About this file

Attachments - J1b - Drawings 2

View the file

Other files for this federal contract opportunity

Other files attached to East Fork Fall Cr. , Silver Cr #2, & Silver Cr. #3 Bridge Replacement, newest first.
File Type Posted
B-934 Final Drawings.pdf PDF
fire precautions.doc DOC document
B-932 Final Drawings.pdf PDF
Solicitation SF1442.pdf PDF
FS ARRA SIGN DETAILS.pdf PDF
AG-82B1-S-09-0066.doc DOC document
Wage Determination ID080015 —
FSSS for Silver Creek Bridges.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Long Fork Silver Creek

U co n C reek

E ggers Creek

C abin Creek g

Bridge No. 671E 1.1 44º 22' 18.7" 115º 45' 55.9"

To C ro uc h, Id ah o

.5

M ile s

E

T 12 N R 6 E

T 12 N R 5 E

1E

S ilv er C re ek

Silver Creek Guard Station

B

678H

678C

B

G

671D

272829 l l l l l l l hg

M i H

Boise National Forest

Project Location T.12N. R.6E. Sec. 17

Hwy. 21

Hwy. 55 l Crouch

Boise

Lowman

Stanley

Cascade

Idaho City

Horseshoe Bend

0 25 50 Miles

Legend g Project Location

Roads

Map Coordinate = UTM, NAD 83

0 0.50.25

Miles

1 Plan Index & Specifications
2 Vicinity Map
3 Bridge Site Plan & Profile
4 Typical Sections
5 Abutment Details
6 Wingwall Details
7 Deck Panel Layout & Typical Sections
8 Treated Timber Bill of Materials

File details come from the government source that posted it. Updated .