Attachment_1 _Statement_of_Work.pdf

PDF 176 KB Posted

Attached to
Install Security Upgrades, National Centers for Animal Health, Ames
Solicitation number
AG-6395-S-17-0022
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
Attachment_2._Wage_Determination.pdf PDF
AG-6395-S-17-0022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

- For Official Use Only -

November 1, 2016

UNITED STATES DEPARTMENT OF AGRICULTURE (USDA)

ANIMAL and PLANT HEALTH INSPECTION SERVICE (APHIS)

National Centers for Animal Health (NCAH);

Building 20

Ames, Iowa 50010

Solicitation AG-6395-S-17-0022 Attachment 1

TABLE OF CONTENTS

SECTION TITLE PAGE

01 SUMMARY OF WORK 5 - 9

02 WORK RESTRICTIONS 10 - 11

03 MATERIALS AND EQUIPMENT 12 - 14

04 EQUIPMENT INSTALLATION 14 - 16

05 PROJECT CLOSEOUT 16 - 19

This Page Intentionally Left Blank

SECTION 01 SUMMARY OF WORK

PART 1: GENERAL

1.1 DESCRIPTION

1. The intent of this specification is to provide the National Centers for Animal Health, specifically; located at 1920 Dayton Ave, Ames, Iowa 50010, with a package of security measures consisting of Intrusion Detection modifications that will enhance the protection of the facility, assets and safety of personnel.

2. The contractor shall procure, provide and install electronic and non-electronic security upgrades that will satisfy the sites specific security needs. The contractor shall provide, install and integrate all intended security modifications into the site’s existing security platform and system.

3. The existing Access Control and Intrusion Detection System components located in the building must remain operational throughout the entire period of performance for this project.

Any work performed, including temporary disconnection and cut-over to the intended system, must be coordinated in advance with the Contracting Officer’s Representative.

4. The contractor shall provide and install all equipment (except where noted in item #1 of this paragraph), devices, system components, hardware and firmware, wire and cable, device mounting materials, control cabinets, construction materials and all necessary appurtenances to complete this modification project and provide a turnkey security solution to the Government.

1. The Government will provide only the following equipment and connectivity:

a. Network connectivity at the head end closet(POE capable)

b. Axis F41 processor units

c. LouRoe LE-770 Microphone units

d. Intrusion detection system inputs

5. The contractor shall supply all labor and labor material, including tools, ladders, lifts, power equipment, etc., necessary to complete this project.

6. All work performed shall be coordinated and approved in advance by the Contracting Officer’s Representative.

7. Final placement of all Intrusion Detection equipment and devices shall be coordinated and approved in advance by the Contracting Officer’s Representative.

8. Any contractor provided equipment intended to connect into any information technology (IT) equipment belonging to the APHIS, including, but not limited to hubs, switches, routers and/or the APHIS LAN backbone/infrastructure shall meet, at minimum, the standards and requirements for computer security as defined by the APHIS Office of the Chief Information

Officer (OCIO).

9. The complete security package including all equipment and components shall be compatible with, installed and integrated into the NCAH’s existing N-Tiered Enterprise Physical Access Control System (ePACS).

10. Office and Common Areas: In finished areas, system wire may be "fished" into concealed spaces, above ceilings, and in wall cavities. Wire run above suspended ceilings shall be fastened in a manner that it is supported off of the ceiling. Where concealing wire is impractical, wire shall be run in electrical metallic tubing (EMT), intermediate metallic tubing (IMC) or rigid conduit. Wire and wire housing installation methods shall be approved in advance by the Contracting Officer’s Representative.

11. Office and Common Areas: In unfinished, exposed areas, wire shall be run in electrical metallic tubing (EMT), intermediate metallic tubing (IMC) or rigid conduit. Wire and wire housing installation material and methods shall be approved in advance by the Contracting Officer’s Representative.

12. Laboratory, Research and Diagnostic Procedure Areas: In all exposed areas, weather/water resistant metallic based conduit, boxes and fittings shall be utilized. All conduit shall be installed and spaced at least 3/4” away from wall surfaces. All associated boxes may be installed flush to the wall surface, however, silicone based sealant shall be installed to prevent material from penetrating the back of surface mounted boxes. Wire, wire housing and silicone sealant installation material and methods shall be approved in advance by the Contracting Officer’s Representative.

1.2 REGULATORY REQUIREMENTS

A. The equipment (system control panels and devices specified), materials, installation, workmanship and operation shall conform to the most stringent applicable requirements of the most recent editions of the following publications and this specification unless otherwise noted:

1. National Fire Protection Association (NFPA)

a. NFPA 70 - National Electrical Code

b. NFPA 72 - National Fire Alarm Code

c. NFPA 101 - Safety to Life from Fire in Buildings and Structures

d. NFPA 1 - Uniform Fire Code

e. NFPA 5000 – Building Construction and Safety Code

2. Underwriters Laboratories, Inc. (UL)

a. Appropriate UL Standards

3. State and Local Building Codes as adopted by the Authority Having Jurisdiction (AHJ)

4. The Uniform Federal Accessibility Standards (UFAS)

5. Occupational Safety and Health Administration (OSHA)

6. Equipment Manufacturer Printed Instructions

1.3 COORDINATION

A. The contractor shall coordinate all work with the Contracting Officer's Representative.

B. The contractor shall submit an installation schedule for review and approval by the Contracting Officer's Representative within ten (10) days of purchase order award.

C. The contractor shall be solely responsible for coordinating work with all subcontractors and ensuring that all items of joint use in conjunction with installations are completed.

1.4 INTENT OF CONTRACT DRAWINGS

A. Government provided drawings, henceforth referred to as “Contract Drawings”, do not attempt to show complete details of building construction that may affect installation. Government provided diagrams of proposed systems are for reference only and do not necessarily show physical arrangement of all equipment and/or maximum number of devices. Minimum system requirements are shown.

B. Devices are shown diagrammatically only. System layout does not necessarily show maximum number of system components and should not be used for obtaining quantities for linear runs of conduits and wires. The contractor shall provide all conduits and wire wherever needed to complete installation of specific equipment required and provided by the contractor.

C. Locations of existing and Government concept devices are approximate and may be distorted for clarity in representation.

1.5 ACCESS TO SITE AND TRAFFIC RESTRICTIONS

A. Access to each individual site shall be arranged by the Contracting Officer's Representative according to the schedule submitted by the contractor and approved by the Contracting Officer’s Representative. The contractor shall coordinate and schedule his/her work under this contract to cause the least interference with the normal flow of visitor and employee traffic.

B. Available Work hours shall be Monday through Friday, 08:00 a.m. to 4:30 p.m., excluding Government holidays. Requests for exceptions to this schedule shall be made in writing forty-eight (48) hours in advance and approved by the Contracting Officer's Representative.

1.6 TIME FOR COMPLETION

A. All work on this project shall be completed within 30 calendar days from Notice to Proceed.

1.7 SPECIAL PROVISIONS

A. The building where work will be performed is a bio-security facility and contains biohazard materials; therefore, the contractor must complete any area specific training before entry and follow bio-security procedures for entering and exiting the facility. In addition, any tools or equipment carried into the facility must be decontaminated before they can be removed from the facility.

B. The contractor shall confine all operations to within the work limits of the project and exercise special care to maintain natural surroundings undamaged. Building surfaces that have been altered for the installation of system equipment shall be refinished to match original condition by skilled personnel of the trades involved at no additional expense to the Government.

C. Finished surfaces of existing facilities that are affected, marred, scratched, or damaged by the contractor shall be refinished to match original condition.

1. Patching material shall be of the same type, style, and thickness, and shall be finished to match existing adjacent surface construction in color and texture.

2. Patching material, paint color, paint material and paint application methods shall be approved in advance by the Contracting Officer’s Representative.

D. No building structural members shall be cut or altered without prior approval of the Contracting Officer's Representative.

E. Any damage resulting from contractor's operation shall be brought to the attention of the Contracting Officer's Representative immediately.

F. The contractor shall take all necessary and reasonable measures to keep the work site clean of trash and debris. Work areas shall be cleaned immediately as work in that area is completed, and before moving to a new work site. Place all trash and debris in OSHA approved containers, remove, and dispose of trash off site daily.

G. The contractor shall move all materials and equipment, including ladders and scaffolding from the site at the completion of each day's operation unless otherwise approved by the Contracting Officer's Representative.

H. The contractor shall provide proper safety equipment to workmen and ensure a safe environment for employees and the general public at all times. The contractor shall work to ensure free, unobstructed, and safe access to and about the work area.

END OF SECTION

SECTION 02 WORK RESTRICTIONS

PART 1: GENERAL

1.1 USE OF PREMISES

A. Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the work is approved.

B. Keep driveways and entrances serving premises clear and available to the Government, employees, visitors and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

C. Limited parking may be available on the site away from each facility.

D. All contractor staff shall pass an appropriate APHIS designated background investigation before performing any work. The contractor personnel who will perform work at the USDA, NCAH facilities will be required to complete and have a favorable determination of suitability for OFI Form 86C, Special Agreement Checks (SAC) prior to starting work under this contract.

1. The contractor shall provide a list of intended employees to the Contracting Officer’s Representative within three (3) calendar days of task order award.

2. The contractor shall keep the list of employees up to date throughout the project in the event of employee separation and transfer.

1.2 ADHERENCE TO SECURITY POLICIES AND PROCEDURES

A. The Contractor shall adhere to all Site, APHIS and USDA security policies and procedures including Code of Federal Regulations Requirements, Standard Operating Procedures, Security Directives, Security Procedures, General Orders, Post Orders and any applicable Government Policies and Procedures.

1. Failure to adhere to or violation of any above listed requirements, procedures, directives, orders and/or policies may result in criminal prosecution or contractor representative or contractor employee (violator) removal.

1.3 PROJECT ADVERTISEMENT RESTRICTION

A. The contractor shall not advertise in any media, including newsprint, radio, television, company promotional material and/or the World Wide Web (internet web site) any site or system specific information with regard to this project. The following details shall not be made public information:

1. Site name

2. Site address

3. Site mission or assets

4. Security package equipment or component manufacturers

B. The contractor may advertise the following information with regard to this project for company promotional use:

1. Name of Agency; Animal and Plant Health Inspection Service

2. Agency Mission Statement;

a. "Protecting American Agriculture" is the basic charge of the U.S. Department of Agriculture's (USDA) Animal and Plant Health Inspection Service (APHIS). APHIS provides leadership in ensuring the health and care of animals and plants. The agency improves agricultural productivity and competitiveness and contributes to the national economy and the public health.

3. Site city location; Ames, Iowa

4. General security package sub-system information; Access Control and Intrusion Detection Systems.

5. General project cost and construction time period.

SECTION 03 MATERIALS AND EQUIPMENT

PART 1: GENERAL

1.1 DESCRIPTION

A. The work of this section consists of the general procedures for handling, storing, and protecting material and equipment.

B. The work of this section consists of the requirements and specifications of all Physical Security Package equipment and products.

1.2 TRANSPORTATION AND HANDLING

A. Arrange deliveries of materials in accordance with intended construction schedules; coordinate to avoid conflict with work and conditions at the site. Deliver materials in undamaged condition, in manufacturer's original containers or packaging, with identifying labels intact and legible. The contractor is encouraged to obtain materials in biodegradable or recyclable/reusable packaging which uses the minimum amount of packaging possible.

1.3 STORAGE AND PROTECTION

The contractor shall:

A. Properly store, protect, and carefully handle equipment and materials to prevent damage before and during installation. Equipment and materials shall be handled, stored, and protected in accordance with the manufacturer's recommendations and/or instructions. The Contracting Officer’s Representative will identify a room for storage of equipment and tools during installation. In addition:

1. EMT, conduit, wire mold and associated hardware shall be stored to provide protection from the weather and accidental damage.

2. Cable and wire shall be sealed, stored, and handled carefully to avoid damage to the outer covering or insulation, and damage from moisture and weather. Damaged or defective items shall be replaced with new items at no cost to the Government.

C. The contractor shall protect equipment on site; safeguarding of equipment shall be the sole responsibility of the contractor. The Government shall assume no responsibility for loss or damage occurring prior to completion of contract and acceptance of the respective systems.

PART 2: PRODUCTS

2.1 PRODUCTS

A. This section contains the performance based specifications for the major equipment components required for this project. Ancillary equipment necessary to complete this project may not be itemized or listed in this section.

B. Access Control System and Intrusion Detection system

1. The LouRoe Gunshot detector system shall be installed and integrated as part of the existing NCAH owned N-Tiered Enterprise Physical Access Control System (ePACS).

2. All contractor provided equipment and components shall be compatible with accepted NCAH site security standards as provided in previous contracted projects.

C. Wire and Cable

1. All wire and cable shall meet the applicable requirements of NFPA 70 and UL for the type of insulation, jacket, and conductor specified or indicated. Wires and cable manufactured more than twelve (12) months prior to date of delivery to the site shall not be used.

2. All wire and cable utilized for installation of all Intrusion Detection, Access Control, and network system equipment and devices shall meet, at a minimum, MANUFACTURER PRINTED RECOMMENDATIONS and/or INSTRUCTIONS.

3. All Telephone and Data Cable shall be, at a minimum, Category 6, 4 pair, 24 AWG, TWISTED, COPPER, SOLID wire.

SECTION 04 EQUIPMENT INSTALLATION

PART 1: GENERAL

1.1 DESCRIPTION

A. The contractor will complete the following tasks for each alarm sensor and network device:

1. Install the following devices:

• Axis F41 Hardware Encoder, to be mounted according to manufacturer’s specification within twenty feet of the microphone and above the suspended ceiling where possible.

• Louroe LE-770 microphone, to be mounted according to manufacturer’s specification and at a spot determined to be effective at detecting potential gunshots within the defined area.

2. Pull audio cable from microphone to hardware encoder

3. Pull network cable and intrusion detection cable from each F41 hardware encoder to network switch in appropriate data closet

4. Wire all devices

5. Wire each Axis F41 to a unique intrusion detection controller input

6. Provide and install LE-810 Louroe Electronics Embedded option of Analytics Software for Gunshot detection on each Axis F41 device

7. Configure network settings for all Axis F41 devices with government provided network configuration.

8. Provide 1 year Support Assurance for Gunshot Detector Software. Plan should provide for software updates, as well as service and support for one year (LE-850).

B. The contractor shall install complete Intrusion Detection to include all wiring, conduits and associated hardware and required devices, controllers and equipment as set forth within these specifications in the following locations:

Building 20:

Basement

Corridor 0-10 Corridor 0-14 Corridor 0-20

First Floor

Room 1005 Corridor 1-15 Corridor 1100 Corridor 1400 Corridor 1500

Corridor 1800 Corridor 1-23 Corridor 1-39

Second Floor

Open Office 2000(2 devices) Open Office 2010(2 devices) Corridor 2100 Corridor 2400 Corridor 2502 Corridor 2800 Corridor 2-33

Third Floor

Open Office 3000(2 devices) Open office 3019(2 devices) Corridor 3100 Corridor 3402

Building 21:

North West Hallway South West Hallway North East Hallway South East Hallway West Hallway East Hallway

Building 24:

Room 1911 Room 1916 Room 1935 Room 1920

PART 2: EXECUTION

2.1 EQUIPMENT INSTALLATION

A. The contractor shall perform work in accordance with the requirements of the National Fire Protection Association, National Electrical Code and the equipment manufacturer.

B. The contractor shall install system components and system wiring in accordance with the manufacturer's instructions. Manufacturer installation recommendations or instructions shall be considered as MANDATORY methods of installation for the purpose of this contract, unless the Government's specifications are more stringent, in which case the Government's specifications shall be adhered to.

C. The contractor shall label all cabinets, control panels, system component enclosures, splice cans and power supply cans on the inside of each respective enclosure with a commercial grade labeling device.

1. Each respective enclosure label will identify accurately as to use of the enclosure and location of field devices, i.e., controlled doors, area(s) of protection, power distribution, system type, etc.

2. Handwritten labels, or handwritten notes, inside any enclosure WILL NOT be accepted.

3. Labels shall be placed on the inside of each respective enclosure. Labels shall not be placed on the outside of any enclosure.

4. The labeling material, method, adhesion and information shall be approved in advance by the Contracting Officer’s Representative.

D. Provide "EARTH GROUND" system grounding to all system components. Grounding methods shall be approved in advance by Contracting Officer's Representative.

E. The contractor shall install system proximity card reader/keypads forty eight (48) inches above finished floor to bottom of reader.

F. Wiring Specifications and Installation

1. The contractor shall:

a. Follow accepted practices, NEC codes and NFPA standards.

b. Label each circuit connector and cable in each control panel or system enclosure.

c. Permanently label or mark each conductor at both ends with permanent alphanumeric wire markers within four (4) inches of the wire termination. Markers shall be visible.

Wire label information shall be referenced and included in the as-built drawings.

2. All Intrusion Detection System device system wiring shall be "homerun" to their respective control panels. No Access Control or Intrusion Detection devices shall be wired in a series circuit. All end-of-line supervision resistors shall be installed at the device (in the field).

3. All wiring connections and interconnections not terminated under screw terminal blocks shall be made using sealant filled wire crimps. The use of wire nuts or similar type devices is not permitted.

4. No splicing of wires is permitted except within control panels or properly labeled terminal cabinets, and device junction boxes. No splicing of any type shall be permitted in pull boxes (to include crimp terminals).

5. All wiring information shall be included in project close-out submittal documents. Reference Section 05.

2.2 FIRE STOPPING/LABORATORY CONDUIT SEALANT

A. General: Fire stop all holes for conduit, piping, or other penetrations which pass through floor slabs, fire-rated walls, partitions with fire-rated doors, vertical service shafts, or any fire-rated assemblies.

1. Fire stop material shall be designed for use for each specific penetration generated by the contractor.

2. Fire stop material shall offer no less than one (1) hour fire rating.

SECTION 05 PROJECT CLOSEOUT

PART 1: GENERAL

1.1 DESCRIPTION

A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.

PART 2: EXECUTION

2.1 CLEANING

A. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces.

Thoroughly clean building interiors. Pick up all construction debris from the site. At time of final inspection, project shall be thoroughly cleaned and ready for use.

2.2 PROJECT RECORD DRAWINGS

A. AS-BUILT DRAWINGS: Three (3) sets of record drawings shall be prepared for the system.

Drawings shall be legible, neat, complete and easily understood.

B. As-built drawings shall:

1. Reflect only the Access Control and Intrusion Detection Systems and all associated equipment and components. Non-related elements shall not be included on the drawing.

2. Record actual construction, field changes, changes made by change order, details not on original contract drawings/floor plans or shop drawings.

3. Show all sizes and routing of conduit, junction, splice, power supply and control boxes, as well as wire and cable routing. Show each device location with associated device system address.

4. Include all wire and cable numbers.

C. On-site as-built drawings shall be kept up to date continuously during the system installation by the lead technician. Drawings shall be reviewed on a daily basis for accuracy and completeness, and be made available upon request for review by the Contracting Officer’s Representative.

D. All documents and items described above shall be submitted for approval prior to the final acceptance test by Government.

2.3 CLOSEOUT SUBMITTALS

A. Submit before Government Acceptance Test request.

1. Project Record Drawings: As specified above.

2. Warranty Information: As specified in this Section, Sub-Section 3.7.

2.4 PROJECT COMPLETION AND GOVERNMENT ACCEPTANCE TEST

A. Submit written certification that project, or designated portion of project, is complete, and request in writing a Government Acceptance Test. Contracting Officer shall schedule an acceptance test within ten (10) days of receipt of request.

2.5 ACCEPTANCE OF WORK

A. The Government Acceptance Test will only be performed after the contractor’s final system tests are performed and a letter of completion from the contractor is received.

1. Upon completion of the installation and prior to the acceptance test of the system by the Government, the lead technician shall inspect, test, and adjust the complete Access Control and Intrusion Detection Systems.

2. Upon completion of the installation and prior to the Government Acceptance Test, the contractor shall provide to the Contracting Officer written certification confirming that the major systems components have been installed to meet, or exceed, the manufacturer’s minimum system installation requirements as of the date of the letter of completion.

B. Total acceptance of a system will only be made after conducting the Government’s acceptance test. A letter of acceptance will be issued only after conducting the Government’s acceptance test, all deficiencies have been corrected, complete record document package and the instruction period have been provided to the Government.

C. If only designated portions have been inspected, tested, and accepted, a letter of partial acceptance will be issued for that portion of the work. However, final payment may be withheld until a letter of acceptance is issued.

D. The project manager, installing lead technician and the Contracting Officer’s Representative shall be in attendance during all acceptance testing.

E. The contractor shall be responsible for the performance of the final acceptance test and shall, to the satisfaction of the Government, demonstrate the function of the system and verify the correct operation of all system components, circuits, and programming. The contractor shall perform these tests in the presence of the Contracting Officer’s Representative.

F. The Government will use the system record drawings (as-builts), operation manuals, and system documents during the acceptance test procedure to verify the system operation as installed and programmed.

G. Test Equipment: All test equipment, instruments, tools, and labor required to conduct the Government’s acceptance test shall be made available by the installation contractor at the time of the test. The following equipment may be needed for testing:

H. The items tested shall include, but not be limited to, the following:

1. Visual inspection of all installed equipment, components and construction materials.

2. Each alarm initiating device functions as specified and produces the specified functions and notifications to each monitoring location.

3. Any test will initiate the proper system response in compliance with specifications.

4. Check of all documentation for accuracy and completeness.

2.6 DEFECTIVE MATERIAL

A. The contractor shall repair or replace at his/her expense any defective devices, equipment, or wiring. After corrections are made, the contractor shall again perform any and all testing required to demonstrate that the system is in full compliance with the contract drawings and specifications.

2.7 WARRANTY AND REPAIR

A. The contractor shall warranty all work and contractor supplied equipment and materials under this contract for a period of one (1) year from date of final acceptance for each facility and respective system. The contractor will be notified by telephone or letter of all deficiencies occurring during the warranty period.

B. The contractor shall provide repairs and service during the warranty period seven (7) days a week including holidays. Within twenty four (24) hours of a phone call from an authorized Government official, the contractor shall be on-site, determine the problem and submit a plan and schedule for correction and completion of the problem to the Contracting Officer’s Representative.

C. The contractor shall utilize technicians that maintain required licenses and system manufacturer certifications, as required by the appropriate regulatory authority or system manufacturer, and shall be directly related to the specific system (including; hardware, firmware and software versions), equipment and components in need of warranty related repair work.

D. Should the contractor fail to comply with the warranty requirements, the Government will have the option to make the necessary repairs and charge the contractor without any loss of warranty as provided by the contract.

E. Any warranty which is in conflict with the above requirements will not be acceptable.

END OF SPECIFICATIONS

SECTION 01 SUMMARY OF WORK
PART 1: GENERAL
SECTION 02 WORK RESTRICTIONS
1.1 DESCRIPTION
1.2 TRANSPORTATION AND HANDLING
1.3 STORAGE AND PROTECTION
PART 2: PRODUCTS
2.1 CLEANING
2.5 ACCEPTANCE OF WORK