| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0003 | 10/30/09 | 12/30/09 | 1 of 6 | |||||||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||||||
| /s/ | 12/30/09 | ||||||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||||||
| Chambers Creek Sites 32 & 38 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | Jay Mills Contracting, Inc | AMS Co, Inc | Feller Enterprises | Serco Construction Group | ||||||||
| (Without Profit) | Stephenville, TX | Cleburne, TX | St George, UT | Dallas, TX | |||||||||
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | yes | yes | yes | ||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Chambers Creek Site 32 | 1 | 1 | 1 | 1 | |||||||||
| 7A | c. | D. | E. | F. | G. | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $20,000.00 | $20,000.00 | $2,500.00 | $2,500.00 | $2,733.92 | $2,733.92 | $5,000.00 | $5,000.00 | $4,417.56 | $4,417.56 |
| 2 | Sediment Filters | 2,720 | LF | $4.00 | $10,880.00 | $2.20 | $5,984.00 | $1.48 | $4,025.60 | $2.00 | $5,440.00 | $1.99 | $5,412.80 |
| 3 | Vegetaton, Sprigging | 4.2 | AC | $2,000.00 | $8,400.00 | $1,815.00 | $7,623.00 | $3,718.13 | $15,616.15 | $1,850.00 | $7,770.00 | $1,325.00 | $5,565.00 |
| 4 | construction surveys | 1 | JB | $30,000.00 | $30,000.00 | $4,000.00 | $4,000.00 | $4,374.28 | $4,374.28 | $25,000.00 | $25,000.00 | $17,925.00 | $17,925.00 |
| 5 | Mobilization & Demobilization | 1 | JB | $50,000.00 | $50,000.00 | $45,000.00 | $45,000.00 | $46,324.83 | $46,324.83 | $25,000.00 | $25,000.00 | $41,633.00 | $41,633.00 |
| 6 | Removal of Water | 1 | JB | $15,000.00 | $15,000.00 | $8,000.00 | $8,000.00 | $8,865.10 | $8,865.10 | $5,000.00 | $5,000.00 | $6,205.00 | $6,205.00 |
| 7 | Excavation, common | 14,033 | CY | $6.50 | $91,214.50 | $3.19 | $44,765.27 | $2.71 | $38,029.43 | $3.00 | $42,099.00 | $3.13 | $43,923.29 |
| 8 | Excavation, common, berm | 2,292 | SY | $8.00 | $18,336.00 | $4.00 | $9,168.00 | $3.00 | $6,876.00 | $2.00 | $4,584.00 | $3.02 | $6,921.84 |
| 9 | Earthfill | 4,128 | CY | $6.00 | $24,768.00 | $4.00 | $16,512.00 | $2.54 | $10,485.12 | $2.00 | $8,256.00 | $3.43 | $14,159.04 |
| 10 | Drainfill | 501 | CY | $50.00 | $25,050.00 | $40.00 | $20,040.00 | $30.46 | $15,260.46 | $40.00 | $20,040.00 | $50.04 | $25,070.04 |
| 11 | Topsoil, Embankment | 13,497 | SY | $3.50 | $47,239.50 | $1.10 | $14,846.70 | $1.79 | $24,159.63 | $1.50 | $20,245.50 | $1.58 | $21,325.26 |
| 12 | Topsoil, Lime Processing Area | 15,461 | SY | $3.50 | $54,113.50 | $0.60 | $9,276.60 | $1.10 | $17,007.10 | $1.00 | $15,461.00 | $1.38 | $21,336.18 |
| 13 | Lime-treated earthfill | 12,804 | CY | $8.00 | $102,432.00 | $7.40 | $94,749.60 | $6.23 | $79,768.92 | $7.50 | $96,030.00 | $7.32 | $93,725.28 |
| 14 | Furnishing & Handling Lime, quickline | 747 | TN | $150.00 | $112,050.00 | $133.00 | $99,351.00 | $127.95 | $95,578.65 | $135.00 | $100,845.00 | $131.62 | $98,320.14 |
| 15 | Pipe, PVC, 4" ID | 345 | LF | $25.00 | $8,625.00 | $20.00 | $6,900.00 | $18.31 | $6,316.95 | $5.00 | $1,725.00 | $15.97 | $5,509.65 |
| 16 | Fences, Barbed wire | 4,853 | LF | $5.00 | $24,265.00 | $4.35 | $21,110.55 | $4.77 | $23,148.81 | $4.00 | $19,412.00 | $4.64 | $22,517.92 |
| 17 | Contractor Quality Control | 1 | JB | 50,000.00 | $50,000.00 | $27,500.00 | $27,500.00 | $43,742.75 | $43,742.75 | $35,000.00 | $35,000.00 | $39,074.00 | $39,074.00 |
| Subtotal page 1: | $692,373.50 | $437,326.72 | $442,313.70 | $436,907.50 | $473,041.00 | ||||||||
| Subtotal page 2: | $1,009,108.75 | $732,049.40 | $731,857.58 | $746,957.50 | $778,157.00 | ||||||||
| TOTAL: | $1,701,482.25 | $1,169,376.12 | $1,174,171.28 | $1,183,865.00 | $1,251,198.00 | ||||||||
| BID RANKING: | 1 | 2 | 3 | 4 | |||||||||
| BUSINESS TYPE: | SB | VO/ESB | ESB | OY/ESB | |||||||||
| Small Business (SB); Small Disadvantaged Business (SDB); HUBZone Small Business Concern (HBC); Veteran-Owned (VO);Black Owned (OY); Native American Owned (NB) |
| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0003 | 10/30/09 | 12/30/09 | 2 of 6 | |||||||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||||||
| /s/ | 12/30/09 | ||||||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||||||
| Chambers Creek Sites 32 & 38 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | Jay Mills Contracting, Inc | AMS Co, Inc | Feller Enterprises | Serco Construction Group | ||||||||
| (Without Profit) | Stephenville, TX | Cleburne, TX | St George, UT | Dallas, TX | |||||||||
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | yes | yes | yes | ||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Chambers Creek Site 38 | 1 | 1 | 1 | 1 | |||||||||
| 7A | c. | D. | E. | F. | G. | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $10,000.00 | $10,000.00 | $2,500.00 | $2,500.00 | $2,733.92 | $2,733.92 | $5,000.00 | $5,000.00 | $7,222.64 | $7,222.64 |
| 2 | Sediment Filters | 2,600 | LF | $3.50 | $9,100.00 | $2.20 | $5,720.00 | $1.48 | $3,848.00 | $2.00 | $5,200.00 | $1.99 | $5,174.00 |
| 3 | Vegetaton, Sprigging | 10.2 | AC | $2,000.00 | $20,400.00 | $1,815.00 | $18,513.00 | $3,718.13 | $37,924.93 | $1,850.00 | $18,870.00 | $1,325.00 | $13,515.00 |
| 4 | construction surveys | 1 | JB | $15,000.00 | $15,000.00 | $4,000.00 | $4,000.00 | 4374.28 | $4,374.28 | $25,000.00 | $25,000.00 | $27,152.77 | $27,152.77 |
| 5 | Mobilization & Demobilization | 1 | JB | $40,000.00 | $40,000.00 | $28,000.00 | $28,000.00 | $44,583.59 | $44,583.59 | $25,000.00 | $25,000.00 | $48,023.00 | $48,023.00 |
| 6 | Removal of Water | 1 | JB | $10,000.00 | $10,000.00 | $8,000.00 | $8,000.00 | $8,865.10 | $8,865.10 | $5,000.00 | $5,000.00 | $6,205.00 | $6,205.00 |
| 7 | Excavation, common | 28,010 | CY | $6.25 | $175,062.50 | $3.00 | $84,030.00 | $2.70 | $75,627.00 | $3.00 | $84,030.00 | $2.87 | $80,388.70 |
| 8 | Excavation, common, berm | 3,965 | SY | $8.00 | $31,720.00 | $4.00 | $15,860.00 | $3.95 | $15,661.75 | $2.00 | $7,930.00 | $2.81 | $11,141.65 |
| 9 | Earthfill | 4,814 | CY | $5.50 | $26,477.00 | $4.00 | $19,256.00 | $2.54 | $12,227.56 | $3.00 | $14,442.00 | $3.67 | $17,667.38 |
| 10 | Topsoil, Embankment | 27,782 | SY | $3.25 | $90,291.50 | $1.10 | $30,560.20 | $1.79 | $49,729.78 | $1.50 | $41,673.00 | $1.43 | $39,728.26 |
| 11 | Topsoil, Lime Processing Area | 9,775 | SY | $3.25 | $31,768.75 | $0.60 | $5,865.00 | $1.10 | $10,752.50 | $1.00 | $9,775.00 | $1.56 | $15,249.00 |
| 12 | Topsoil, Embankment Abutments | 2,380 | SY | $3.25 | $7,735.00 | $1.10 | $2,618.00 | $2.65 | $6,307.00 | $4.00 | $9,520.00 | $2.56 | $6,092.80 |
| 13 | Lime-treated earthfill | 28,063 | CY | $8.00 | $224,504.00 | $7.40 | $207,666.20 | $6.31 | $177,077.53 | $7.50 | $210,472.50 | $7.02 | $197,002.26 |
| 14 | Furnishing & Handling Lime, quickline | 1,667 | TN | $150.00 | $250,050.00 | $133.00 | $221,711.00 | $127.96 | $213,309.32 | $135.00 | $225,045.00 | $131.62 | $219,410.54 |
| 15 | Fences, Barbed wire | 5,000 | LF | $5.00 | $25,000.00 | $4.35 | $21,750.00 | $4.77 | $23,850.00 | $4.00 | $20,000.00 | $4.64 | $23,200.00 |
| 16 | Contractor Quality Control | 1 | JB | 40,000.00 | $40,000.00 | $55,000.00 | $55,000.00 | $43,747.03 | $43,747.03 | $35,000.00 | $35,000.00 | $57,026.00 | $57,026.00 |
| 17 | Shaping | 1 | JB | 2,000.00 | $2,000.00 | $1,000.00 | $1,000.00 | $1,238.29 | $1,238.29 | $5,000.00 | $5,000.00 | $3,958.00 | $3,958.00 |
| Subtotal page 2: | $1,009,108.75 | $732,049.40 | $731,857.58 | $746,957.50 | $778,157.00 | ||||||||
| Subtotal page 1: | $692,373.50 | $437,326.72 | $442,313.70 | $436,907.50 | $473,041.00 | ||||||||
| TOTAL: | $1,701,482.25 | $1,169,376.12 | $1,174,171.28 | $1,183,865.00 | $1,251,198.00 |
Sheet3
| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0003 | 10/30/09 | 12/30/09 | 32 of 6 | |||||||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||||||
| /s/ | 12/30/09 | ||||||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||||||
| Chambers Creek Sites 32 & 38 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | Precision Impact & Recovery | A L Helmcamp Inc | Beavers Contracting LLC | Basecom | ||||||||
| (Without Profit) | Pauls Valley, OK | Buffalo, TX | Aubrey, TX | Ft Worth, TX | |||||||||
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | yes | yes | yes | ||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Chambers Creek Site 32 | 1 | 1 | 1 | 1 | |||||||||
| 7A | c. | D. | E. | F. | G. | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $6,000.00 | $6,000.00 | $10,000.00 | $10,000.00 | $14,570.00 | $14,570.00 |
| 2 | Sediment Filters | 2,720 | LF | $4.00 | $10,880.00 | $2.50 | $6,800.00 | $3.00 | $8,160.00 | $3.85 | $10,472.00 | $2.00 | $5,440.00 |
| 3 | Vegetaton, Sprigging | 4.2 | AC | $2,000.00 | $8,400.00 | $1,800.00 | $7,560.00 | $2,200.00 | $9,240.00 | $3,400.00 | $14,280.00 | $1,450.00 | $6,090.00 |
| 4 | construction surveys | 1 | JB | $30,000.00 | $30,000.00 | $40,000.00 | $40,000.00 | $16,000.00 | $16,000.00 | $25,000.00 | $25,000.00 | $42,500.00 | $42,500.00 |
| 5 | Mobilization & Demobilization | 1 | JB | $50,000.00 | $50,000.00 | $35,000.00 | $35,000.00 | $70,000.00 | $70,000.00 | $95,000.00 | $95,000.00 | $34,001.83 | $34,001.83 |
| 6 | Removal of Water | 1 | JB | $15,000.00 | $15,000.00 | $20,000.00 | $20,000.00 | $1,000.00 | $1,000.00 | $30,000.00 | $30,000.00 | $13,844.92 | $13,844.92 |
| 7 | Excavation, common | 14,033 | CY | $6.50 | $91,214.50 | $5.00 | $70,165.00 | $6.00 | $84,198.00 | $4.87 | $68,340.71 | $5.15 | $72,269.95 |
| 8 | Excavation, common, berm | 2,292 | SY | $8.00 | $18,336.00 | $4.00 | $9,168.00 | $6.00 | $13,752.00 | $7.15 | $16,387.80 | $6.35 | $14,554.20 |
| 9 | Earthfill | 4,128 | CY | $6.00 | $24,768.00 | $4.00 | $16,512.00 | $4.00 | $16,512.00 | $5.00 | $20,640.00 | $7.60 | $31,372.80 |
| 10 | Drainfill | 501 | CY | $50.00 | $25,050.00 | $60.00 | $30,060.00 | $55.00 | $27,555.00 | $50.00 | $25,050.00 | $39.00 | $19,539.00 |
| 11 | Topsoil, Embankment | 13,497 | SY | $3.50 | $47,239.50 | $2.50 | $33,742.50 | $2.50 | $33,742.50 | $3.70 | $49,938.90 | $1.30 | $17,546.10 |
| 12 | Topsoil, Lime Processing Area | 15,461 | SY | $3.50 | $54,113.50 | $2.75 | $42,517.75 | $0.60 | $9,276.60 | $2.95 | $45,609.95 | $1.30 | $20,099.30 |
| 13 | Lime-treated earthfill | 12,804 | CY | $8.00 | $102,432.00 | $7.00 | $89,628.00 | $9.00 | $115,236.00 | $7.28 | $93,213.12 | $10.00 | $128,040.00 |
| 14 | Furnishing & Handling Lime, quickline | 747 | TN | $150.00 | $112,050.00 | $130.00 | $97,110.00 | $145.00 | $108,315.00 | $129.95 | $97,072.65 | $165.00 | $123,255.00 |
| 15 | Pipe, PVC, 4" ID | 345 | LF | $25.00 | $8,625.00 | $37.00 | $12,765.00 | $40.00 | $13,800.00 | $18.00 | $6,210.00 | $40.00 | $13,800.00 |
| 16 | Fences, Barbed wire | 4,853 | LF | $5.00 | $24,265.00 | $5.50 | $26,691.50 | $6.00 | $29,118.00 | $7.50 | $36,397.50 | $7.30 | $35,426.90 |
| 17 | Contractor Quality Control | 1 | JB | 50,000.00 | $50,000.00 | $45,000.00 | $45,000.00 | $37,000.00 | $37,000.00 | $42,000.00 | $42,000.00 | $58,650.00 | $58,650.00 |
| Subtotal page 1: | $692,373.50 | $602,719.75 | $598,905.10 | $685,612.63 | $651,000.00 | ||||||||
| Subtotal page 2: | $1,009,108.75 | $922,963.25 | $974,679.50 | $945,471.00 | $999,600.00 | ||||||||
| TOTAL: | $1,701,482.25 | $1,525,683.00 | $1,573,584.60 | $1,631,083.63 | $1,650,600.00 | ||||||||
| BID RANKING: | 5 | 6 | 7 | 8 | |||||||||
| BUSINESS TYPE: | ESB | L | ESB | SDB/ESB | |||||||||
| Small Business (SB); Small Disadvantaged Business (SDB); HUBZone Small Business Concern (HBC); Veteran-Owned (VO);Black Owned (OY); Native American Owned (NB) |
Sheet4
| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0003 | 10/30/09 | 12/30/09 | 4 of 6 | |||||||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||||||
| /s/ | 12/30/09 | ||||||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||||||
| Chambers Creek Sites 32 & 38 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | Precision Impact & Recovery | A L Helmcamp Inc | Beavers Contracting LLC | Basecom | ||||||||
| (Without Profit) | Pauls Valley, OK | Buffalo, TX | Aubrey, TX | Ft Worth, TX | |||||||||
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | yes | yes | yes | ||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Chambers Creek Site 38 | 1 | 1 | 1 | 1 | |||||||||
| 7A | c. | D. | E. | F. | G. | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $10,000.00 | $10,000.00 | $20,000.00 | $20,000.00 | $6,000.00 | $6,000.00 | $10,000.00 | $10,000.00 | $13,900.00 | $13,900.00 |
| 2 | Sediment Filters | 2,600 | LF | $3.50 | $9,100.00 | $2.50 | $6,500.00 | $3.00 | $7,800.00 | $3.75 | $9,750.00 | $1.90 | $4,940.00 |
| 3 | Vegetaton, Sprigging | 10.2 | AC | $2,000.00 | $20,400.00 | $1,800.00 | $18,360.00 | $2,200.00 | $22,440.00 | $2,500.00 | $25,500.00 | $1,400.00 | $14,280.00 |
| 4 | construction surveys | 1 | JB | $15,000.00 | $15,000.00 | $40,000.00 | $40,000.00 | $25,000.00 | $25,000.00 | $27,000.00 | $27,000.00 | $40,500.00 | $40,500.00 |
| 5 | Mobilization & Demobilization | 1 | JB | $40,000.00 | $40,000.00 | $35,000.00 | $35,000.00 | $70,000.00 | $70,000.00 | $30,000.00 | $30,000.00 | $32,500.00 | $32,500.00 |
| 6 | Removal of Water | 1 | JB | $10,000.00 | $10,000.00 | $20,000.00 | $20,000.00 | $1,000.00 | $1,000.00 | $27,000.00 | $27,000.00 | $13,275.61 | $13,275.61 |
| 7 | Excavation, common | 28,010 | CY | $6.25 | $175,062.50 | $5.00 | $140,050.00 | $5.40 | $151,254.00 | $4.05 | $113,440.50 | $4.90 | $137,249.00 |
| 8 | Excavation, common, berm | 3,965 | SY | $8.00 | $31,720.00 | $4.00 | $15,860.00 | $5.50 | $21,807.50 | $7.00 | $27,755.00 | $7.25 | $28,746.25 |
| 9 | Earthfill | 4,814 | CY | $5.50 | $26,477.00 | $4.00 | $19,256.00 | $4.00 | $19,256.00 | $5.05 | $24,310.70 | $7.25 | $34,901.50 |
| 10 | Topsoil, Embankment | 27,782 | SY | $3.25 | $90,291.50 | $2.50 | $69,455.00 | $2.50 | $69,455.00 | $3.75 | $104,182.50 | $1.27 | $35,283.14 |
| 11 | Topsoil, Lime Processing Area | 9,775 | SY | $3.25 | $31,768.75 | $2.75 | $26,881.25 | $0.60 | $5,865.00 | $2.95 | $28,836.25 | $1.27 | $12,414.25 |
| 12 | Topsoil, Embankment Abutments | 2,380 | SY | $3.25 | $7,735.00 | $2.50 | $5,950.00 | $4.00 | $9,520.00 | $3.70 | $8,806.00 | $1.27 | $3,022.60 |
| 13 | Lime-treated earthfill | 28,063 | CY | $8.00 | $224,504.00 | $7.00 | $196,441.00 | $9.00 | $252,567.00 | $7.35 | $206,263.05 | $9.55 | $268,001.65 |
| 14 | Furnishing & Handling Lime, quickline | 1,667 | TN | $150.00 | $250,050.00 | $130.00 | $216,710.00 | $145.00 | $241,715.00 | $131.00 | $218,377.00 | $158.00 | $263,386.00 |
| 15 | Fences, Barbed wire | 5,000 | LF | $5.00 | $25,000.00 | $5.50 | $27,500.00 | $6.00 | $30,000.00 | $7.75 | $38,750.00 | $7.30 | $36,500.00 |
| 16 | Contractor Quality Control | 1 | JB | 40,000.00 | $40,000.00 | $45,000.00 | $45,000.00 | $37,000.00 | $37,000.00 | $39,000.00 | $39,000.00 | $52,000.00 | $52,000.00 |
| 17 | Shaping | 1 | JB | 2,000.00 | $2,000.00 | $20,000.00 | $20,000.00 | $4,000.00 | $4,000.00 | $6,500.00 | $6,500.00 | $8,700.00 | $8,700.00 |
| Subtotal page 2: | $1,009,108.75 | $922,963.25 | $974,679.50 | $945,471.00 | $999,600.00 | ||||||||
| Subtotal page 1: | $692,373.50 | $602,719.75 | $598,905.10 | $685,612.63 | $651,000.00 | ||||||||
| TOTAL: | $1,701,482.25 | $1,525,683.00 | $1,573,584.60 | $1,631,083.63 | $1,650,600.00 |
Sheet 5
| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0003 | 10/30/09 | 12/30/09 | 5 of 6 | |||||||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||||||
| /s/ | 12/30/09 | ||||||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||||||
| Chambers Creek Sites 32 & 38 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | BRJ-Ambreco Joint Venture | Slack & Co Contracting | Pitts Contruction, Inc | |||||||||
| (Without Profit) | Ft Worth, TX | Houston, TX | Austin, TX | ||||||||||
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | yes | yes | |||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Chambers Creek Site 32 | 1 | 1 | 1 | ||||||||||
| 7A | c. | D. | E. | F. | G. | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $20,000.00 | $20,000.00 | $10,633.20 | $10,633.20 | $12,000.00 | $12,000.00 | $10,000.00 | $10,000.00 | ||
| 2 | Sediment Filters | 2,720 | LF | $4.00 | $10,880.00 | $3.29 | $8,948.80 | $2.00 | $5,440.00 | $3.00 | $8,160.00 | ||
| 3 | Vegetaton, Sprigging | 4.2 | AC | $2,000.00 | $8,400.00 | $6,749.87 | $28,349.45 | $2,000.00 | $8,400.00 | $900.00 | $3,780.00 | ||
| 4 | construction surveys | 1 | JB | $30,000.00 | $30,000.00 | $43,170.43 | $43,170.43 | $10,600.00 | $10,600.00 | $8,500.00 | $8,500.00 | ||
| 5 | Mobilization & Demobilization | 1 | JB | $50,000.00 | $50,000.00 | $68,968.72 | $68,968.72 | $78,500.00 | $78,500.00 | $25,000.00 | $25,000.00 | ||
| 6 | Removal of Water | 1 | JB | $15,000.00 | $15,000.00 | $10,947.35 | $10,947.35 | $33,400.00 | $33,400.00 | $5,000.00 | $5,000.00 | ||
| 7 | Excavation, common | 14,033 | CY | $6.50 | $91,214.50 | $5.74 | $80,549.42 | $7.00 | $98,231.00 | $6.00 | $84,198.00 | ||
| 8 | Excavation, common, berm | 2,292 | SY | $8.00 | $18,336.00 | $5.74 | $13,156.08 | $15.00 | $34,380.00 | $8.00 | $18,336.00 | ||
| 9 | Earthfill | 4,128 | CY | $6.00 | $24,768.00 | $6.65 | $27,451.20 | $5.00 | $20,640.00 | $12.00 | $49,536.00 | ||
| 10 | Drainfill | 501 | CY | $50.00 | $25,050.00 | $51.70 | $25,901.70 | $40.00 | $20,040.00 | $15.00 | $7,515.00 | ||
| 11 | Topsoil, Embankment | 13,497 | SY | $3.50 | $47,239.50 | $2.15 | $29,018.55 | $3.00 | $40,491.00 | $2.00 | $26,994.00 | ||
| 12 | Topsoil, Lime Processing Area | 15,461 | SY | $3.50 | $54,113.50 | $2.15 | $33,241.15 | $3.00 | $46,383.00 | $2.00 | $30,922.00 | ||
| 13 | Lime-treated earthfill | 12,804 | CY | $8.00 | $102,432.00 | $4.85 | $62,099.40 | $15.00 | $192,060.00 | $30.00 | $384,120.00 | ||
| 14 | Furnishing & Handling Lime, quickline | 747 | TN | $150.00 | $112,050.00 | $173.77 | $129,806.19 | $150.00 | $112,050.00 | $150.00 | $112,050.00 | ||
| 15 | Pipe, PVC, 4" ID | 345 | LF | $25.00 | $8,625.00 | $64.81 | $22,359.45 | $12.00 | $4,140.00 | $20.00 | $6,900.00 | ||
| 16 | Fences, Barbed wire | 4,853 | LF | $5.00 | $24,265.00 | $14.89 | $72,261.17 | $14.00 | $67,942.00 | $5.00 | $24,265.00 | ||
| 17 | Contractor Quality Control | 1 | JB | 50,000.00 | $50,000.00 | $43,308.66 | $43,308.66 | $5,000.00 | $5,000.00 | $49,000.00 | $49,000.00 | ||
| math errors | Extended price total incorrect | ||||||||||||
| Subtotal page 1: | $692,373.50 | $710,170.92 | $789,697.00 | $854,276.00 | |||||||||
| Subtotal page 2: | $1,009,108.75 | $1,246,854.17 | $1,287,121.00 | $1,686,982.00 | |||||||||
| TOTAL: | $1,701,482.25 | $1,957,025.09 | $2,076,818.00 | $2,541,258.00 | |||||||||
| BID RANKING: | 9 | 10 | 11 | ||||||||||
| BUSINESS TYPE: | ESB | SB | WO/ESB | ||||||||||
| Small Business (SB); Small Disadvantaged Business (SDB); HUBZone Small Business Concern (HBC); Veteran-Owned (VO);Black Owned (OY); Native American Owned (NB) |
Sheet 6
| FOR GOVERNMENT USE ONLY. | 1. SOLICITATION NUMBER | 2. DATE ISSUED | 3. DATE OPENED | PAGE | |||||||||
| ABSTRACT OF OFFERS - | AG-7442-S-10-0003 | 10/30/09 | 12/30/09 | 6 of 6 | |||||||||
| 4. ISSUING OFFICE | I CERTIFY that I have opened, | NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE) | |||||||||||
| USDA Natural Resources Conservation Service | read, and recorded on this abstract | Kathleen Pinckney | |||||||||||
| 101 South Main Street | all offers received in response to | Contracting Officer | |||||||||||
| Temple, Texas 76501-7602 | this solicitation. | SIGNATURE DATED: | DATE SIGNED | ||||||||||
| /s/ | 12/30/09 | ||||||||||||
| 5. PROJECT TITLE | 6. GOVERNMENT ESTIMATE | 7. OFFERS | |||||||||||
| (Check A, B, or C and complete D, E, and F) | NO. 1 | NO. 2 | NO. 3 | NO. 4 | |||||||||
| Chambers Creek Sites 32 & 38 | A. HIRED LABOR | A. OFFEROR | A. OFFEROR | A. OFFEROR | A. OFFEROR | ||||||||
| ARRA Funded Watershed Repairs | B. REASONABLE CONTRACT | BRJ-Ambreco Joint Venture | Slack & Co Contracting | Pitts Contruction, Inc | |||||||||
| (Without Profit) | Ft Worth, TX | Houston, TX | Austin, TX | ||||||||||
| B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | B. BID SECURITY | ||||||||||
| 8. NUMBER OF AMENDMENTS ISSUED | C. REASONABLE CONTRACT | yes | yes | ||||||||||
| (Including Profit) | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | C. AMENDMENTS | |||||||||
| Chambers Creek Site 38 | 1 | 1 | 1 | 1 | |||||||||
| 7A | c. | D. | E. | F. | G. | H. | |||||||
| Item | 7B.. DESCRIPTION OF OFFERED ITEM | QTY. | UNIT | UNIT PRICE | GOV. ESTIMATE | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 1 | Pollution Control | 1 | JB | $10,000.00 | $10,000.00 | $10,578.90 | $10,578.90 | $12,000.00 | $12,000.00 | $10,000.00 | $10,000.00 | ||
| 2 | Sediment Filters | 2,600 | LF | $3.50 | $9,100.00 | $3.14 | $8,164.00 | $2.00 | $5,200.00 | $3.00 | $7,800.00 | ||
| 3 | Vegetaton, Sprigging | 10.2 | AC | $2,000.00 | $20,400.00 | $6,792.46 | $69,283.09 | $2,000.00 | $20,400.00 | $900.00 | $9,180.00 | ||
| 4 | construction surveys | 1 | JB | $15,000.00 | $15,000.00 | $49,079.17 | $49,079.17 | $10,600.00 | $10,600.00 | 8500 | $8,500.00 | ||
| 5 | Mobilization & Demobilization | 1 | JB | $40,000.00 | $40,000.00 | $85,168.51 | $85,168.51 | $55,000.00 | $55,000.00 | $75,000.00 | $75,000.00 | ||
| 6 | Removal of Water | 1 | JB | $10,000.00 | $10,000.00 | $18,635.56 | $18,635.56 | $34,000.00 | $34,000.00 | $5,000.00 | $5,000.00 | ||
| 7 | Excavation, common | 28,010 | CY | $6.25 | $175,062.50 | $6.17 | $172,821.70 | $7.00 | $196,070.00 | $6.00 | $168,060.00 | ||
| 8 | Excavation, common, berm | 3,965 | SY | $8.00 | $31,720.00 | $5.78 | $22,917.70 | $15.00 | $59,475.00 | $8.00 | $31,720.00 | ||
| 9 | Earthfill | 4,814 | CY | $5.50 | $26,477.00 | $6.73 | $32,398.22 | $5.00 | $24,070.00 | $12.00 | $57,768.00 | ||
| 10 | Topsoil, Embankment | 27,782 | SY | $3.25 | $90,291.50 | $3.98 | $110,572.36 | $3.00 | $83,346.00 | $2.00 | $55,564.00 | ||
| 11 | Topsoil, Lime Processing Area | 9,775 | SY | $3.25 | $31,768.75 | $3.98 | $38,904.50 | $3.00 | $29,325.00 | $2.00 | $19,550.00 | ||
| 12 | Topsoil, Embankment Abutments | 2,380 | SY | $3.25 | $7,735.00 | $3.99 | $9,496.20 | $3.00 | $7,140.00 | $5.00 | $11,900.00 | ||
| 13 | Lime-treated earthfill | 28,063 | CY | $8.00 | $224,504.00 | $4.91 | $137,789.33 | $15.00 | $420,945.00 | $30.00 | $841,890.00 | ||
| 14 | Furnishing & Handling Lime, quickline | 1,667 | TN | $150.00 | $250,050.00 | $174.87 | $291,508.29 | $150.00 | $250,050.00 | $150.00 | $250,050.00 | ||
| 15 | Fences, Barbed wire | 5,000 | LF | $5.00 | $25,000.00 | $16.40 | $82,000.00 | $14.00 | $70,000.00 | 5 | $25,000.00 | ||
| 16 | Contractor Quality Control | 1 | JB | 40,000.00 | $40,000.00 | $83,099.30 | $83,099.30 | $5,000.00 | $5,000.00 | $90,000.00 | $90,000.00 | ||
| 17 | Shaping | 1 | JB | 2,000.00 | $2,000.00 | $24,437.34 | $24,437.34 | $4,500.00 | $4,500.00 | $20,000.00 | $20,000.00 | ||
| math errors | Extended price total incorrect | ||||||||||||
| Subtotal page 2: | $1,009,108.75 | $1,246,854.17 | $1,287,121.00 | $1,686,982.00 | |||||||||
| Subtotal page 1: | $692,373.50 | $710,170.92 | $789,697.00 | $854,276.00 | |||||||||
| $2,541,258.00 | |||||||||||||
| TOTAL: | $1,701,482.25 | $1,957,025.09 | $2,076,818.00 |