Draft Statement of Work for Coolers- Moss Landing.doc

DOC document 97 KB Posted

Attached to
Walk in cooler purchase and installation
Solicitation number
AG-6395-S-09-0067
Issued by

About this file

Draft specifications

View the file

Other files

File Type Posted
Wage Determination.pdf PDF
ASG-6395-S-09-0067.pdf PDF
sf28.pdf PDF
USDA LBAM SIT Facility Design for Coolers.pdf PDF
USDA LBAM SIT Facility Design for Coolers.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Moss Landing Project Moss Landing Business Park

Purchase & Installation of Walk-in Coolers

Cooler #1:

DESCRIPTION OF COLD BOX

Dimensions:

External (O.D.): 8’0” x 8’0” x 8’0” = w x d x h

Finishes:

Walls:

Galvanized/Embossed (painted white)

26 Ga. – interior & exterior

Ceilings:

26 Ga. – interior & exterior

Panel Thickness:

4” Class 1 U.L. Foam

DOORS:

Qty
Description
1
Finished opening 42” x 78” hinged flush cooler door
1
Pilot Light Switch 120v w/cover (loose)
1
Thermometer – 2 ½” Dial with Standard Lead
1
Kick Plate: 36” Tread Brite (std) – interior and exterior
1
Door – Flush Mount and positioned as in floor plan
1
Door Closer
1
Gasket – Magnetic

ACCESSORIES:

1
Temperature control, thermal bulb.
1
Vapor-proof 4’ Fluorescent Light Fixture (shipped loose)
TBD
Cove Base – Aluminum/Embossed - .032 (4” high)
TBD
Lock Wall Panels to Ceiling Panels (Factory Ceiling Caps – Standard)

REFRIGERATION:

Condensing Unit for Holding Cooler:

Description:
Med Temp Air Cooled Hemetic Remote Outdoor Condensing Unit. Unit will be roof mounted.
Horsepower:
1 hp
Extras:
Defrost Timer, Drier, Sight Glass, Shutoff Valve & Suction Filter installed
Electrical:
208-230/3/60
Conditions:
Room Temp: 35°F Ambient: 95°F

Warranty:

Compressor-motor warranty extended to 5 years, parts only, no labor.

Other Parts – one year warranty.

1x Evaporator (Unit Cooler):

Description:
Air defrost low profile coil
Extras:
Expansion Valve Solenoid and Thermostat shipped loose
Electrical:
208/230/1/60

STATEMENT OF WORK FOR SET-UP AND INSTALLATION

· Installation of Cold Box #1 – see floor plan for location – shall include:

· Complete set-up of cold box

· Complete installation of refrigeration equipment – fan coil, condenser, sight glass, timer, defrost heating. Installation of refrigeration will be done by licensed refrigeration contractor.

· Lighting

· Positioning of floor-mounted condensing unit – see floor plan for location.

· Installation of electrical from breaker panel to cold box. Work to be done by licensed electrical contractor.

Cooler #2:

External (O.D.): 18’0” x 9’0” x 9’0” = w x d x h

Panel Thickness:

DOORS:

Qty
Description
2
Finished opening 42” x 78” hinged flush cooler door
2
Pilot Light Switch 120v w/cover (loose) – 3-way switch
2
Thermometer – 2 ½” Dial with Standard Lead
2
Kick Plate: 36” Tread Brite (std) – interior and exterior
2
Door – Flush Mount and positioned as in floor plan
2
Door Closer
2
Gasket – Magnetic

ACCESSORIES:

1
Temperature control, digital.
2
Vapor-proof 4’ Fluorescent Light Fixture (shipped loose)
TBD
Cove Base – Aluminum/Embossed - .032 (4” high)
TBD
Lock Wall Panels to Ceiling Panels (Factory Ceiling Caps – Standard)
Description:
Med Temp Air Cooled Hemetic Remote Outdoor Condensing Unit. Unit will be roof mounted.
Horsepower:
2.0 hp
Extras:
Defrost Timer, Drier, Sight Glass, Shutoff Valve & Suction Filter installed
Electrical:
208-230/3/60
Conditions:
Room Temp: 35°F Ambient: 95°F

Warranty:

Compressor-motor warranty extended to 5 years, parts only, no labor.

Description:
Air defrost low profile coil
Extras:
Expansion Valve Solenoid and Thermostat shipped loose
Electrical:
208/230/1/60

· Installation of Cold Box #2 – see floor plan for location – shall include:

· Complete set-up of cold box

· Complete installation of refrigeration equipment – fan coil, condenser, sight glass, timer, defrost heating. Installation of refrigeration will be done by licensed refrigeration contractor.

· Lighting

· Positioning of roof-mounted condensing unit

· Installation of electrical from breaker panel to cold box. Work to be done by licensed electrical contractor.

Cooler #3:

DESCRIPTION OF COLD BOX/FREEZER

External (O.D.): 9’4” x 8’0” x 8’2” = w x d x h

Floor:

Standard Finish

5” Class 1 U.L. Foam

Floor:

5” Class 1 U.L. Foam

DOORS:

Qty
Description
2
Finished opening 42” x 78” hinged flush cooler door
2
Pilot Light Switch 120v w/cover (loose) – 3-way switch
2
Thermometer – 2 ½” Dial with Standard Lead
2
Kick Plate: 36” Tread Brite (std) – interior and exterior
2
Door – Mounted 12” high and positioned as in floor plan
2
Door Closer
2
Gasket – Magnetic

ACCESSORIES:

1
Temperature control, thermal bulb.
1
Light Fixture (shipped loose)
TBD
Cove Base – Aluminum/Embossed - .032 (4” high)
TBD
Lock Wall Panels to Ceiling Panels (Factory Ceiling Caps – Standard)
Description:
Low Temp Air Cooled Hemetic Remote Outdoor Condensing Unit. Unit will be roof mounted.
Horsepower:
2 hp
Extras:
Defrost Timer, Drier, Sight Glass, Shutoff Valve & Suction Filter installed
Electrical:
208-230/3/60
Conditions:
Room Temp: -10°F Ambient: 95°F

Warranty:

Compressor-motor warranty extended to 5 years, parts only, no labor.

Description:
Electric defrost low profile coil
Extras:
Expansion Valve Solenoid and Thermostat shipped loose
Electrical:
208/230/1/60

· Installation of Cold Box #3 – see floor plan for location – shall include:

· Complete set-up of cold box

· Complete installation of refrigeration equipment – fan coil, condenser, sight glass, timer, defrost heating. Installation of refrigeration will be done by licensed refrigeration contractor.

· Lighting

· Positioning of floor-mounted condensing unit – see floor plan for location.

· Installation of electrical from breaker panel to cold box. Work to be done by licensed electrical contractor.

· Floor height inside of box will be 12” to match door height

SHIPPING: From Factory to Moss Landing, CA.

INSTALLATION & ELECTRICAL: To be done in Moss Landing, CA.

Cooler #4:

External (O.D.): 6’0” x 10’0” x 8’0” = w x d x h

DOORS:

Qty
Description
1
Finished opening 42” x 78” hinged flush cooler door
1
Pilot Light Switch 120v w/cover (loose)
1
Thermometer – 2 ½” Dial with Standard Lead
1
Kick Plate: 36” Tread Brite (std) – interior and exterior
1
Door – Flush Mount and positioned as in floor plan (Cooler box #1)
1
Door Closer
1
Gasket – Magnetic

ACCESSORIES:

1
Temperature control, thermal bulb.
1
Vapor-proof 4’ Fluorescent Light Fixture (shipped loose)
TBD
Cove Base – Aluminum/Embossed - .032 (4” high)
TBD
Lock Wall Panels to Ceiling Panels (Factory Ceiling Caps – Standard)
Description:
Med Temp Air Cooled Hemetic Remote Outdoor Condensing Unit. Unit will be floor mounted.
Horsepower:
1 hp
Extras:
Defrost Timer, Drier, Sight Glass, Shutoff Valve & Suction Filter installed
Electrical:
208-230/3/60
Conditions:
Room Temp: 35°F Ambient: 95°F

Warranty:

Compressor-motor warranty extended to 5 years, parts only, no labor.

Description:
Air defrost low profile coil
Extras:
Expansion Valve Solenoid and Thermostat shipped loose
Electrical:
208/230/1/60

· Installation of Cold Box #4 –shall include:

· Complete set-up of cold box

· Complete installation of refrigeration equipment – fan coil, condenser, sight glass, timer, defrost heating. Installation of refrigeration will be done by licensed refrigeration contractor.

· Lighting

· Positioning of floor-mounted condensing unit – see floor plan for location.

· Installation of electrical from breaker panel to cold box. Work to be done by licensed electrical contractor.

File details come from the government source that posted it. Updated .