 docx.docx

DOCX document 13 KB Posted

Attached to
RECOVERY - CONSTRUCTION, FRENCHTOWN CULVERT REPLACEMENT, LO LO NF, MISSOULA MT
Solicitation number
AG-82B1-S-10-0035
Issued by

About this file

Amendment No. 1 page 3

View the file

Other files

File Type Posted
A-1-10-0035.pdf PDF
S-10-0035- B thru M.doc DOC document
S-10-0035 Maps Drawings Lower 6 Mile.pdf PDF
Wage Determination Montana.txt TXT text file
13 Maps Drawings Upper 6 Mile.pdf PDF
14 maps drawings Litle Mc Cormick.pdf PDF
COVER s-10-0035.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 3 of Amendment No. 1

Attachment to Amendment No. 1, Solicitation AG-82B1-S-10-0035

1. Specification Changes:

a. The contractor shall furnish all required aggregate. Accordingly, in the attachment Upper Sixmile Creek No. 17222-0.5, Sheet 3, “Summary of Estimated Quantities No. 17222-0.5” , Item No. 32211, delete “(GOVERNMENT SOURCE)’ in its entirety.

b. In the attachment Lower Sixmile Creek No. 457-9.6 , Sheet 3, “Summary of Estimated Quantities No. 457-9.6”, Item 32211, delete (GOVERNMENT SOURCE) in its entirety.

2. The due date for receipt of bids is changed from Monday, December 14, 2009 to Wednesday, December 16, 2009. The time and place for receipt of bids remain unchanged.

3. The period of performance stated on page 3 of the Optional Form 1442 and on page 5 C – 1 (f) is changed from September 15, 2010 to October 15, 2009. The estimated start date remains unchanged at December 28, 2009.

All other items in the subject solicitation remain unchanged.

All Offerors must sign and return (complete blocks 8 & 15) a copy of this amendment to be included with the respective bid for award consideration.

/END OF AMENDMENT/