Amendment 2 to the Solicitation

View the file

Other files

File Type Posted
Long Abstract.contract.xlsx XLSX spreadsheet
Revised Bid Schedule2.pdf PDF
ms592.pdf PDF
Amendment 1.pdf PDF
Revised Bid Schedule.pdf PDF
Signed SWPPP.pdf PDF
TX36_dvb.htm HTM file
Pilot Grove 28 Repair-000.pdf PDF
Pilot Grove 28 Repair-001.pdf PDF
Pilot Grove 28 Repair-005.pdf PDF
Pilot Grove 28 Repair-002.pdf PDF
PilotGrove28SPCs.pdf PDF
Pilot Grove 28 Repair-004.pdf PDF
AG-7442-S-10-0027.pdf PDF
Pilot Grove 28 Repair-003.pdf PDF
Map to Site Showing.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Amendment 2 to AG-7442-S-10-0027 Page 2 of 2

Corrections/Additions:

1. Replace Revised Bid Schedule, Amendment 1 with the Attached Bid Schedule Revision 2.

2. In the Bid Schedule Base Item No. 8, Earthfill, change Estimated Quantities to 1,100 from 1,514 cubic yards.

3. On Drawing TX-EN-0566 Sheet No. 2 add the following note:

“Note: The Contractor shall furnish and install Class I, Non-Woven Geotextile at elevation 580.0 to separate rock riprap and topsoil. The strip shall be 5 foot wide and anchored behind the rock and folded over the top surface of the finished rock at elevation 580.0. The Geotextile shall meet the requirements of Table 592-2, Class I, in Material Specification 592 - Geotextile. Payment for the geotextile shall be included in Bid Item 13. Rock Riprap. All laps shall be 24 inches.”

4. In Rock Riprap CS 61, Section 8.a., in the Item of Work and Construction Details, add the following:

“Item of work subsidiary to this bid item is Geotextile placement as required in Amendment No. 2.”

5. Add Material Specification 592, attached, to the solicitation following the Construction Specifications.

Attachments

-------------------------------------------Nothing Follows-------------------------------------------------------

IDCode:
Page: 1
Pages: 2
AmendNo: 000002
EffDate: 02/11/10
ReqNo:
ProjNo:
IssCode:
IssuedBy: USDA-NRCS-TEXAS

101 SOUTH MAIN STREET

TEMPLE, TX 76501

AdmCode:
AdminBy: USDA-NRCS-TEXAS

101 SOUTH MAIN STREET

TEMPLE, TX 76501

ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolChgYs: Yes
SolChgNo: Off
SolAmdNo: AG-7442-S-10-0027
AmendDate: 1/14/10
ModNo:
ModDate:
NoCopies: 0
Amended: Off
OffrExt: Off
OffrNoEx: No
ApprData:
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript:

Contractors must Acknowledge Amendment 1 in Block 19 of Standard Form 1442, page 2, attached.