Attachment I Wage Rate Determination

View the file

Other files for this federal contract opportunity

Other files attached to Construction of Mesocosm Research Structure, newest first.
File Type Posted
SF-30 Amendement Two.rtf RTF text file
Amended Section B.doc DOC document
SF-30 Amendement One.rtf RTF text file
AG-63PX-S-08-0001 Solicitation.doc DOC document
Geotechnical Report.PDF PDF
sf24.pdf PDF
AG-63PX-S-08-0001 Return Offer.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: MI080027 04/11/2008 MI27

Superseded General Decision Number: MI20070027

State: Michigan Construction Type: Building

Counties: Baraga, Gogebic, Houghton, Iron, Keweenaw and Ontonagon Counties in Michigan.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/21/2008 3 04/04/2008 4 04/11/2008

ASBE0049-004 06/05/2007

GOGEBIC AND ONTONAGON COUNTIES:

Rates Fringes Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems..........$ 24.37 18.85

ASBE0127-001 05/28/2006

BARAGA, HOUGHTON, IRON AND KEWEENAW COUNTIES:

Rates Fringes Insulator/asbestos worker Includes the application of all insulating materials; protective coverings, coatings, and finishings to all types of mechanical systems.......$ 26.44 14.68

BOIL0169-001 01/01/2007

Rates Fringes

BOILERMAKER......................$ 29.877 20.234

BRMI0006-001 05/01/2007

Rates Fringes Bricklayer; plasterer;

marble, terrazzo and tile setter...........................$ 23.71 12.99

CEMENT MASON/CONCRETE FINISHER...$ 23.71 12.99

Pointer, caulker and cleaner.....$ 23.71 12.99

FOOTNOTES: Stacks: Work on industrial and powerhouse stacks shall receive $2.00 per hour above the journeyman bricklayer rate.Industrial: Refinishing work on digesters, tanks, lime kilns, chests, boilers, and boiler tubes shall receive $2.00 per hour above the journeyman bricklayer rate.

CARP1510-005 06/01/2007

Rates Fringes CARPENTER (Includes concrete forms)...........................$ 24.82 11.01 Diver............................$ 33.045 7.51

LATHER...........................$ 23.04 6.07

MILLWRIGHT.......................$ 29.03 11.23

Piledriver.......................$ 25.02 11.01

FOOTNOTES: Waterfront work on the Great Lakes or connecting water navigable to Lake carriers: $0.20 per hour additional. Work on industrial construction, defined as industrial manufacturing and processing plants such as ore plants, paper mills, power houses, foundries, saw mills, wood processing plants, or other industrial complexes: $.25 per hour additional.

ELEC0219-003 06/04/2007

BARAGA, GOGEBIC, HOUGHTON, KEWEENAW AND ONTONAGON COUNTIES:

Rates Fringes ELECTRICIAN (Excludes low-voltage work) Electrical contracts of $90,000 or less.............$ 24.53 14.34 Electrical contracts over $90,000.....................$ 26.73 14.40

FOOTNOTES: All industrial work over 30 ft. above the ground, unless on solid flooring or grating permanently attached in place: 10% per hour additional. Over 60 ft.: 20% per hour additional. Over 90 ft.: 30% per hour additional. Work performed within 3 ft. of an unguarded opening at the above-mentioned heights to receive the above-mentioned premiums. Work in underground mines, except mine shaft work: 10% per hour additional.

ELEC0219-010 06/04/2007

IRON COUNTY:

Rates Fringes ELECTRICIAN (Excludes low-voltage work) Electrical contracts of $90,000 or less.............$ 24.53 14.34 Electrical contracts over $90,000.....................$ 26.73 14.40

FOOTNOTES: All industrial work over 30 ft. above the ground, unless on solid flooring or grating permanently attached in place: 10% per hour additional. Over 60 ft.: 20% per hour additional. Over 90 ft.: 30% per hour additional. Work performed within 3 ft. of an unguarded opening at the above-mentioned heights to receive the above-mentioned premiums. Work in underground mines, except mine shaft work: 10% per hour additional.

ENGI0324-009 05/01/2007

Rates Fringes Power equipment operators:

(Includes underground work) Crane operator, main boom & jib 120' or longer........$ 26.97 15.47 Crane operator, main boom & jib 140' or longer........$ 27.22 15.47 Crane operator, main boom & jib 220' or longer........$ 27.47 15.47

GROUP 1.....................$ 26.47 15.47

GROUP 2.....................$ 23.22 15.47

GROUP 3.....................$ 22.64 15.47

GROUP 4.....................$ 21.70 15.47

Mechanic with truck and tools.......................$ 27.97 15.47

FOOTNOTES: Swing boom truck operator over 15 tons:$.50 per hour additional. Hydraulic crane operator 75 tons and under:$.75 per hour additional. Hydraulic crane operator over 75 tons:$1.00 per hour additional. Lattice boom crane operator:$1.50 per hour additional. Crusher pits, shafts and tunnel workers:$2.00 per hour additional. Premium rate:

main boom and jib 300 feet or longer is $1.50 per hour above the 220 ft. boom and jib rate. Premium rate: main boom and jib 400 feet or longer is $3.00 per hour above the 220 ft. boom and jib rate.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Regular equipment operator , backhoe, crane, dozer, front end loader, job mechanic, pumpcrete and squeezecrete, welder, concrete pump, excavator, milling and pulverizing machines,scraper (self-propelled and tractor drawn), welder

GROUP 2: Air track drill, boom truck (non-swing), concrete mixer, material hoist and tugger, pump 6" and over, beltcrete, sweeping machine, trencher, winches, well points and freeze systems

GROUP 3: Air compressor, conveyor, concrete saw, farm tractor (without attachments), fork truck, generator, guard post driver, mulching machine, pumps under 6-in., welding machine and grease person

GROUP 4: Oiler, fire tender, heater operator, brock concrete breaker, elevators (other than passenger), end dumps and skid steer.

Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate.

Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00)

* ENGI0325-006 10/01/2007

Rates Fringes Power equipment operators -hazardous waste removal:

LEVEL A:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator...................$ 30.79 15.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.47 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.77 15.75

GROUP 1....................$ 29.82 15.75

GROUP 2....................$ 25.42 15.75

LEVEL B AND C:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operators..................$ 29.84 15.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.41 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 31.73 15.75

GROUP 1....................$ 28.87 15.75

GROUP 2....................$ 24.48 15.75

LEVEL D WHEN CAPPING

LANDFILL:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operators..................$ 28.29 15.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 29.97 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.27 15.75

GROUP 1....................$ 27.32 15.75

GROUP 2....................$ 22.93 15.75

LEVEL D:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operators..................$ 28.54 15.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.22 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.52 15.75

GROUP 1....................$ 27.57 15.75

GROUP 2....................$ 23.18 15.75

HAZARDOUS WASTE REMOVAL CLASSIFICATIONS

GROUP 1: Backhoe, batch plant operator, clamshell, concrete breaker when attached to hoe, concrete cleaning decontamination machine operator, concrete pump, concrete paver, crusher, dozer, elevating grader, endloader, farm tractor (90 h.p. and higher), gradall, grader, heavy equipment robotics operator, loader, pug mill, pumpcrete machines, pump trucks, roller, scraper (self- propelled or tractor drawn), side boom tractor, slip form paver, slop paver, trencher, ultra high pressure waterjet cutting tool system operator, vactors, vacuum blasting machine operator, vertical lifting hoist, vibrating compaction equipment (self-propelled), well drilling rig, slope paver, hydro excavator

GROUP 2: Air compressor, concrete breaker when not attached to hoe, elevator, end dumps, equipment decontamination operator, farm tractor (less than 90 h.p), forklift, generator, heater, mulcher, pigs (portable reagent storage tanks), power screens, pumps (water), stationary compressed air plant, sweeper, welding machine and water wagon

ENGI0326-019 05/01/2007

Rates Fringes Power Equipment Operators - Steel Erection:

Compressor, welder and forklift....................$ 23.62 15.47 Crane operator, main boom & jib 120' or longer........$ 27.37 15.47 Crane operator, main boom & jib 140' or longer........$ 27.62 15.47 Crane operator, main boom & jib 220' or longer........$ 27.87 15.47 Mechanic with truck and tools.......................$ 28.37 15.47 Oiler and fireman...........$ 22.32 15.47 Operator....................$ 26.87 15.47

Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate.

Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00)

IRON0008-008 05/01/2006

Rates Fringes Ironworkers:

Contracts $10,000,000 or greater.....................$ 25.12 16.69 Contracts less than $10,000,000.................$ 22.33 16.69

IRON0008-010 05/01/2006

Rates Fringes Ironworker - pre-engineered metal building erector Contracts $10,000,000 or more........................$ 25.12 16.69 Contracts less than $10,000,000.................$ 22.33 16.69

LABO0334-013 07/01/2007

Rates Fringes Landscape Laborer

GROUP 1.....................$ 18.13 5.30

GROUP 2.....................$ 13.93 5.30

LANDSCAPE LABORER CLASSIFICATIONS

GROUP 1: Landscape specialist, including air, gas and diesel equipment operator and lawn sprinkler installer

GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender

LABO1329-001 05/01/2007

Rates Fringes Laborers:

Commercial Construction

GROUP 1....................$ 19.68 9.35

GROUP 2....................$ 20.08 9.35

GROUP 3....................$ 20.43 9.35

GROUP 4....................$ 17.73 9.35

GROUP 5....................$ 21.73 9.35

Industrial Construction

GROUP 1....................$ 21.24 9.35

GROUP 2....................$ 21.64 9.35

GROUP 3....................$ 21.99 9.35

GROUP 4....................$ 17.83 9.35

GROUP 5....................$ 23.29 9.35

FOOTNOTE: Work on waterfront work (working over water) on the Great Lakes or connecting waters navigable to lake carriers: $0.75 per hour additional.

LABORER CLASSIFICATIONS

GROUP 1: All construction laborers on building and heavy construction work, storm and sanitary sewers, tool crib attendant, Civil Engineer helper, rodman, oxi-gun operator, workers using propane or acetylene cutting torch, motor-driven buggies, chipping hammers, tamping machines, green cutting (whether run by air, electric or gas), sandblasters, mason tenders, Mortar mixer, material mixer (whether done by hand or machine), vibrator operator, concrete mixer, laborer with concrete crew, mixer to pour, including pour from trucks

GROUP 2: Cement gun nozzle operator, blaster, miner, driller, buster operator, layer of all non-metallic pipe

GROUP 3: Caisson worker and airtrack

GROUP 4: Watchman, Fire watch and Hole watch

GROUP 5: Digester, tanks & kilns

PAIN1011-001 06/01/2007

Rates Fringes Drywall Finisher and foam applicator.......................$ 23.28 7.99

PAINTER

Work on iron ore processing plants, water tanks, petroleum tanks, chemical tanks or vessels, towers, bridges, radio and television towers, church steeples, blast furnaces, smoke stacks, flag poles, aircraft hangers, power plants, heating plants, water treatment plants and buildings affixed to or included in an industrial complex and paper mills.....$ 21.50 7.99 Work on multiple housing units and all housing units over 4 stories, offices, stores , banks, cammercial garages, gas stations, restaurants, motels, hotels, theaters, depots, churches, commercial warehouses, marinas, schools, dormatories, funeral homes and all other like structures..................$ 19.01 7.99

FOOTNOTES: High pay (bridges, overpasses, watertowers): 30 to 80 ft.: $.65 per hour additional. 80 ft. and over: $1.30 per hour additional.

PLUM0506-019 06/01/2006

BARAGA, HOUGHTON, KEWEENAW AND ONTONAGON COUNTIES:

Rates Fringes Plumbers and Pipefitters (Includes HVAC piping)...........$ 26.20 16.35

FOOTNOTES: Welders working on Chrome Moly or PP Stamp work:

$.50 per hour additional. Workers working in a confined space as defined in Title 29 Code of Federal Regulations 1910.146, and required to wear a selfcontained breathing apparatus: $1.00 per hour additional. Workers working with or around hazardous materials as specified in Title 29 Code of Federal Regulations 1926.65, and required to wear protective rubber gloves, boots and a selfcontained breathing apparatus or a complete hazardous materials protective bodysuit (Level B or more protective): $1.00 per hour additional.

PLUM0506-020 06/01/2006

GOGEBIC AND IRON COUNTIES:

Rates Fringes Plumbers and Pipefitters (Includes HVAC piping)...........$ 26.20 16.35

FOOTNOTES: Welders working on Chrome Moly or PP Stamp work:

$.50 per hour additional. Workers working in a confined space as defined in Title 29 Code of Federal Regulations 1910.146, and required to wear a selfcontained breathing apparatus: $1.00 per hour additional. Workers working with or around hazardous materials as specified in Title 29 Code of Federal Regulations 1926.65, and required to wear protective rubber gloves, boots and a selfcontained breathing apparatus or a complete hazardous materials protective bodysuit (Level B or more protective): $1.00 per hour additional.

ROOF0149-014 05/01/2006

Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 15.75 8.20 Slater...........................$ 17.90 8.20

SFMI0669-005 04/01/2008

Rates Fringes

SPRINKLER FITTER.................$ 31.46 14.30

SHEE0007-006 06/01/2006

Rates Fringes Sheet metal worker (Includes HVAC duct work)..................$ 26.62 15.40

TEAM0328-001 05/01/2003

Rates Fringes Truck drivers:

GROUP 1.....................$ 19.62 3.76/hr.+ a GROUP 2.....................$ 19.77 3.76/hr.+ a GROUP 3.....................$ 19.83 3.76/hr.+ a GROUP 4.....................$ 19.98 3.76/hr.+ a

FOOTNOTE:

a. $17.80 per day

PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day and Thanksgiving Day, if the regular work day immediately preceding or following the holiday is either worked or an excused absence.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: All other trucks GROUP 2: Heavy duty, double axle and semi trucks GROUP 3: Truck repair and maintenance GROUP 4: Euclid type equipment

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION