DESCRIPTION OF MAJOR ITEMS OF WORK

Reckrodt Site, Gangadeen Site, Quinley Site & Bucks at the Bluff Site

Construction of four (4) wetland sites consisting of approximately:

14,670 CY .............Berm - Earthfill

11,765 CY .............Spoil Berm - Earthfill

280 LF ..............12 inch Diameter Welded Steel Pipe

147 LF ..............18 inch Diameter Welded Steel Pipe

15.2 AC .............Seeding and Mulching

1 EA .............4’ Concrete Box Water Control Structure

1 EA .............12”x2’ Water Control Structure

1 EA .............12”x3’ Water Control Structure

` 1 EA .............12”x4’ Water Control Structure

1 EA .............18”x2’ Water Control Structure

1 EA .............18”x4’ Water Control Structure

Sullivan and Putnam Counties WRP Restoration

NRCS Office, 1100 Morton Parkway Chillicothe, MO 64601 (660)646-6220

Prepared By: B Michael Holcer

Title:.NRCS Civil Engineering Technician

Date Prepared: 3/5/2015 Natural Resources Conservation Service United States Department of Agriculture

Oriel.Velez Typewritten Text

Oriel.Velez Typewritten Text

ATTACHMENT D