questions and answers AMEND 3.DOC
DOC document 24 KB Posted
- Attached to
- RECOVERY - San Juan National Forest Road Decommissioning and Stabilization SAN JUAN NATIONAL FOREST
- Solicitation number
- AG-82B1-S-10-0001
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 650-200_Rev11102009_Type1 Amend 3.pdf | ||
| SF 18 AMEND 3.PDF | ||
| SF 18 AMEND 2.PDF | ||
| Experience Questionnaire Amend 2.doc | DOC document | |
| Amend 1 Description.pdf | ||
| Amend 1 Maps.pdf | ||
| SF 30 AMEND 1.pdf | ||
| wage determination.txt | TXT text file | |
| AG-82B1-S-10-0001.pdf | ||
| BARRIER_ROCK_60F6.pdf | ||
| 650-202_Rev_Type1_5OF6.pdf | ||
| vic_map_1OF6.pdf | ||
| 650-201_Rev_Type1_4OF6.pdf | ||
| FSSS_GateClosure.pdf | ||
| 650-200_Rev_Type1_3OF6.pdf | ||
| SF 18.PDF | ||
| general notes_2of6.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
SOLICITATION NUMBER AG-82B1-S-10-0001/AMENDMENT 3
Q. - Page 4 in the Spec. shows a road section TYP. for excavation work. Is this what will be the case at all the locations?
A. --The road typical shown of page 4 of the specifications is very general. More specific typicals for both a single-lane and a double lane are shown on sheet 4 of 6 (Standard Drawing 650-201), but these show a range of roadway widths and do not display the range of roadside slopes and conditions that may be encountered. Conditions will vary depending on site-specific conditions, so field verification is recommended prior to gate fabrication.
Q. -- Will the forest service be providing the gates and the signs as the permittee?
A. No, the contractor will provide gates and signs. A recommended sign fabricator has been listed.
Q. Will the forest service be providing the “Forest Service Brown” paint?
A. No, the contractor will provide all construction materials.
Q. Besides the actual bid schedule what additional information needs to be submitted with the bid to provide the forest service necessary experience information?
A. Document experience on similar projects and references.
Q. The plans reference 3/8”x3” M.B. to fasten top rail together. I assume this is a bolt. Could I get additional clarification on this bolt?
A. These are galvanized bolts.
Q. Should all bolts be galvanized to hold the signs on the gate?
A. Bolts shall be galvanized and designed to be vandal-proof