AG-7103-S-09-0013 Amend 0001.pdf
PDF 129 KB Posted
- Solicitation number
- AG-7103-S-09-0013
About this file
AG-7103-S-09-0013 Amend 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign-In Sheet.pdf | ||
| AG-7103-S-09-0013 Amend 0002.pdf | ||
| Pre-proposal Sign-In Sheets.pdf | ||
| Pre-proposal Minutes.doc | DOC document | |
| AG-7103-S-09-0013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
J 1 3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
2009 MAR 25
4. REQUISITION/PURCHASE REQ. NO.
254312
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE USDA – NRCS – Arkansas State Office 700 West Capitol Avenue, Room 3416 Little Rock, AR 72201
9A. AMENDMENT OF SOLICITATION NO.
AG-7103-S-09-0013
9B. DATED (See Item 11
2009 MAR 16
10A. AMENDMENT OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
10B. DATED (See Item 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
_X___ The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers _____ is extended, __X__ is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing Items 8 and 15, and returning _____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not _ is required to sign this document and return the original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).
Multiple Award, Indefinite Delivery, Indefinite Quantity (IDIQ) Task Order Contracts in support of Natural Resources Conservation Service (NRCS) Programs throughout the State of Arkansas
A. A site visit for the sample project is scheduled for Tuesday, March 31, 2009, at 10:00 a.m. We will gather at the work site located on Arkansas Hwy. 161. Attendance is not mandatory. Directions (Attachment 1) and a map (Attachment 2) are included with this amendment.
B. Page 14 of 187, Section H, Paragraph H.13 c., eighth line – Between “contractor” and “capacity” add “and contract”.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE 30-105 Prescribed by GSA
FAR (48 CFR) 53.243
SF 30
Solicitation No. AG-7103-S-09-0013 Amendment No. 0001 Multiple Award, Indefinite Delivery, Indefinite Quantity (IDIQ) Task Order Contracts in support of Natural Resources Conservation Service (NRCS) Programs
C. Page 105 of 187, Section J – Delete this page and substitute the attached Page 105 annotated “Attachment 3, Amendment 0001.”
D. Page 115 of 187, Section L, Paragraph L.13 a.(2), first line – Between “SF – 1442 and” and “bid schedule”, insert “OF 347,”.
E. Page 116 of 187, Section L , Paragraph L.15, Item (4), Factor 4 – Add the following at the end of this paragraph: “Discuss how you will meet NPDES requirements with the Arkansas Dept. of Environmental Quality. This should be a generic plan that covers most small jobs. Site specific plans may be required for large task orders.
F. Page 116 of 187, Section L, Paragraph L.16, first line – Between “SF – 1442” and “the completed bid schedule” insert “, OF 347, and ”.
G. Page 116 of 187, Section L, Paragraph L.16, second line – Between the words “project,” and “and”, add the following: “along with signed and dated amendments to the solicitation, if any,”
H. Page 136 of 187, Technical Specifications, Paragraph 9 – Delete the section starting with “9.CHECKOUT SURVEYS” through the end of the page, ending with “20 feet apart.” and substitute the following:
“9. LAYOUT AND CHECKOUT SURVEYS
The surveys shall be performed using Global Positioning System (GPS) equipment. The centerline of the top of the levee will be staked and profiled with shots no more than 100 feet apart. For levees that have curves, shots will be taken at the start, middle, and end of each curve. This will result in layout and plotting the levee to show the actual shape instead of a straight line. The first and last end area for yardage will be based on the first and last full top of levee station or template. No yardage will be computed for the sloped ends of the levee.
A cross section for layout and checkout will be taken every 500 feet, or one section for levees less than 500 feet long. The minimum number of shots will be the toe, half way up the slope, top edge, and centerline of the levee.
The centerline profile will extend past the emergency spillway to identify that the normal ground rises enough to contain the emergency spillway flow. The profile shall extend a minimum of 100 feet, with shots no farther than 20 feet apart. A profile of the emergency spillway is required to show the upstream, control section, and downstream flow area of the spillway. The profile shall extend a minimum of 100 feet upstream and downstream with shots no more than 20 feet apart.
NRCS shall perform the yardage computations for payment.”
SF 30
Solicitation No. AG-7103-S-09-0013 Amendment No. 0001 Multiple Award, Indefinite Delivery, Indefinite Quantity (IDIQ) Task Order Contracts in support of Natural Resources Conservation Service (NRCS) Programs
I. Page 162 of 187, Technical Specifications – Delete next to last paragraph starting with “A construction check . . .” and replace with the following: “Construction layout and checkout surveys are required by the contractor.
janet.holmes Text Box Attachment 1
Map of Lonoke, AR 72086
When using any driving directions or map, it's a good idea to do a reality check and make sure the road still exists, watch out for construction, and follow all traffic safety precautions. This is only to be used as an aid in planning.
Page 1 of 1Map of Lonoke, AR 72086
3/24/2009http://maps.yahoo.com/print?mvt=m&tp=1&stx=&fcat=&frat=&clat=34.587276&clon=-92.0410...
janet.holmes Callout Shop janet.holmes Text Box Attachment 2
Section J List of Documents, Exhibits and Other Attachments
Pages Page No.
1. Wage Determination 4 119
2. NRCS OSHA Supplement 8 123
3. Specifications/Drawings 25 131
4. Sample Project – England Joint Venture 21 156
5. Sample Quality Control Plan 2 177
6. Sample Safety Plan 9 179
7. Contractor’s Technical Proposal*
8. Amendments*
*To be inserted at time of award.
**Sections K, L and M shall be part of a resultant contract even though the sections are not physically attached to the contract.
Page 105 of 187 Solicitation No. AG-7103-S-09-0013
Attachment 3, Amendment 0001
File details come from the government source that posted it. Updated .