B-933 Final Drawings.pdf
PDF 1 MB Posted
- Attached to
- East Fork Fall Cr. , Silver Cr #2, & Silver Cr. #3 Bridge Replacement Federal contract opportunity
- Solicitation number
- AG-82B1-S-09-0066
About this file
Attachments - J1b - Drawings 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B-934 Final Drawings.pdf | ||
| fire precautions.doc | DOC document | |
| B-932 Final Drawings.pdf | ||
| Solicitation SF1442.pdf | ||
| FS ARRA SIGN DETAILS.pdf | ||
| AG-82B1-S-09-0066.doc | DOC document | |
| Wage Determination ID080015 | — | |
| FSSS for Silver Creek Bridges.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Long Fork Silver Creek
U co n C reek
E ggers Creek
C abin Creek g
Bridge No. 671E 1.1 44º 22' 18.7" 115º 45' 55.9"
To C ro uc h, Id ah o
.5
M ile s
E
T 12 N R 6 E
T 12 N R 5 E
1E
S ilv er C re ek
Silver Creek Guard Station
B
678H
678C
B
G
671D
272829 l l l l l l l hg
M i H
Boise National Forest
Project Location T.12N. R.6E. Sec. 17
Hwy. 21
Hwy. 55 l Crouch
Boise
Lowman
Stanley
Cascade
Idaho City
Horseshoe Bend
0 25 50 Miles
Legend g Project Location
Roads
Map Coordinate = UTM, NAD 83
0 0.50.25
Miles
| 1 Plan Index & Specifications |
| 2 Vicinity Map |
| 3 Bridge Site Plan & Profile |
| 4 Typical Sections |
| 5 Abutment Details |
| 6 Wingwall Details |
| 7 Deck Panel Layout & Typical Sections |
| 8 Treated Timber Bill of Materials |
File details come from the government source that posted it. Updated .