Specifications

View the file

Other files

File Type Posted
SF 30 AMENDMENT 1.PDF PDF
SECTION M AMEND 1.pdf PDF
wage determination.txt TXT text file
SF 1442.pdf PDF
AG-82B1-S-09-0040.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. All specifications refer to FP-03 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.

2. Payment for mobilization is indirect to and included under pay item 1a.

3. The Price Lakes road will remain open to public traffic during this contract.

4. A traffic control plan for the project is required. The proposed plan shall be prepared by an American Traffic Safety Services Association (ATSSA) certified company and shall be submitted at the pre-work conference. The traffic control plan and all signs used shall be in compliance with the Manual of Uniform Traffic Control Devices (MUTCD). The COR shall approve the traffic control plans in writing before any work begins. Payment for traffic control is indirect to and included under pay item 1a.

5. One current AASHTO T-27 & one current AASHTO T-90 sieve analysis shall be provided for the crushed aggregate at the start of the project. The test may be conducted by the commercial pit operator. Written results shall be supplied to the COR. The payment for materials testing and certification of aggregate is indirect to and included under pay item 1a.

6. The contractor shall provide a spreadsheet for average road width at a minimum

8-inch loose aggregate depth. The COR shall approve the aggregate spreadsheet in writing before haul begins.

7. Contractor shall recondition roadbed, including turnouts and curve widening than shall place crushed aggregate. Work shall conform to Section 303(01). The payment for reconditioning is indirect to and included under pay item 1a.

8. The crushed aggregate shall be CDOT Class 6 with a plasticity index between 4-9 and compacted using Layer Placement (Hauling & Spreading Equipment) Method FSSS 204.11(d).

9. Watering for dust abatement may be necessary at select locations as determined by the COR. The payment for dust abatement is indirect to and included under pay item 1a.

Specification List For

Price Lakes Aggregate Haul

All specifications refer to Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03).

Division 100 - General Requirements

Section 156 – Public Traffic

Section 204 – Excavation and Embankment

Section 301 – Untreated Aggregate Courses

Section 303 – Road Reconditioning

Section 635 – Temporary Traffic Control

Section 703 – Aggregate

Forest Service Supplemental Specifications (FSSS)

Price Lakes Aggregate Haul

Table of Contents

Table of Contents Preface 101 - Terms, Format, and Definitions

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract

103 - Scope of Work Deletions

104 - Control of Work Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.05 Delete

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims

107.06 Contractor’s Responsibility for Work

107.09 Legal Relationship of the Parties

107.10 Environmental Protection

108 - Prosecution and Progress 108 Delete

109 - Measurement and Payment 109 Deletions

109.02 Measurement Terms and Definitions

155 - Schedules for Construction Contracts 155 Delete

301 - Untreated Aggregate Courses

301.05 Compacting

301.06 Surface Tolerance

303 - Road Reconditioning 602 - Culverts and Drains

602.03 General

635 - Temporary Traffic Control

635.03 General

718 - Traffic Signing and Marking Material

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_04_04_2007

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations ) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions .

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.

Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line --A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items --A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards --The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.05_0213_us_02_11_2005

106.05 Delete

Delete subsection 106.05.

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections :

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

301 - Untreated Aggregate Courses

301.05_0114_us_03_07_2005

301.05 Compacting

Delete the first and third paragraphs and add the following:

Compact the aggregate using the following method as specified:

(c.) Determine the maximum density of the mixture according to AASHTO 180, method D.

Compact each layer to at least 95 percent of maximum density. Determine the inplace density and moisture content according to AASHTO T 310 or other approved test procedure.

(d.) Hauling and Spreading Equipment. Adjust the moisture content to a level suitable for compaction. Operate spreading and hauling equipment over the full width of each layer of the aggregate.

(e.) Roller Compaction. Adjust the moisture content to a level suitable for compaction. Operate rollers over the full width of each layer until visual displacement ceases, but not fewer than three complete passes. Use rollers that meet the following requirements:

(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.

(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.

(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.

301.06_nat_us_03_03_2005

301.06 Surface Tolerance.

Add the following:

Thickness and Width requirements:

The maximum variation from the compacted specified thickness is ½ inch. The compacted thickness is not consistently above or below the specified thickness and the average thickness of 4 random measurements for any ½ mile of road segment is within + ¼ inch of the specified thickness.

The maximum variation from the specified width will not exceed +12 inches at any point.

The compacted width is not consistently above the specified width and the average of any four random measurements along any ½ mile of road segment is within +4 inches of the specified width.

303 - Road Reconditioning

303.00_0213_us_04_05_2006

303.01 Work.

Delete and replace with the following:

This work consists of reconditioning ditches, shoulders, roadbeds, parking areas, and turnouts.

303.03 Ditch Reconditioning.

Delete and replace with the following:

Remove all slide material, sediment, vegetation, and other debris from the existing ditches and culvert inlets and outlets. Reshape ditches and culvert inlets and outlets to achieve positive drainage and a uniform ditch width, depth, and grade.

303.04 Shoulder Reconditioning.

Delete and replace with the following:

Remove all slide material, vegetation, and other debris from existing shoulders including shoulders of parking areas, turnouts, and other widened areas. Reshape shoulders.

303.05 Roadbed Reconditioning.

Delete and replace with the following:

Remove all organic, deleterious, or oversize material larger than 6 inches from the top 6 inches of subgrade. Remove surface irregularities, and shape to provide a uniform surface. Compact according to Subsection 204.11.

303.06 Aggregate Surface Reconditioning.

Delete the entire subsection.

303.07 Roadway Reconditioning.

Delete and replace with the following:

Perform all the applicable work described in Subsections 303.03 through 303.05.

Maintain existing cross slope or crown.

303.08 Pulverizing.

303.09 Acceptance.

Delete the entire subsection.

303.10 Measurement.

Delete the entire subsection.

303.11 Payment.

602 - Culverts and Drains

602.03_nat_us_09_06_2005

602.03 General.

Add the following:

Ensure that the final installed alignment of all pipe allows no reverse grades, and does not permit horizontal and vertical alignments to vary from a straight line drawn from center of inlet to center of outlet by more than 2 percent of pipe center length or 1.0 feet, whichever is less.

635 - Temporary Traffic Control

635.03_nat_us_05_13_2004

635.03 General.

Add the following:

Install temporary traffic control signs to temporary posts or approved temporary sign mounts.

635.03_0213_us_04_21_2005

635.03 General.

Add the following paragraph:

Supply a traffic control plan. The proposed plan shall be prepared by an American Traffic Safety Services Association (ATSSA) certified company and shall be submitted at the pre-work conference. The traffic control plan and all signs used shall be in compliance with the Manual of Uniform Traffic Control Devices (MUTCD). The COR shall approve the traffic control plans in writing before any work begins. Payment for traffic control is incidental to and included under the pay item.

718 - Traffic Signing and Marking Material

718.05_nat_us_02_25_2008

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

703 - Aggregate

703.05_0213_us_02_24_2005

703.05 Subbase, Base, & Surface Course Aggregate.

Replace (1) and add (3) under 703.05(c) with the following:

(1) Gradation Table 703-3

(3) Plasticity index, AASHTO T 90: 4-9

Correct Table 703-2 as follows:

Remove all numbers and brackets that apply to statistical procedures and allowable deviations from the table. Remove (1) statistical procedures do not apply, and ( ) the value in parentheses is the allowable deviation (+) from the target values from below the table.

Replace Table 703-3 with the following:

Table 703-3. Gradation TV ranges for surface courses.

Sieve Size Percent Mass Passing Designated Sieve (AASHTO T 27 & T 11)

¾ in. 100

No. 4 30-65

No. 8 25-55

No. 200 8-16

703.06_nat_us_03_02_2005

703.10(e) Flakiness Index.

Delete and replace with the following:

Flakiness Index, FLH T 508 30% max.

703.10(i) Adherent Coating.

Adherent coating on the aggregate, FLH T 512 0.5% max.