Amendment_2.pdf

PDF 166 KB Posted

Attached to
Bank Stabilization - EWP - Hidalgo County Irrigation District # 6 Federal contract opportunity
Solicitation number
AG-7442-S-12-0090
Issued by
Department of Agriculture National Resources Conservation Service

About this file

Question and answer

View the file

Other files for this federal contract opportunity

Other files attached to Bank Stabilization - EWP - Hidalgo County Irrigation District # 6, newest first.
File Type Posted
HCID_6_long_abstract.xlsx XLSX spreadsheet
Revised_Bid_Schedule.pdf PDF
Amendment_1.pdf PDF
Hidalgo_County_6-006.pdf PDF
Hidalgo_County_6-004.pdf PDF
TX8_dvb.mht MHT file
Hidalgo_County_6-000.pdf PDF
Hidalgo_County_6-007.pdf PDF
Hidalgo_County_6-002.pdf PDF
Hidalgo_County_6-001.pdf PDF
Hidalgo_County_6-005.pdf PDF
HCID6_EWP_SP.pdf PDF
SWPPP_09-21-12.pdf PDF
Hidalgo_County_6-003.pdf PDF
AG-7442-S-12-0090.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Amend 1.pdf
Special Contract Requirements
All Bid Items and specifications reviewed.
5. List of Individuals or Firms Attending Site Showing:
Amend 1.pdf
Special Contract Requirements
All Bid Items and specifications reviewed.
5. List of Individuals or Firms Attending Site Showing:
Amend 1.pdf
Special Contract Requirements
All Bid Items reviewed.
5. List of Individuals or Firms Attending Site Showing:
Amend 1.pdf
Special Contract Requirements
All Bid Items reviewed.
5. List of Individuals or Firms Attending Site Showing:
Amend 1.pdf
Special Contract Requirements
SPECIFICATIONS
MOBILIZATION AND DEMOBILIZATION 8
CONTRACTOR QUALITY CONTROL 94
GEOTEXTILE 95
5. List of Individuals or Firms Attending Site Showing:
Amend 1.pdf
Special Contract Requirements
MOBILIZATION AND DEMOBILIZATION 8
CONTRACTOR QUALITY CONTROL 94
GEOTEXTILE 95
5. List of Individuals or Firms Attending Site Showing:
Amend 1.pdf
Special Contract Requirements
5. List of Individuals or Firms Attending Site Showing:
Attachment 1 to Amendment 1.pdf
10. Items of Work and Construction Details
Amend 1.pdf
Special Contract Requirements
5. List of Individuals or Firms Attending Site Showing:
Revised Bid Schedule.pdf
One award for the aggregate of all Items will be made under this solicitation. Description/Specifications
452.211-72 Statement of Work/Specifications. (FEB 1988)
452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)
Packaging and Marking
Inspection and Acceptance
52.246-12 Inspection of Construction. (APR 1996)
Deliveries or Performance
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
452.211-74 Period of Performance. (FEB 1988)
Contract Administration Data
Special Contract Requirements
52.236-26 Preconstruction Conference. (FEB 1995)
452.215-73 Postaward Conference. (NOV 1996)
452.236-73 Archaeological or Historic Sites. (FEB 1988)
452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)
452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996)
452.236-76 Samples and Certificates. (FEB 1988)
Contract Clauses
52.202-1 Definitions. (JUL 2004)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (APR 1984)
52.203-7 Anti-Kickback Procedures. (OCT 2010)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (JAN 1997)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (JAN 1997)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)
52.204-4 Printed or Copied Double-Sided on Recycled Paper. (AUG 2000)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (DEC 2010)
52.214-26 Audit and Records - Sealed Bidding. (OCT 2010)
52.214-27 Price Reduction for Defective Certified Cost or Pricing Data - Modifications - Sealed Bidding. (OCT 2010)
52.214-28 Subcontractor Certified Cost or Pricing Data - Modifications - Sealed Bidding. (OCT 2010)
52.214-29 Order of Precedence - Sealed Bidding. (JAN 1986)
52.219-6 Notice of Total Small Business Set-Aside (JUN 2003)
52.219-8 Utilization of Small Business Concerns. (JAN 2011)
52.222-3 Convict Labor. (JUN 2003)
52.222-54 Employment Eligibility Verification. (JAN 2009)
52.223-3 Hazardous Material Identification and Material Safety Data. (JAN 1997)
52.223-6 Drug-Free Workplace. (MAY 2001)
52.223-14 Toxic Chemical Release Reporting. (AUG 2003)
52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)
52.227-1 Authorization and Consent. (DEC 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (DEC 2007)
52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)
52.228-2 Additional Bond Security. (OCT 1997)
52.228-11 Pledges of Assets. (SEP 2009)
52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995)
52.228-13 Alternative Payment Protections. (JUL 2000)
52.228-14 Irrevocable Letter of Credit. (DEC 1999)
52.228-15 Performance and Payment Bonds - Construction. (OCT 2010)
52.229-3 Federal, State, and Local Taxes. (APR 2003)
52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002)
52.232-16 Progress Payments. (JUL 2009)
52.232-17 Interest. (OCT 2010)
52.232-23 Assignment of Claims. (JAN 1986) - Alternate I (APR 1984)
52.232-27 Prompt Payment For Construction Contracts. (OCT 2008)
52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (OCT 2003)
52.233-1 Disputes. (JUL 2002)
52.233-3 Protest after Award. (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)
52.236-2 Differing Site Conditions. (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)
52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
52.236-12 Cleaning Up. (APR 1984)
52.236-15 Schedules for Construction Contracts. (APR 1984)
52.236-16 Quantity Surveys. (APR 1984)
52.236-17 Layout of Work. (APR 1984)
52.236-21 Specifications and Drawings for Construction. (FEB 1997)
52.239-1 Privacy or Security Safeguards. (AUG 1996)
52.242-13 Bankruptcy. (JUL 1995)
52.243-4 Changes. (JUN 2007)
52.244-6 Subcontracts for Commercial Items. (DEC 2010)
52.248-3 Value Engineering - Construction. (OCT 2010) - Alternate I (APR 1984)
52.249-2 Termination for Convenience of the Government (Fixed-Price). (MAY 2004) - Alternate I (SEP 1996)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.253-1 Computer Generated Forms. (JAN 1991)
52.225-9 Buy American Act - Construction Materials. (SEP 2010)
52.225-10 Notice of Buy American Act Requirement - Construction Materials. (FEB 2009)
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
(End of clause)
52.252-4 Alterations in Contract. (APR 1984)
452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996)
List of Documents, Exhibits and Other Attachments
Per FAR Part 28.106-1 the following Forms must be used:
1. Bid Bond – Standard Form 24*
2. Performance Bond – Standard Form 25
3. Payment Bond – Standard Form 25A
These forms are available from:
http://www.gsa.gov/portal/forms/type/TOP
* You may also use a certified check or Irrevocable Letter of Credit for your bid bond.
(5) Estimated Period of Performance 1 page Representations, Certifications, and Other Statements of Bidders
52.222-21 Prohibition of Segregated Facilities. (FEB 1999)
52.204-8 Annual Representations and Certifications. (JAN 2011)
Instructions, Conditions, and Notices to Bidders
52.204-6 Data Universal Numbering System (DUNS) Number. (APR 2008)
52.204-7 Central Contractor Registration. (APR 2008)
52.214-3 Amendments to Invitations for Bids. (DEC 1989)
52.214-4 False Statements in Bids. (APR 1984)
52.214-5 Submission of Bids. (MAR 1997)
52.214-6 Explanation to Prospective Bidders. (APR 1984)
52.214-7 Late Submissions, Modifications, and Withdrawals of Bids. (NOV 1999)
52.214-18 Preparation of Bids - Construction. (APR 1984)
52.214-19 Contract Award - Sealed Bidding - Construction. (AUG 1996)
52.214-34 Submission of Offers in the English Language (APR 1991)
52.214-35 Submission of Offers in U.S. Currency. (APR 1991)
52.211-4 Availability for Examination of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions. (JUN 1988)
52.216-1 Type of Contract. (APR 1984)
52.228-1 Bid Guarantee. (SEP 1996)
52.233-2 Service of Protest. (SEP 2006)
52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995)
452.204-70 Inquiries. (FEB 1988)
452.219-70 Size Standard and NAICS Code Information. (SEP 2001)
452.228-70 Alternative Forms of Security. (NOV 1996)
Evaluation Factors for Award
Amend 1.pdf
Special Contract Requirements
SPECIFICATIONS
MOBILIZATION AND DEMOBILIZATION 8
TIMBER FABRICATION AND INSTALLATION 83
CONTRACTOR QUALITY CONTROL 94
GEOTEXTILE 95
5. List of Individuals or Firms Attending Site Showing:
Amend 1.pdf
Special Contract Requirements
SPECIFICATIONS
MOBILIZATION AND DEMOBILIZATION 8
METAL FABRICATION AND INSTALLATION 81
CONTRACTOR QUALITY CONTROL 94
GEOTEXTILE 95
5. List of Individuals or Firms Attending Site Showing:
Amend 1.pdf
(d) Subsidiary Item, Piling
(1) This item shall consist of furnishings and installing the piles for the timber headwalls as shown on the drawings.
(a) Section 2, Material does not apply.
(b) Spacing of piles shall be a maximum of 3’– 4” (on center), or as indicated on the drawings.
(c) Pilings shall be one of the following materials:
(I) New steel pipe shall be either ASTM A53 10-inch diameter, schedule 40 or ASTM A252 grade 1, 10.750-inch outside diameter, 0.365-inch minimum wall thickness.
(II) New cold-formed steel structural tubing (seamless or welded) shall be ASTM A500 grade D, 10.750-inch outside diameter, 0.365-inch minimum wall thickness.
(III) New hot-formed steel structural tubing (seamless or welded) shall be ASTM A501 10.750-inch outside diameter, 0.365-inch minimum wall thickness.
(IV) New hot-formed low alloy structural tubing (seamless or welded) shall be ASTM A618 grade Ia, Ib, or II; round, 10.750-inch outside diameter, 0.365-inch minimum wall thickness.
(V) Used steel pipe or tubing shall have an outside diameter of 10.750-inch, minimum wall thickness of 0.365-inch, and weigh a minimum of 40 pounds per foot. Used steel pipe shall also be free of excessive rust pits and other flaws that would reduce t...
(e) After a pile has been installed to the required depth, it shall be field cut to no more than two inches above the finished top elevation of the headwall, unless otherwise indicated on the construction drawings. Holes required for the installation...
(g) Separate payment will not be made for this item of work. Compensation for this item will be included in the payment for the bid item Timber Headwalls.
Special Contract Requirements
SPECIFICATIONS
MOBILIZATION AND DEMOBILIZATION 8, Bid Item 3, Additive Items 13 and 18. In Section 3 PAYMENT it states, "Payment will be made as the work proceeds, after presentation of paid invoices ... by the Contractor showing specific mobilization and demobiliz...
METAL FABRICATION AND INSTALLATION 81. Subsidiary Items, Walers and Anchors - This item requires all work to furnish, fabricate and install the metal whalers, anchors and plates as specified on the construction drawings. 25% of anchor will be random...
TIMBER FABRICATION AND INSTALLATION 83, Additive Bid Item 14, Timber Headwall. This item requires all work to furnish all material and install the timber headwall and culvert support as specified on the plans. Sheet 12 of the plans show details of con...
CONTRACTOR QUALITY CONTROL 94. Subsidiary item to Steel Sheet Piling, Timber Headwall, and Site Preparation. In Sections 3 and 4, Method 1 shall be used. Names of quality control personnel and their duties, qualifications, certifications, and author...
GEOTEXTILE 95. Subsidiary item to Rock Riprap and Timber Headwall. Class I non-woven geotextile is required and is to be placed as specified on the construction drawings.
FLOWABLE FILL 424. Subsidiary item to rock riprap. This item includes the furnishing and installation of flowable fill, as well as, the installation of the sponsor provided plastic pipes. See sheet 6 for flowable fill and pipe details. The design ...
5. List of Individuals or Firms Attending Site Showing:
Revised Bid Schedule.pdf
One award for the aggregate of all Items will be made under this solicitation. Description/Specifications
452.211-72 Statement of Work/Specifications. (FEB 1988)
452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)
Packaging and Marking
Inspection and Acceptance
52.246-12 Inspection of Construction. (APR 1996)
Deliveries or Performance
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
52.242-14 Suspension of Work. (APR 1984)
(End of clause)
452.211-74 Period of Performance. (FEB 1988)
Contract Administration Data
Special Contract Requirements
52.236-26 Preconstruction Conference. (FEB 1995)
452.215-73 Postaward Conference. (NOV 1996)
452.236-73 Archaeological or Historic Sites. (FEB 1988)
452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)
452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996)
452.236-76 Samples and Certificates. (FEB 1988)
Contract Clauses
52.202-1 Definitions. (JAN 2012)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (APR 1984)
52.203-7 Anti-Kickback Procedures. (OCT 2010)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (JAN 1997)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (JAN 1997)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (DEC 2010)
52.214-26 Audit and Records - Sealed Bidding. (OCT 2010)
52.214-27 Price Reduction for Defective Certified Cost or Pricing Data - Modifications - Sealed Bidding. (OCT 2010)
52.214-28 Subcontractor Certified Cost or Pricing Data - Modifications - Sealed Bidding. (OCT 2010)
52.214-29 Order of Precedence - Sealed Bidding. (JAN 1986)
52.219-6 Notice of Total Small Business Set-Aside (JUN 2003)
52.222-3 Convict Labor. (JUN 2003)
52.222-54 Employment Eligibility Verification. (JAN 2009)
52.223-3 Hazardous Material Identification and Material Safety Data. (JAN 1997)
52.223-6 Drug-Free Workplace. (MAY 2001)
52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)
52.227-1 Authorization and Consent. (DEC 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (DEC 2007)
52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)
52.228-2 Additional Bond Security. (OCT 1997)
52.228-11 Pledges of Assets. (SEP 2009)
52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995)
52.228-13 Alternative Payment Protections. (JUL 2000)
52.228-14 Irrevocable Letter of Credit. (DEC 1999)
52.228-15 Performance and Payment Bonds - Construction. (OCT 2010)
52.229-3 Federal, State, and Local Taxes. (APR 2003)
52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002)
52.232-16 Progress Payments. (AUG 2010)
52.232-17 Interest. (OCT 2010)
52.232-23 Assignment of Claims. (JAN 1986) - Alternate I (APR 1984)
52.232-27 Prompt Payment For Construction Contracts. (OCT 2008)
52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (OCT 2003)
52.233-1 Disputes. (JUL 2002)
52.233-3 Protest after Award. (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)
52.236-2 Differing Site Conditions. (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)
52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
52.236-12 Cleaning Up. (APR 1984)
52.236-15 Schedules for Construction Contracts. (APR 1984)
52.236-16 Quantity Surveys. (APR 1984)
52.236-17 Layout of Work. (APR 1984)
52.236-21 Specifications and Drawings for Construction. (FEB 1997)
52.239-1 Privacy or Security Safeguards. (AUG 1996)
52.242-13 Bankruptcy. (JUL 1995)
52.243-4 Changes. (JUN 2007)
52.244-6 Subcontracts for Commercial Items. (DEC 2010)
52.248-3 Value Engineering - Construction. (OCT 2010) - Alternate I (APR 1984)
52.249-2 Termination for Convenience of the Government (Fixed-Price). (MAY 2004) - Alternate I (SEP 1996)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.253-1 Computer Generated Forms. (JAN 1991)
52.219-14 Limitations on Subcontracting. (Nov 2011)
52.225-9 Buy American Act—Construction Materials. (Sep 2010)
52.225-10 Notice of Buy American Act Requirement - Construction Materials. (FEB 2009)
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
(End of clause)
52.252-4 Alterations in Contract. (APR 1984)
452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996)
List of Documents, Exhibits and Other Attachments
Per FAR Part 28.106-1 the following Forms must be used:
1. Bid Bond – Standard Form 24*
2. Performance Bond – Standard Form 25
3. Payment Bond – Standard Form 25A
These forms are available from:
http://www.gsa.gov/portal/forms/type/TOP
* You may also use a certified check or Irrevocable Letter of Credit for your bid bond. Representations, Certifications, and Other Statements of Bidders
52.222-21 Prohibition of Segregated Facilities. (FEB 1999)
52.204-8 Annual Representations and Certifications. (MAR 2012)
Instructions, Conditions, and Notices to Bidders
52.204-6 Data Universal Numbering System (DUNS) Number. (APR 2008)
52.214-3 Amendments to Invitations for Bids. (DEC 1989)
52.214-4 False Statements in Bids. (APR 1984)
52.214-5 Submission of Bids. (MAR 1997)
52.214-6 Explanation to Prospective Bidders. (APR 1984)
52.214-7 Late Submissions, Modifications, and Withdrawals of Bids. (NOV 1999)
52.214-18 Preparation of Bids - Construction. (APR 1984)
52.214-19 Contract Award - Sealed Bidding - Construction. (AUG 1996)
52.214-34 Submission of Offers in the English Language (APR 1991)
52.214-35 Submission of Offers in U.S. Currency. (APR 1991)
52.211-4 Availability for Examination of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions. (JUN 1988)
52.216-1 Type of Contract. (APR 1984)
52.228-1 Bid Guarantee. (SEP 1996)
52.233-2 Service of Protest. (SEP 2006)
52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995)
452.204-70 Inquiries. (FEB 1988)
452.219-70 Size Standard and NAICS Code Information. (SEP 2001)
452.228-70 Alternative Forms of Security. (NOV 1996)
Evaluation Factors for Award
Amend 1.pdf
Special Contract Requirements
SPECIFICATIONS
MOBILIZATION AND DEMOBILIZATION 8, Bid Item 3. In Section 3 PAYMENT it states, "Payment will be made as the work proceeds, after presentation of paid invoices … by the Contractor showing specific mobilization and demobilization costs and supporting e...
CONTRACTOR QUALITY CONTROL 94. Subsidiary item to rock riprap and site preparation. In Sections 3 and 4, Method 1 shall be used. Names of quality control personnel and their duties, qualifications, certifications, and authorities are required and s...
GEOTEXTILE 95. Subsidiary item to Rock Riprap. Class I non-woven geotextile is required and is to be placed as specified on the construction drawings. Geotextile shall be fastened as specified in Section 5. Method 2.
5. List of Individuals or Firms Attending Site Showing:
Revised Bid Schedule.pdf
One award for the aggregate of all Items will be made under this solicitation. Description/Specifications
452.211-72 Statement of Work/Specifications. (FEB 1988)
452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)
Packaging and Marking
Inspection and Acceptance
52.246-12 Inspection of Construction. (APR 1996)
Deliveries or Performance
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
52.242-14 Suspension of Work. (APR 1984)
(End of clause)
452.211-74 Period of Performance. (FEB 1988)
Contract Administration Data
Special Contract Requirements
52.236-26 Preconstruction Conference. (FEB 1995)
452.215-73 Postaward Conference. (NOV 1996)
452.236-73 Archaeological or Historic Sites. (FEB 1988)
452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)
452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996)
452.236-76 Samples and Certificates. (FEB 1988)
Contract Clauses
52.202-1 Definitions. (JAN 2012)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (APR 1984)
52.203-7 Anti-Kickback Procedures. (OCT 2010)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (JAN 1997)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (JAN 1997)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (DEC 2010)
52.214-26 Audit and Records - Sealed Bidding. (OCT 2010)
52.214-27 Price Reduction for Defective Certified Cost or Pricing Data - Modifications - Sealed Bidding. (OCT 2010)
52.214-28 Subcontractor Certified Cost or Pricing Data - Modifications - Sealed Bidding. (OCT 2010)
52.214-29 Order of Precedence - Sealed Bidding. (JAN 1986)
52.219-6 Notice of Total Small Business Set-Aside (JUN 2003)
52.222-3 Convict Labor. (JUN 2003)
52.222-54 Employment Eligibility Verification. (JAN 2009)
52.223-3 Hazardous Material Identification and Material Safety Data. (JAN 1997)
52.223-6 Drug-Free Workplace. (MAY 2001)
52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)
52.227-1 Authorization and Consent. (DEC 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (DEC 2007)
52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)
52.228-2 Additional Bond Security. (OCT 1997)
52.228-11 Pledges of Assets. (SEP 2009)
52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995)
52.228-13 Alternative Payment Protections. (JUL 2000)
52.228-14 Irrevocable Letter of Credit. (DEC 1999)
52.228-15 Performance and Payment Bonds - Construction. (OCT 2010)
52.229-3 Federal, State, and Local Taxes. (APR 2003)
52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002)
52.232-16 Progress Payments. (AUG 2010)
52.232-17 Interest. (OCT 2010)
52.232-23 Assignment of Claims. (JAN 1986) - Alternate I (APR 1984)
52.232-27 Prompt Payment For Construction Contracts. (OCT 2008)
52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (OCT 2003)
52.233-1 Disputes. (JUL 2002)
52.233-3 Protest after Award. (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)
52.236-2 Differing Site Conditions. (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)
52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
52.236-12 Cleaning Up. (APR 1984)
52.236-15 Schedules for Construction Contracts. (APR 1984)
52.236-16 Quantity Surveys. (APR 1984)
52.236-17 Layout of Work. (APR 1984)
52.236-21 Specifications and Drawings for Construction. (FEB 1997)
52.239-1 Privacy or Security Safeguards. (AUG 1996)
52.242-13 Bankruptcy. (JUL 1995)
52.243-4 Changes. (JUN 2007)
52.244-6 Subcontracts for Commercial Items. (DEC 2010)
52.248-3 Value Engineering - Construction. (OCT 2010) - Alternate I (APR 1984)
52.249-2 Termination for Convenience of the Government (Fixed-Price). (MAY 2004) - Alternate I (SEP 1996)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.253-1 Computer Generated Forms. (JAN 1991)
52.225-9 Buy American Act—Construction Materials. (Sep 2010)
52.225-10 Notice of Buy American Act Requirement - Construction Materials. (FEB 2009)
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
(End of clause)
52.252-4 Alterations in Contract. (APR 1984)
452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996)
List of Documents, Exhibits and Other Attachments
Per FAR Part 28.106-1 the following Forms must be used:
1. Bid Bond – Standard Form 24*
2. Performance Bond – Standard Form 25
3. Payment Bond – Standard Form 25A
These forms are available from:
http://www.gsa.gov/portal/forms/type/TOP
* You may also use a certified check or Irrevocable Letter of Credit for your bid bond. Representations, Certifications, and Other Statements of Bidders
52.222-21 Prohibition of Segregated Facilities. (FEB 1999)
52.204-8 Annual Representations and Certifications. (MAR 2012)
Instructions, Conditions, and Notices to Bidders
52.204-6 Data Universal Numbering System (DUNS) Number. (APR 2008)
52.214-3 Amendments to Invitations for Bids. (DEC 1989)
52.214-4 False Statements in Bids. (APR 1984)
52.214-5 Submission of Bids. (MAR 1997)
52.214-6 Explanation to Prospective Bidders. (APR 1984)
52.214-7 Late Submissions, Modifications, and Withdrawals of Bids. (NOV 1999)
52.214-18 Preparation of Bids - Construction. (APR 1984)
52.214-19 Contract Award - Sealed Bidding - Construction. (AUG 1996)
52.214-34 Submission of Offers in the English Language (APR 1991)
52.214-35 Submission of Offers in U.S. Currency. (APR 1991)
52.211-4 Availability for Examination of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions. (JUN 1988)
52.216-1 Type of Contract. (APR 1984)
52.228-1 Bid Guarantee. (SEP 1996)
52.233-2 Service of Protest. (SEP 2006)
52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995)
452.204-70 Inquiries. (FEB 1988)
452.219-70 Size Standard and NAICS Code Information. (SEP 2001)
452.228-70 Alternative Forms of Security. (NOV 1996)
Evaluation Factors for Award
Attachment 2.pdf
52.219-14 Limitations on Subcontracting. (Nov 2011)
Amend 1.pdf
Special Contract Requirements
SPECIFICATIONS
MOBILIZATION AND DEMOBILIZATION 8
ROCK RIPRAP 61
CONTRACTOR QUALITY CONTROL 94
GEOTEXTILE 95
5. List of Individuals or Firms Attending Site Showing:
Amend 1.pdf
Special Contract Requirements
SPECIFICATIONS
MOBILIZATION AND DEMOBILIZATION 8
ROCK RIPRAP 61
CONTRACTOR QUALITY CONTROL 94
GEOTEXTILE 95
5. List of Individuals or Firms Attending Site Showing:
Amend 1.pdf
Special Contract Requirements
SPECIFICATIONS
MOBILIZATION AND DEMOBILIZATION 8
ROCK RIPRAP 61
CONTRACTOR QUALITY CONTROL 94
GEOTEXTILE 95
5. List of Individuals or Firms Attending Site Showing:
Amend 1.pdf
Special Contract Requirements
SPECIFICATIONS
MOBILIZATION AND DEMOBILIZATION 8
ROCK RIPRAP 61
CONTRACTOR QUALITY CONTROL 94
GEOTEXTILE 95
5. List of Individuals or Firms Attending Site Showing:
IDCode:
Page: 1
Pages: 1
AmendNo: 000002
EffDate: 10/24/12
ReqNo:
ProjNo:
IssCode:
IssuedBy: USDA-NRCS-TEXAS

101 SOUTH MAIN STREET

TEMPLE, TX 76501

AdmCode:
AdminBy: USDA-NRCS-TEXAS

101 SOUTH MAIN STREET

TEMPLE, TX 76501

ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolChgYs: Yes
SolChgNo: Off
SolAmdNo: AG-7442-S-12-0090
AmendDate: 9/15/12
ModNo:
ModDate:
NoCopies: 1
Amended: Off
OffrExt: Off
OffrNoEx: No
ApprData:
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript:

Q: Can the Contractor dig a trench (which would allow 60 cfs to pass) in the existing channel, use the spoil to create a coffer dam to separate the water from the planned works, and use the opposite bank for access to dig the trench?

A: Yes, however all spoils deposited to create the coffer dam will have to be removed and disposed in the designated waste area.

SignName:
SignTitl:
ContDate:
CoName: KATHLEEN PINCKNEY
CoTitle: Contracting Officer
CODate:

File details come from the government source that posted it. Updated .