Little Blackfoot Road

HYPERLINK \l "_Toc241114737" Little Blackfoot Road Maintenance and Surfacing2
HYPERLINK \l "_Toc241114738" SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK4
HYPERLINK \l "_Toc241114739" 452.211-72 Statement of Work/Specifications. (FEB 1988)6
HYPERLINK \l "_Toc241114740" 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)6
HYPERLINK \l "_Toc241114741" Section D - Packaging and Marking6
HYPERLINK \l "_Toc241114742" Section E - Inspection and Acceptance6
HYPERLINK \l "_Toc241114743" 52.252-2 Clauses Incorporated by Reference. (FEB 1998)6
HYPERLINK \l "_Toc241114744" Section F - Deliveries or Performance6
HYPERLINK \l "_Toc241114745" 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) - Alternate I (APR 1984)6
HYPERLINK \l "_Toc241114746" 52.252-2 Clauses Incorporated by Reference. (FEB 1998)7
HYPERLINK \l "_Toc241114747" Section G - Contract Administration Data7
HYPERLINK \l "_Toc241114748" Section H - Special Contract Requirements7
HYPERLINK \l "_Toc241114749" PART II – CONTRACT CLAUSES12
HYPERLINK \l "_Toc241114750" Section I - Contract Clauses12
HYPERLINK \l "_Toc241114751" 52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009. (MAR 2009)15
HYPERLINK \l "_Toc241114752" 52.204-7 Central Contractor Registration. (APR 2008)15
HYPERLINK \l "_Toc241114753" 52.204-11 American Recovery and Reinvestment Act--Reporting Requirements. (MAR 2009)17
HYPERLINK \l "_Toc241114754" 52.214-29 Order of Precedence - Sealed Bidding. (JAN 1986) (modified for construction)21
HYPERLINK \l "_Toc241114755" 52.222-39 Notification of Employee Rights Concerning Payment of Union Dues or Fees. (DEC 2004)21
HYPERLINK \l "_Toc241114756" 52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials. (MAR 2009)23
HYPERLINK \l "_Toc241114757" 52.228-1 Bid Guarantee. (SEP 1996)26
HYPERLINK \l "_Toc241114758" 52.236-8 Other Contracts. (APR 1984)26
HYPERLINK \l "_Toc241114759" 52.244-6 Subcontracts for Commercial Items. (MAR 2009)26
HYPERLINK \l "_Toc241114760" 452.228-70 Alternative Forms of Security. (NOV 1996)27
HYPERLINK \l "_Toc241114761" PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS28
HYPERLINK \l "_Toc241114762" Section J - List of Documents, Exhibits, and Other Attachments28
HYPERLINK \l "_Toc241114763" PART IV – REPRESENTATIONS AND INSTRUCTIONS29
HYPERLINK \l "_Toc241114764" Section K - Representations, Certifications, and Other Statements of Bidders29
HYPERLINK \l "_Toc241114765" 52.204-8 Annual Representations and Certifications. (FEB 2009)29
HYPERLINK \l "_Toc241114766" 52.209-5 Certification Regarding Responsibility Matters. (DEC 2008)32
HYPERLINK \l "_Toc241114767" 52.219-28 Post-Award Small Business Program Rerepresentation. (APR 2009)35
HYPERLINK \l "_Toc241114768" 52.223-1 Biobased Product Certification. (DEC 2007)37
HYPERLINK \l "_Toc241114769" 52.223-13 Certification of Toxic Chemical Release Reporting. (AUG 2003)37
HYPERLINK \l "_Toc241114770" 452.219-70 Size Standard and NAICS Code Information. (SEP 2001)38
HYPERLINK \l "_Toc241114771" Section L - Instructions, Conditions, and Notices to Bidders38
HYPERLINK \l "_Toc241114772" 28.102 Performance and payment bonds and alternative payment protections for construction contracts.38
HYPERLINK \l "_Toc241114773" 52.216-1 Type of Contract. (APR 1984)38
HYPERLINK \l "_Toc241114774" 52.222-5 Davis-Bacon Act--Secondary Site of the Work. (JUL 2005)39
HYPERLINK \l "_Toc241114775" 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999)39
HYPERLINK \l "_Toc241114776" 52.225-22 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials. (MAR 2009)40
HYPERLINK \l "_Toc241114777" 52.233-2 Service of Protest. (SEP 2006)41
HYPERLINK \l "_Toc241114778" 52.236-27 Site Visit (Construction). (FEB 1995)41
HYPERLINK \l "_Toc241114779" 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)42
HYPERLINK \l "_Toc241114780" Section M - Evaluation Factors for Award42
HYPERLINK \l "_Toc241114781" 14.101 Elements of sealed bidding.42
HYPERLINK \l "_Toc241114782" 52.214-19 Contract Award - Sealed Bidding - Construction (AUG 1996)42

PART I – THE SCHEDULE

Little Blackfoot Road Maintenance and Surfacing Helena Ranger District - Helena National Forest Powell County

ITEM 1 – Little Blackfoot Road #227 (MP 3.85-9.85)

ITEM

NO.

DESCRIPTION

METH.*

MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

151(01)

Mobilization

LSQ

Lump Sum

157(13)

Soil Erosion & Pollution Control

LSQ

Lump Sum

203(01)

Removal of Culverts, Disposal Method A

AQ

Each

207(01)

Earthwork Geotextile, Type II

DQ

Square Yard

230(50)

Roadside Brushing

DQ

Mile

251(01)III

Placed riprap, class III

AQ

Cubic Yard 12.5

251(01)IV

Placed riprap, class IV

AQ

Cubic Yard

303(04)

Reconditioning Ditch

DQ

Mile

Option #1**

306(01)A

Calcium Chloride Flake @1.17 lbs/sy 20’

DQ

Ton

Option #2**

306(01)B

Calcium Chloride Brine @0.22 gal/sy 20’

DQ

Ton

Option #3**

306(01)C

Magnesium Chloride Brine @0.30 gal/sy 20’

DQ

Ton

321(03)

Aggregate Base Course, Grading A, Comp C

DQ

Cubic Yard

321(11)

Aggregate Surface Course, Grading G, Comp C

DQ

Cubic Yard

602(50)18

18 inch corrugated metal pipe, 0.064 inch thickness for steel, compaction method B

AQ

Foot

602(50)24

24 inch corrugated metal pipe, 0.064 inch thickness for steel, compaction method B

AQ

Foot

617(01)

Guardrail System Steel, Type I, Class B

DQ

Each

622(01)E

Equipment Rental, Excavator with Thumb

AQ

Hour

622(01)T

Equipment Rental, Dump Truck

AQ

Hour

625(01)

Seeding, Dry method

LSQ

Lump Sum

Total Bid $__________

* Designated Method of Measurement:

DQ - Designed Quantities; AQ - Actual Quantities; LSQ - Lump Sum Quantities

** Submit the most economical bid price for one of the three optional dust abatement products. Award of this contract will only include one of the three optional dust abatement products.

Note: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payment Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C- 1 - Project Description and Location

Description of Work. The intent of this project is to perform road maintenance and surfacing to improve road drainage and reduce sediment. This project is located on the Helena Ranger District, Helena National Forest. The work involved with this project includes, but is not limited to, installing bridge approach guardrail sysetem (4 corners), ditch reconditioning, removing and installing culverts, placing riprap, preparing the roadbed for aggregate placement (blade, water, and compact), hauling and placing aggregate surface courses (haul, spread, water, compact), and seeding, while providing proper soil and erosion control measures.

(b) Project Location. Located on the Helena Ranger District, Helena National Forest, Powell County, Montana. From Helena, MT travel west on Highway 12 for approximately 20 miles (over MacDonald Pass). Just prior to entering Elliston, MT turn left on Little Blackfoot Road #227. The bridge approach guardrail work is at M.P. 1.34 measured from the Junction with Forest Service Road #495 (end of pavement) and the road maintenance and surfacing begins at M.P 3.85.

(c) Price Range. Between $250,000 and $500,000.

(d) Site Visit. No formal site visit is scheduled. Questions regarding the project may be directed to Don Senn, Helena National Forest, at (406) 495-3742.

(e) Pre-Bid Conference. No formal pre-bid conference is scheduled.

(f) Start Work. Work may begin May 1, 2010. Requirements of in stream work is only permitted from July 15 to Sept. 1, unless designated otherwise by the Contracting Officer.

(g) Period of Performance. All work items must be completed by Sept. 1, 2010. (See Section F, FAR Clause 52.211-10.)

C- 2 - GOVERNMENT-FURNISHED PROPERTY

(a) Riprap

C- 3 - STANDARD SPECIFICATIONS

"Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects" (FP-03, U.S. Customary Unit), are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract.

These specifications can be obtained from the following website:

http://www.wfl.fha.dot.gov/design/specs/fp03.htm

C- 4 – SUPPLEMENTAL SPECIFICATIONS

The Supplemental Specifications include additions and revisions to the Standard Specifications. The following Supplemental Specifications are part of the solicitation and any resulting contract and are included hard copy by reference here and are an actual separate document included with this solicitation.

thumbnail_0.emf thumbnail_1.wmf

Other files

File Type Posted
a-1 s-0103.pdf PDF
General Decision Number.doc DOC document
71176069.pdf PDF
Plans.PDF PDF
Supplemental Specifications.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .