sf-30 Amend 1.doc
DOC document 94 KB Posted
- Solicitation number
- AG-8173-S-08-0022
About this file
Amendment No. 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Retrun_Pkg_IDIQ_PJ.doc | DOC document | |
| RFP_IDIQ_PJ_ OtherSpecies.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 4 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| Amendment No. 1 |
| 07/25/2008 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
Apache-Sitgreaves National Forests
30 S. Chiricahua Dr. PO Box 640
Springerville, AZ 85938
Same as Item 6.
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
| FORMCHECKBOX |
AG-8173-S-08-0022
9B. DATED (SEE ITEM 11)
06/27/08
FORMCHECKBOX
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
FORMCHECKBOX
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
The purpose of this amendment is as follows:
I. Hand thinning and lopping of live and dead pinyon and juniper is changed from up to 12 inches DRC to up to16 inches DRC. The change is reflected in Items B.1.1 through B.1.7 on the attached replacement Page 2 on the Schedule.
II. Section C.1.1 Scope of Work on Page 8, first paragraph, last sentence is changed to read “Some projects may also include units of Ponderosa pine or mixed conifer species up to a maximum of no more than 100 acres of trees total per Task Order.”
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| WARREN ABBOTT, Contracting Officer |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
III. Section C.1.3.1 Detailed Unit Information on Page 9: Paragraph 2, last sentence listing species which may be cut shall be changed to add “Oak and Manzanita/Chapparal shrub species.” Paragraph 3, 3rd sentence shall read, “Maximum cut bole diameter will vary by task order, but will not exceed 12 inches DBH for ponderosa pine and mixed conifer and shall not exceed 16 inches DRC for pinyon/juniper.”
Iv. Section C.1.5. - OPTIONAL: Salvage Rights on Page, Item C.1.5.1., first sentence is now changed to read “If requested, slash may become salvage material available to the Contractor at district minimum salvage rates, with approval by the Contracting Officer; when other contract work is progressing as scheduled; and removal will be completed prior to expiration of the Task Order contract time. If certain slash material is determined by the Government to have no market value, the contractor will not be charged salvage rates.”
V. A pre-proposal meeting/site visit was held at the Supervisor’s Office in Springerville on July 22, 2008, at 9:30 A.M. The attendance roster is attached:
PART I – THE SCHEDULE
SECTION B – SERVICES AND PRICES
B. 1. Contract Line Items:
Zone 1 = Alpine RD Zone 2 = Black Mesa RD Zone 3 = Clifton RD Zone 4 = Lakeside RD
Zone 5 = Springerville RD
| Item No. |
| Description |
| Unit |
| Est Qty |
| Unit Price |
Zone 1
Unit Price
Zone 2
Unit Price
Zone 3
Unit Price
Zone 4
Unit Price
Zone 5
| B.1.1 |
| Hand thin and lop live and dead pinyon and juniper up to 16 inches DRC |
| Acre |
| IDIQ |
| Low:$______ |
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____
| B.1.2 |
| Hand thin live and dead pinyon and juniper up to 16 inches DRC. Hand pile all slash. |
| Acre |
| IDIQ |
| Low:$______ |
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____
| B.1.3 |
| Thin and remove live and dead pinyon and juniper up to 16 inches DRC; Remove all slash |
| Acre |
| IDIQ |
| Low:$______ |
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____
| B.1.4 |
| Thin and remove live and dead pinyon and juniper up to 16 inches DRC; Hand pile slash |
| Acre |
| IDIQ |
| Low:$______ |
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____
| B.1.5 |
| Thin and remove live and dead pinyon and juniper up to 16 inches DRC; Machine pile slash |
| Acre |
| IDIQ |
| Low:$______ |
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____
| B.1.6 |
| Thin and masticate live and dead pinyon and juniper up to 16 inches DRC |
| Acre |
| IDIQ |
| Low:$______ |
Med:$______
High:$_____ Low:$______
Med:$______
High:$______ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____
| B.1.7 |
| Thin and chip live and dead pinyon and juniper up to 16 inches DRC |
| Acre |
| IDIQ |
| Low:$______ |
Med:$______
High:$_____ Low:$______
Med:$______
High:$______ Low:$______
Med:$______
High:$______ Low:$______
Med:$______
High:$_____ Low:$______
Med:$______
High:$_____
FOREST SERVICE PERSONNEL:
Anne Weiskircher, Contract Specialist
Gayle Richardson, COR
Jerry Drury, Forest Silviculturist
Dan Mindar, District Fuels Specialist
Monica Boehning, COR/Silviculturist
Lance Barnum, COR
Judy Palmer, Fire Management Officer
Rusty Bigelow, District Fuels Specialist
Jim Pitts
VENDORS:
Matt Mueller
Phil Estill
Western Brushredding
P.O. Box 539
Vernon, AZ 85940
Robert Winders
Robert Winders Contracting Inc.
8778 Leah Lane
Flagstaff, AZ 86004
Joe Sullivan
Sullivan Logging Co.
P.O. Box 1382
Idyllwild, CA 92549
Joel Pelayo Pelayo Logging
8070 Fair Pines Lane
Garden Valley, CA 95633
Molly Pitts
NAWPA
P.O. Box 934
Eagar, AZ 85925
J. Nelson
Summitt Forests Inc.
1257 Siskiyou Blvd.
PMB 218 Ashland, OR 97520
Ervin Earl
Earl’s Logging
P.O. Box T
Lakeside, AZ 85929
Richard Kauffman
Kauffman Enterprises LLC
6639 Bandido Way
Show Low, AZ 85901
Bill Curtis
Resource Management Specialist
P.O. Box 482
Eagar, AZ 85925
Herb Orona
WMTP
P.O. Box 1404
Springerville, AZ 85938
David DeVere
Cooley Forest Products
P.O. Box 499
Lakeside, AZ 85929
Pedro Munoz
Munoz Forestry LLC
P.O. Box 3864
Show Low, AZ 85902
Russell Hatcher
Renegy, LLC
60 E. Rio Salado Pkwy #1012
Tempe, AZ 85281-9124
Martin Acuna
Acuna Thinning & Planting
1880 N. 22nd Dr.
Show Low, AZ 85901
Larry Ethelbah
L.E. Enterprises
P.O. Box 1009
Pinetop, AZ 85935
Dwayne Walker
Apache Cornerstone
1630 E. White Mountain Road
Suite C3
Pinetop, AZ 85935
File details come from the government source that posted it. Updated .