SectJ-Atch4_Exhbt-A_CDRLs-Data_S-11-0003-02_12sep11.pdf
PDF 1 MB Posted
- Attached to
- USDA NRCS MISSOURI ZELL EWP-FPE WETLAND RESTORATION FEDERAL CONSTRUCTION CONTRACT IN LINN COUNTY, MO
- Solicitation number
- AG-6424-S-11-0003
About this file
Section J-Attachment 4 (Revised Exhibit A CDRLs) for Solicitation/IFB Number AG-6424-S-11-0003 Amendment 02.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NUMBER: AG-6424-S-11-0003, AMENDMENT #02
SECTION J - ATTCHMENT 4
Zell EWP-FPE Restoration Federal Construction Contract for Linn County, Missouri
EXHIBIT A - CDRLs
Document Date: 12 Sep 11 Document Version: 1.1 Page 1 of 4
SECTION J - ATTACHMENT 4
EXHIBIT A (DATA REQUIREMENTS)
CONTRACT DATA REQUIREMENTS LIST (CDRL)
DATA, REPORTS & OTHER CRITICAL INFORMATIONAL DELIVERABLES
COVER PAGE
FOR
DATA REPORT NUMBER A003 AND A011
DD Form 1423-1 documents and a summary follow for each CDRL data delivery as specified on the Solicitation/IFB Amendment #02.
*NOTE: Regarding Section J - Attachment 4, Exhibit A - Data Requirements, this Cover Sheet is
Page 1 of 4 as revised per Amendment #02. Page 2 of 4 contains a summary of all data deliverable requirements applicable to this Solicitation/IFB as revised per Amendment #02.
Pages 3 through 4 contain two individual data deliverables that shall be delivered as specified on each DD Form 1423-1 while performing the requirements of the contract, as revised per
Amendment #02. Amendment #02 does not affect nor change the following previous CDRLs as expressed on the initial Solicitation/IFB: A001; A002; A004; A005; A006; A007; A008;
A009; A010; A012; and A013. CDRL A014 (As-Built Drawings, Final) has been removed entirely as a result of Amendment #02.
SOLICITATION NUMBER: AG-6424-S-11-0003, AMENDMENT #02
SECTION J - ATTCHMENT 4
Zell EWP-FPE Restoration Federal Construction Contract for Linn County, Missouri
EXHIBIT A - CDRL SUMMARY
Document Date: 12 Sep 11 Document Version: 1.1 Page 2 of 4
SECTION J - ATTACHMENT 4
EXHIBIT A (CDRL SUMMARY)
DATA REPORT DATA REPORT AUTHORITY CONTRACT DATE OF FREQUENCY OF
# TITLE FOR INCORPORATION REFERENCE 1ST SUBMISSION DELIVERY
A001 Performance Bond 52.228-15(b)(1) SF 1442, Block 12A 10 days after NOCA Once, unless needed
A002 Payment Bond 52.228-15(b)(2) SF1442, Block 12A 10 days after NOCA Once, unless needed
A003 Construction Schedule 52.236-15, 452.236-75(a) Part I, Section F Clauses 10 days after NOCA Once, unless needed
A004 Work Schedule 452.236-75(b) Part I, Section F Clauses 10 days after NOCA Once, unless needed
A005 Quality Control Plan 46.402 Various throughout 10 days after NOCA Once, unless needed
A006 Safety Plan/Program Appendix A (OSHA) Section A, Paragraph 1.1 10 days after NOCA Once, unless needed
A007 Insurance Certification Appendix A (OSHA) Section A, Paragraph 1.9 10 days after NOCA Once, unless needed
A008 Hoist Operator Annual Physical Appendix A (OSHA) Section C, Paragraph 3.2 10 days after NOCA Once, unless needed
A009 Test Certification for Cranes, Hoists, etc. Appendix A (OSHA) Section E, Paragraph 5.4.5 10 days after NOCA Once, unless needed
A010 Safety Report Appendix A (OSHA) Various throughout 1 st month after NTP Monthly, or as needed
A011 Contract Status Report 46.402 Various throughout As specified Monthly or w/ Payments
A012 Samples and Certificates (Materials) 452.236-76 Part I, Section H Clauses To be determined As needed
A013 Safety Variance/Waiver Appendix A (OSHA) Introduction To be determined As needed
File details come from the government source that posted it. Updated .