SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-8173-S-17-0012

Original

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFQ)

3. DATE ISSUED

3/10/2017

PAGE OF PAGES

1 48

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

846399

6. PROJECT NO.

7. ISSUED BY CODE 8173 8. ADDRESS OFFER TO

USDA FOREST SERVICE

APACHE SITGREAVES NATIONAL FOREST

30 S CHIRICAHUA DR POB 640

SPRINGERVILLE AZ 85938-0640

USDA FOREST SERVICE

APACHE SITGREAVES NATIONAL FOREST

30 S CHIRICAHUA DR POB 640

SPRINGERVILLE AZ 85938-0640

9. FOR INFORMATION

CALL:

A. NAME

WARREN ABBOTT

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

928-333-6344

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

CONSTRUCTION: Replace flooring and painting -- Springerville Ranger Station – SITE VISIT SCHEDULED FOR MARCH 29, 2017, 10:00 A.M., 165 S. Mountain Avenue, Springerville, AZ 85938

NAICS: 238330 Size standard $15.0 Million PSC: Z2AA

Basis for award will be Best Value - Tradeoffs – See Section M for requirements.

Range: Between $25,000 and $100,000 -- Total Small Business Set-aside

Davis-Bacon Wages applies

11. The Contractor shall begin performance within 10 calendar days and complete it within 60 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 4:00pm (hour) local time APRIL 12, 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)

CONSTRUCTION RFQ 2 | P a g e SOL NO. AG-8173-S-17-0012 APACHE-SITGREAVES NFs

REPLACE FLOORING & PAINT RANGER STATION (06)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE 8173 27. PAYMENT WILL BE MADE BY

USDA FOREST SERVICE APACHE SITGREAVES

NATIONAL FOREST POB 640

30 S CHIRICAHUA DR SPRINGERVILLE AZ 85938

www.ipp.gov

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

WARREN ABBOTT

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)

CONSTRUCTION RFQ 3 | P a g e SOL NO. AG-8173-S-17-0012

PART I – THE SCHEDULE

SECTION B – SCHEDULE – SUPPLIES OR SERVICES AND PRICES/COSTS

B1 – SCHEDULE OF ITEMS

REPLACE FLOORING AND PAINT SPRINGERVILLE RANGER STATION (06) IN ACCORDANCE WITH ALL SPECIFICATIONS

CONTAINED HEREIN AND ALL DRAWINGS/PLANS:

BASE

ITEM #

DESCRIPTION OF PROJECT ITEMS

UNIT OF

MEASURE

EXTENDED AMOUNT

B1.1 Move furniture, chairs, desks, etc. LUMP SUM $

B2.1 Carpet prep, padding, installation, transition strips, rubber bases, etc.

LUMP SUM $

B3.1 Vinyl flooring prep, installation, etc. LUMP SUM $

B4.1 Prep and prime wall surfaces, caulk holes, paint, etc. LUMP SUM $

B5.1 Carpet, Carpet prep, padding, installation, transition strips, rubber bases, etc.

LUMP SUM $

TOTAL OF ALL BASE ITEMS - B1.1- B5.1 $

OPTIONAL

ITEMS

DESCRIPTION OF PROJECT ITEMS

UNIT OF

MEASURE

EXTENDED AMOUNT

O1.1 Remove / Dispose Wainscoting (Paneling), Repair and Paint Walls Behind Wainscoting, Lower Entrance Hall and Lower Main Hallway, only

LUMP SUM

NOTES:

PAYMENT FOR BOND PREMIUMS, IN ACCORDANCE WITH CLAUSE 52.232-5, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS, SHALL NOT BE IN ADDITION TO THE CONTRACT PRICE. INCLUDE BOND COST PAYMENTS

WEIGHTED ACCORDINGLY TO THE BASE LINE ITEMS.

PAYMENT WILL BE MADE ON ACTUAL WORK PERFORMED AS DESCRIBED IN FP-03 109.01 UNLESS OTHERWISE NOTED.

VERIFY YOUR OFFER BY COMPLETING THE FOLLOWING:

VENDOR COMPANY NAME: __________________________________ DUNS# _______________________

BUSINESS EMAIL ADDRESS: __________________________________________________

AUTHORIZED TO SIGN (NAME): _______________________________________________

SIGNATURE: _______________________________________ DATE:__________________________

SITE VISIT SCHEDULED FOR MARCH 29, 2017, 10:00 A.M., 165 S. Mountain Avenue, Springerville, AZ 85938

CONSTRUCTION RFQ 4 | P a g e SOL NO. AG-8173-S-17-0012

CHECKLIST OF MINIMUM REQUIREMENTS

TO RESPOND TO THIS REQUEST FOR QUOTATIONS (RFQ)

_____ Respond with the complete RETURN PACKAGE (SEE SECTION M for Evaluation Criteria)

_____ Have active vendor record for the DUNS number above in the System for Award Management (SAM) https://www.sam.gov

SECTION C – STATEMENT OF WORK/DESCRIPTIONS

C1.0 – GENERAL DESCRIPTION OF WORK

The Contractor shall furnish all supervision, materials, equipment and vehicles, tools, parts, labor, transportation, lodging, and miscellaneous items to install flooring and painting at the location designated by the Contracting Officer in accordance with industry standards and all terms and conditions contained herein.

This project consists of painting walls and ceilings, installation of new resilient (vinyl) plank flooring and carpeting in the areas (floors, walls, and ceilings) indicated on the drawings on include all necessary preparation of those surfaces to as required by the enclosed specifications, manufacturers installation or application instructions, and industry standards. The Springerville Ranger Station building is a two story building with grade access to each level. This statement of work also includes an optional item, as stated.

The Government intends to award a contract to the offeror that provides the best value. In order to remain in the competitive range, Offerors (Contractors) shall submit the Return Package with the requirements in Section M, Evaluation Factors.

PAYMENT AND PERFORMANCE BONDS

The Contractor shall obtain and submit performance and payment bonds, in the full amount of the contract. The Contractor will not be allowed to proceed with the work until the bonds are approved and Notice-To-Proceed is issued in writing. In accordance with clause 52.232-5, payment for Bond Premiums shall not be in addition to the awarded contract price.

Include the cost of bond premiums, weighted accordingly, in the base line items.

No changes to the specifications, terms, or conditions of this Request For Quotations (RFQ) without the prior approval of the Contracting Officer in writing.

PROJECT TECHNICAL POINT-OF-CONTACT: James Morrison, PROJECT ENGINEER, (928) 333-6273

C2.0 - LOCATION OF PROJECT

The project is located at the Springerville Ranger District Office, 165 S. Mountain Blvd., Springerville, AZ 85938, Apache County. This building has two floors which comprise the project in its entirety.

https://www.sam.gov/

CONSTRUCTION RFQ 5 | P a g e SOL NO. AG-8173-S-17-0012

C3.0 - SPECIFIC SCOPE OF WORK

C3.1- BASE BID -- FLOORING

The Contractor shall furnish all labor, materials, equipment, and all else required to install Wood Vinyl or Interlocking Resilient Plank Flooring, carpet, carpet padding, rubber cove base.

The Contractor is responsible for the temporary moving and/or relocating of desks, shelving, furniture, chairs, boxes, and any other items that inhibit the installation of the flooring. Permanently fixed items, such as the front desk of the main entry to the district office, do not have to be moved and installation can occur in and around these pieces. All items must be returned to their original location and condition upon completion of the work.

All carpeting shall be installed over new minimum 3/8 inch thick rebond carpet padding. The padding shall have the Green Label certification.

Vinyl Plank Flooring shall be Mannington product number AW513, Adura Plank, 4 inch x 36 inch x .1.5 inch (4 mm) thick plank, Essex Oak, Color: Harvest. An alternate is Product Number AW531, Adura Coolibah Burlwood, Color: Clove, also in 4 inch x 36 inch x .157 inch. The contractor may submit an equivalent alternative flooring for approval. Installation of this flooring and all other required materials for the complete installation shall be in accordance to the manufacturer's installation instructions and recommendations for installing over existing flooring and/or subflooring.

An extra twenty square foot of linoleum material shall be turned over to the Contracting Officer.

Existing doors shall be adjusted accordingly to maintain clearances above new flooring.

The Contractor shall remove and replace existing rubber, vinyl, or wood base boards with a 4 inch Armstrong integrated rubber wall base, or approved equal, where new flooring is being placed. Specific color is 01 Malt. If cove bases and/or base boards do not exist, Contractor shall install new rubber wall base at all locations where new flooring is being placed. Indicated on the drawings are locations of wall applied wire molding for communications wiring.

These wire molds are close to the floor; a full height cover base will not fit between the floor and the underside of the cable trays. In these locations, the contractor should cut down the cove base to fit. Otherwise, installation shall be in accordance to the manufacturer's installation instructions and recommendations.

CONSTRUCTION RFQ 6 | P a g e SOL NO. AG-8173-S-17-0012

Existing transition strips shall be removed and replaced with 1 inch aluminum transition strips at all entries to offices and hallways transitions. This also includes offices whose flooring is to remain as is. Where transition strips do not exist at typical transition locations, the Contractor shall provide and install the strips. Where greater than ½ inch vertical drop is encountered, the Contractor shall install transition strips with a 3:1 horizontal to vertical slope to eliminate trip hazards.

The warranty of this work shall be for one year from final acceptance.

C3.1.1- REQUIRED SUBMITTALS FOR FLOORING

Required submittals of all flooring related base bid work include:

1) Carpet and Carpet Padding Product Data and Sample

2) Vinyl Plank Product Data and Sample

3) Rubber Base Product Data and Sample

4) Work Schedule Plan; in phases

The Contracting Officer may request additional submittals, as necessary.

C3.2 – BASE BID -- PAINTING

The Contractor shall provide all labor, materials, equipment, and all else required to prep, prime, and paint the walls, as indicated in the drawings and described here within. Painting shall include the ceilings. The upper floor ceilings are predominantly glued ceiling tiles. The lower floor ceilings are predominantly wall board / drywall. Wood paneling and finishes shall not be painted. The paint color shall be Sherwin Williams SW 7003 Toque White, or approved equal. The final finish shall be Satin. A minimum of one coat of primer and two coats of finish shall be applied.

The Contractor shall provide a one quart can of extra paint of the same batch for the painting. This shall be turned over to the Contracting Officer upon completion of the work.

The warranty of this work shall be for one year from final acceptance.

C3.2.1- REQUIRED SUBMITTALS FOR PAINTING

Required submittals of all work include:

1) 1' x 1' sample of Satin finish with final paint color

The Contracting Officer may request additional submittals, as necessary.

C3.2.2 - PAINT SPECIFICATIONS

PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED

Prior to surface preparation and coating applications, remove, mask, or otherwise protect, hardware, hardware accessories, machined surfaces, radiator covers, plates, lighting fixtures, public and private property, and other such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, workmen skilled in the trades involved shall reinstall removed items. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.

PACKAGING, LABELING, AND STORING See Section D

CONSTRUCTION RFQ 7 | P a g e SOL NO. AG-8173-S-17-0012

ENVIRONMENTAL CONDITIONS

Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation. Isolate areas of application from rest of building when applying high-emission paints or coatings.

Coatings

Do not apply coating when air or substrate conditions are:

(1) Less than 5 degrees F above dew point;

(2) Below 50 degrees F or over 95 degrees F, unless specifically preapproved by the Contracting Officer and the product manufacturer.

Under no circumstances shall application conditions exceed manufacturer recommendations.

SURFACE PREPARATION WITH EXISTING COATINGS

Sand, spackle, and treat minor defects to render them smooth. Minor defects are defined as scratches, nicks, cracks, gouges, spalls, alligator cracking, chalking, and irregularities due to partial peeling of previous coatings.

Remove chalking by sanding so that when tested in accordance with ASTM 04214, the chalk rating is not less than

8. New, proposed coatings shall be compatible with existing coatings.

SURFACE CONDITION

Surfaces shall be clean, dry to the touch, and free from frost and moisture; remove grease, oil, wax, lacquer, paint, defective backstop, or other foreign matter that would prevent or impair adhesion. Where adequate grooves have not been provided, clean out to a depth of 1/2 inch and grind to a minimum width of 1/4 inch without damage to adjoining work. Grinding shall not be required on metal surfaces.

SURFACE PREPARATION

Remove dirt, splinters, loose particles, grease, oil, and other foreign matter and substances deleterious to coating performance as specified for each substrate before application of paint or surface treatments. Oil and grease shall be removed prior to mechanical cleaning. Cleaning shall be programmed so that dust and other contaminants will not fall on wet, newly painted surfaces. Exposed ferrous metals such as nail heads on or in contact with surfaces to be painted with water-thinned paints, shall be spot-primed with a suitable corrosion-inhibitive primer capable of preventing flash rusting and compatible with the coating specified for the adjacent areas.

PRIMER AND BOND BREAKER

Install the type recommended by the sealant manufacturer.

COATING SYSTEMS

a. Systems by Substrates: Apply coatings that conform to the respective specifications listed in the following

Tables: Division 9: Interior Plaster, Gypsum Board, Textured Surfaces Paint Table.

CONSTRUCTION RFQ 8 | P a g e SOL NO. AG-8173-S-17-0012

b. Minimum Dry Film Thickness (DFT): Apply paints, primers, varnishes, enamels, undercoats, and other coatings to a minimum dry film thickness of 1.5 mil each coat unless specified otherwise in the Tables.

c. Coating thickness where specified, refers to the minimum dry film thickness. Coatings for Surfaces Not

Specified Otherwise: Coat surfaces which have not been specified, the same as surfaces having similar conditions of exposure.

d. Existing Surfaces Damaged During Performance of the Work, Including New Patches on Existing Surfaces: Coat surfaces with the following:

(1) One coat of primer.

(2) One coat of undercoat or intermediate coat.

(3) One topcoat to match adjacent surfaces.

e. Existing Coated Surfaces to Be Painted: Apply coatings conforming to the respective specifications listed in the Tables herein, except that pretreatments, sealers and fillers need not be provided on surfaces where existing coatings are soundly adhered and in good condition. Do not omit undercoats or primers.

C3.3 – OPTION ITEM:

The Contractor shall provide all labor, materials, equipment, and all else required to remove the wainscoting (paneling) along the walls of the lower entrance hall and lower main hallway of the building. The contractor will dispose of this material and trim. In the place of the wainscoting, the contractor will prep, prime, and paint the walls, as indicated in the drawings and described here within. The paint color will match the color used for painting the walls and ceilings.

The final finish shall be Satin. A minimum of one coat of primer and two coats of finish shall be applied.

SECTION D – PACKAGING AND MARKING

PACKAGING, LABELING, AND STORING

Paints shall be in sealed containers that legibly show the contract specification number, designation name, formula or specification number, batch number, color, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name and address of manufacturer.

Pigmented paints shall be furnished in containers not larger than 5 gallons. Paints and thinners shall be stored in accordance with the manufacturer's written directions, and as a minimum, stored off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors, and at temperatures between 40 to 95 degrees F. Do not store paint, polyurethane, varnish, or wood stain products with materials that have a high capacity to adsorb VOC emissions. Do not store paint, polyurethane, varnish, or wood stain products in occupied spaces.

DIVISION 9: INTERIOR PLASTER, GYPSUM BOARD, TEXTURED SURFACES PAINT TABLE

New and existing, previously painted Wallboard not otherwise specified:

A. Latex, New; MPI INT 9.2A-G2 (Flat) / Existing; RIN 9.2A-G2 (Flat) Primer: Intermediate: Topcoat:

MPI 50 MPI 44 MPI 44

System DFT: 4 mils

B. New; MPI INT 9.2A-G3 (Eggshell) / Existing; RIN 9.2A-G3 (Eggshell)

MPI 50 MPI 52 MPI 52

System OFT:4 mils

CONSTRUCTION RFQ 9 | P a g e SOL NO. AG-8173-S-17-0012

C. New; MPI INT 9.2A-GS (Semigloss) / Existing; RIN 9.2A-GS (Semigloss)

MPI 50 MPI 54 MPI 54

System OFT:4 mils

SECTION E – INSPECTION AND ACCEPTANCE

FAR 52.246-12 INSPECTION OF CONSTRUCTION. (APR 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not --

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may --

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the

CONSTRUCTION RFQ 10 | P a g e SOL NO. AG-8173-S-17-0012

Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

(End of Clause)

SECTION F – DELIVERIES OR PERFORMANCE

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar day after the date the Contractor receives notice-to-proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days from issuance of notice-to-proceed. The time stated for completion shall include final cleanup of the premises.

AGAR 452.236-75 MAXIMUM WORK WEEK – CONSTRUCTION SCHEDULE (NOV 1996)

Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:

(a) A schedule as required by FAR 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work

The maximum workweek shall be 6 days per week, Monday through Saturday, from 6:00 AM to 6:00 PM. The intent is to be able to accomplish critical work over the weekend to prevent the district from closing the front lobby to the public. Any change in the work schedule shall be approved in writing by the Contracting Officer prior to commencement. The Contractor shall phase the project into sections of the building that will least interrupt the working tenants, and shall be included in the Contractor’s proposed schedule.

CONSTRUCTION RFQ 11 | P a g e SOL NO. AG-8173-S-17-0012

SECTION G – CONTRACT ADMINISTRATIVE DATA

GOVERNMENT FURNISHED PROPERTY, MATERIALS, SERVICES

The property and services that will be provided by the Government are as follows: None

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H1.0 BIO-PREFERRED INFORMATION

Bio-Preferred

USDA’s website for Bio-Preferred: http://www.biopreferred.gov/

Product categories: http://www.biopreferred.gov/ProductCategories.aspx

Federal Purchasing Requirement: http://www.biopreferred.gov/PurchasingBiobased.aspx

Federal vendor/contractor reporting requirements: http://www.biopreferred.gov/FARReporting.aspx http://www.biopreferred.gov/ http://www.biopreferred.gov/ProductCategories.aspx http://www.biopreferred.gov/PurchasingBiobased.aspx http://www.biopreferred.gov/FARReporting.aspx

CONSTRUCTION RFQ 12 | P a g e SOL NO. AG-8173-S-17-0012

PART II – SECTION I – CONTRACT CLAUSES

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/vffara.htm http://farsite.hill.af.mil/vfagara.htm

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.204-4 Printed or Copied Double-Sided on Recycled Paper (MAY 2011) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records -- Negotiation (OCT 2010) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns (OCT 2014) 52.219-14 Limitations on Subcontracting (NOV 2011) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (MAY 2014) 52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-36 Equal Opportunity for Workers With Disabilities (JUL 2014) 52.222-37 Employment Reports on Veterans (FEB 2016) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.223-1 Biobased Product Certification (MAY 2012) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.225-1 Buy American—Supplies (MAY 2014) 52.225-9 Buy American—Construction Materials (MAY 2014) http://farsite.hill.af.mil/vffara.htm http://farsite.hill.af.mil/vfagara.htm

CONSTRUCTION RFQ 13 | P a g e SOL NO. AG-8173-S-17-0012

52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-5 Insurance – Work On A Government Installation (JAN 1997) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment (MAY 2014) 52.232-33 Payment by Electronic Funds Transfer –System for Award Management (JUL 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by The Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.243-5 Changes and Changed Conditions (APR 1981) 52.244-6 Subcontracts for Commercial Items (OCT 2016) 52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)--Alternate I (SEP 1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.211-73 Attachments to Statements of Work/Specifications 452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996) 452.236-78 Fire Suppression and Liability (MAY 2014)

CONSTRUCTION RFQ 14 | P a g e SOL NO. AG-8173-S-17-0012

52.223-1 BIOBASED PRODUCT CERTIFICATION (MAY 2012)

As required by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005 (7 U.S.C.

8102(c)(3)), the offeror certifies, by signing this offer, that biobased products (within categories of products listed by the United States Department of Agriculture in 7 CFR part 3201, subpart B) to be used or delivered in the performance of the contract, other than biobased products that are not purchased by the offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.

(End of provision)

52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS

(SEP 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United

States Department of Agriculture (USDA)-designated items unless—

(1) The product cannot be acquired—

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

(c) In the performance of this contract, the Contractor shall—

(1) Report to the environmental point of contact identified in paragraph (d) of this clause, with a copy to the

Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the

Contractor during the previous Government fiscal year, between October 1 and September 30;

(2) Submit this report no later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance; and

(3) Contact the environmental point of contact to obtain the preferred submittal format, if that format is not specified in this contract.

(d) The environmental point of contact for this contract is:

(End of clause)

52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)

(a) “Hazardous material,” as used in this clause, includes any material defined as hazardous under the latest version of

Federal Standard No. 313 (including revisions adopted during the term of the contract).

(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as

National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.

Material (If none, insert “None”) Identification No.

http://www.acquisition.gov/far/current/html/%20http:/uscode.house.gov/ http://www.acquisition.gov/far/current/html/%20http:/uscode.house.gov/ http://www.biopreferred.gov/

CONSTRUCTION RFQ 15 | P a g e SOL NO. AG-8173-S-17-0012

(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.

(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data

Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard

No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the

Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered non-responsible and ineligible for award.

(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.

(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.

(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.

(h) The Government’s rights in data furnished under this contract with respect to hazardous material are as follows:

(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to—

(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;

(ii) Obtain medical treatment for those affected by the material; and

(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.

(2) To use, duplicate, and disclose data furnished under this clause, in accordance with paragraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.

(3) The Government is not precluded from using similar or identical data acquired from other sources.

(End of clause)

52.225-9 BUY AMERICAN ACT - CONSTRUCTION MATERIALS. (MAY 2014)

(a) Definitions. As used in this clause - "Commercially available off-the-shelf (COTS) item"--

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.

"Component" means an article, material, or supply incorporated directly into a construction material.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when

CONSTRUCTION RFQ 16 | P a g e SOL NO. AG-8173-S-17-0012 or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

"Cost of components" means -

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

"Domestic construction material" means--

(1) An unmanufactured construction material mined or produced in the United States; (2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which non-availability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

"Foreign construction material" means a construction material other than a domestic construction material. "United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. (1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that -

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including -

(A) A description of the foreign and domestic construction materials; (B) Unit of

CONSTRUCTION RFQ 17 | P a g e SOL NO. AG-8173-S-17-0012 measure;

(C) Quantity; (D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act or Balance of Payments Program.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:

Foreign construction material Domestic construction material

Item 2:

Foreign construction material Domestic construction material

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

CONSTRUCTION RFQ 18 | P a g e SOL NO. AG-8173-S-17-0012

52.225-10 -- NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American--Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.228-13 -- ALTERNATIVE PAYMENT PROTECTIONS (JUL 2000)

(a) The Contractor shall submit one of the following payment protections:

CONSTRUCTION RFQ 19 | P a g e SOL NO. AG-8173-S-17-0012

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within ______ days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(End of Clause)

452.228-71 INSURANCE COVERAGE (NOV 1996)

Pursuant to FAR clause 52.228-5,…