questions and answers AMEND 3.DOC

DOC document 24 KB Posted

Attached to
RECOVERY - San Juan National Forest Road Decommissioning and Stabilization SAN JUAN NATIONAL FOREST
Solicitation number
AG-82B1-S-10-0001
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
650-200_Rev11102009_Type1 Amend 3.pdf PDF
SF 18 AMEND 3.PDF PDF
SF 18 AMEND 2.PDF PDF
Experience Questionnaire Amend 2.doc DOC document
Amend 1 Description.pdf PDF
Amend 1 Maps.pdf PDF
SF 30 AMEND 1.pdf PDF
wage determination.txt TXT text file
AG-82B1-S-10-0001.pdf PDF
BARRIER_ROCK_60F6.pdf PDF
650-202_Rev_Type1_5OF6.pdf PDF
vic_map_1OF6.pdf PDF
650-201_Rev_Type1_4OF6.pdf PDF
FSSS_GateClosure.pdf PDF
650-200_Rev_Type1_3OF6.pdf PDF
SF 18.PDF PDF
general notes_2of6.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

SOLICITATION NUMBER AG-82B1-S-10-0001/AMENDMENT 3

Q. - Page 4 in the Spec. shows a road section TYP. for excavation work. Is this what will be the case at all the locations?

A. --The road typical shown of page 4 of the specifications is very general. More specific typicals for both a single-lane and a double lane are shown on sheet 4 of 6 (Standard Drawing 650-201), but these show a range of roadway widths and do not display the range of roadside slopes and conditions that may be encountered. Conditions will vary depending on site-specific conditions, so field verification is recommended prior to gate fabrication.

Q. -- Will the forest service be providing the gates and the signs as the permittee?

A. No, the contractor will provide gates and signs. A recommended sign fabricator has been listed.

Q. Will the forest service be providing the “Forest Service Brown” paint?

A. No, the contractor will provide all construction materials.

Q. Besides the actual bid schedule what additional information needs to be submitted with the bid to provide the forest service necessary experience information?

A. Document experience on similar projects and references.

Q. The plans reference 3/8”x3” M.B. to fasten top rail together. I assume this is a bolt. Could I get additional clarification on this bolt?

A. These are galvanized bolts.

Q. Should all bolts be galvanized to hold the signs on the gate?

A. Bolts shall be galvanized and designed to be vandal-proof