Addendum to FAR 52.212-1.doc

DOC document 55 KB Posted

Attached to
Lochsa Aggregate Stockpile (Jungle Point Crushing) - Clearwater National Forest
Solicitation number
AG-82B1-S-09-0063
Issued by

About this file

Proposal Instructions - Addendum to FAR 52.212-1

View the file

Other files

File Type Posted
AppenixA.doc DOC document
Exhibit_4.pdf PDF
fire precautions.doc DOC document
SOW.doc DOC document
Exhibit_1.pdf PDF
FS ARRA SIGN DETAILS.pdf PDF
Exhibit_3.pdf PDF
Idaho County WD 05.doc DOC document
Exhibit_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum to FAR 52.212-1 Instructions to Offerors—Commercial

A. Offerors are required to submit proposals in 3 volumes and shall be in the format provided in this addendum, failure to submit proposals in the required format may render the proposal “non-responsive” and may not be considered for award. Each Volume shall be separated within the proposal package and should not be a continuation of the previous Volume. Proposals can be issued on offeror’s letterhead and must include the solicitation number. Proposals that exceed page restrictions may not be considered for award; a cover page and summary may be included and do not count against page restrictions.

B. Site Visit: No pre-bid tour is planned. For more information phone Chuck Fowlds 208-476-8369.

1. Volume I, Technical Approach (25 page maximum)

a. Volume I shall contain 2 sections; Section A – Technical Approach and Section B – Quality Control

b. Volume I - Section A, Technical Approach, shall contain the following information:

Technical Approach: Describe your proposed approach in meeting the objectives identified in the Statement of Work.

1. Proposed Schedule. Describe all significant work tasks, the sequence in which they are to be performed, and the workers and equipment to be assigned. Include the proposed time to be devoted to each task. We will assess the realism of proposed completion dates, given the resources to be devoted to the work. Include starting and completion dates. Include a safety plan for public traffic.

2. Experience in Similar Work. List proposed workers including foreman, operators, and crew. Describe their experience with pit development, rock crushing, and other work similar to that required by this contract.

3. Pit Development Plan. Describe all significant work tasks and the timing and equipment to be used.

Specifically address:

· Pit area – size, depth, anticipated clearing, overburden, material size

· Access roads

· Drilling and shooting contractor with schedule and plan

· Foreman and workers on site

· Stockpile area plan

· Safety during crushing and haul.

· Erosion control

c. Volume I - Section B, Quality Control Shall contain the following information:

The Quality Control Plan shall demonstrate how the Contractor will assure quality meets the requirements and specifications of the agreement. It shall specify:

1. Name and qualifications of person(s) responsible for performing quality control

2. Methods for supervising work of crew members

3. Methods of monitoring quality control to assure performance standards are met

Quality control includes monitoring quality while work is in progress, as well as performing plot inspections.

CONTRACTOR QUALITY CONTROL PLAN. In accordance with FAR 52.246-4 Inspection of Services -- Fixed-Price (b), the Contractor shall identify the quality control inspection system it will use to ensure that contract performance specifications will be achieved. This Quality Control Plan shall be used by the contractor to monitor its performance and at no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.

QUALITY ASSURANCE PLAN/REQUIREMENTS and DISINCENTIVES: The Contractor shall provide a Quality Control Plan that will ensure that the work is being performed in a manner that will meet the objectives of the contract. The Government will, at its convenience, make periodic inspections of the work to assure itself of contract compliance.

(a) - Contractor Quality Control Inspection. The Contractor shall ensure that performance meets contract specifications in accordance with the Quality Control Plan, prior to requesting the Government to inspect for payment or acceptance.

2. Volume II, Past Performance (15 Page maximum)

Volume II shall contain your record of past performance. List all contracts for the past five years requiring work similar to this project. We will assess such attributes as your history of cooperation with clients, and your history of performing quality work. If the offeror has no history of past performance, a neutral rating will be given.

For each project include:

a. type of work performed

b. size of the project (dollar amount)

c. foreman

d. customer contacts (include telephone numbers).

e. If problems were encountered, describe them and any corrective actions taken to prevent a recurrence.

Offerors are encouraged to submit at least 3 records of past performance and shall not submit more than 10. Past performance records must be recent (within the last 5 years) and relevant (similar to the proposed work to be performed).

3. Volume II, Price (1 page maximum)

a. Volume III shall contain your proposed total price. USFS intends to award a single firm-fixed price contract for these services; Offerors shall propose a firm-fixed price to perform all of the services outlined in the Statement of Work (SOW).

b. Price proposals shall be submitted in the following format inclusive of all costs, profit, overhead, etc. associated with the effort:

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

Mobilization

Lump Sum

Stockpiled Aggregate, Grading D (1” minus)

Ton 60,000

Stockpiled Aggregate, Grading Q (3” minus)

Ton 10,000

Pit and Quarry Development

Lump Sum

TOTAL PRICE

NOTE: ARRA Signs are not to be separately priced and should be included in CLIN 0001. See ARRA Sign Detail Attachment.

File details come from the government source that posted it. Updated .