The file's text, extracted by GovTribe without its formatting.
STATEMENT OF WORK
Moss Landing Project Moss Landing Business Park
Purchase & Installation of Walk-in Coolers
Cooler #1:
DESCRIPTION OF COLD BOX
Dimensions:
External (O.D.): 8’0” x 8’0” x 8’0” = w x d x h
Finishes:
Walls:
Galvanized/Embossed (painted white)
26 Ga. – interior & exterior
Ceilings:
26 Ga. – interior & exterior
Panel Thickness:
4” Class 1 U.L. Foam
DOORS:
| 1 |
| Finished opening 42” x 78” hinged flush cooler door |
| 1 |
| Pilot Light Switch 120v w/cover (loose) |
| 1 |
| Thermometer – 2 ½” Dial with Standard Lead |
| 1 |
| Kick Plate: 36” Tread Brite (std) – interior and exterior |
| 1 |
| Door – Flush Mount and positioned as in floor plan |
ACCESSORIES:
| 1 |
| Temperature control, thermal bulb. |
| 1 |
| Vapor-proof 4’ Fluorescent Light Fixture (shipped loose) |
| TBD |
| Cove Base – Aluminum/Embossed - .032 (4” high) |
| TBD |
| Lock Wall Panels to Ceiling Panels (Factory Ceiling Caps – Standard) |
REFRIGERATION:
Condensing Unit for Holding Cooler:
| Description: |
| Med Temp Air Cooled Hemetic Remote Outdoor Condensing Unit. Unit will be roof mounted. |
| Extras: |
| Defrost Timer, Drier, Sight Glass, Shutoff Valve & Suction Filter installed |
| Conditions: |
| Room Temp: 35°F Ambient: 95°F |
Warranty:
Compressor-motor warranty extended to 5 years, parts only, no labor.
Other Parts – one year warranty.
1x Evaporator (Unit Cooler):
| Description: |
| Air defrost low profile coil |
| Extras: |
| Expansion Valve Solenoid and Thermostat shipped loose |
STATEMENT OF WORK FOR SET-UP AND INSTALLATION
· Installation of Cold Box #1 – see floor plan for location – shall include:
· Complete set-up of cold box
· Complete installation of refrigeration equipment – fan coil, condenser, sight glass, timer, defrost heating. Installation of refrigeration will be done by licensed refrigeration contractor.
· Lighting
· Positioning of floor-mounted condensing unit – see floor plan for location.
· Installation of electrical from breaker panel to cold box. Work to be done by licensed electrical contractor.
Cooler #2:
External (O.D.): 18’0” x 9’0” x 9’0” = w x d x h
Panel Thickness:
DOORS:
| 2 |
| Finished opening 42” x 78” hinged flush cooler door |
| 2 |
| Pilot Light Switch 120v w/cover (loose) – 3-way switch |
| 2 |
| Thermometer – 2 ½” Dial with Standard Lead |
| 2 |
| Kick Plate: 36” Tread Brite (std) – interior and exterior |
| 2 |
| Door – Flush Mount and positioned as in floor plan |
ACCESSORIES:
| 1 |
| Temperature control, digital. |
| 2 |
| Vapor-proof 4’ Fluorescent Light Fixture (shipped loose) |
| TBD |
| Cove Base – Aluminum/Embossed - .032 (4” high) |
| TBD |
| Lock Wall Panels to Ceiling Panels (Factory Ceiling Caps – Standard) |
| Description: |
| Med Temp Air Cooled Hemetic Remote Outdoor Condensing Unit. Unit will be roof mounted. |
| Extras: |
| Defrost Timer, Drier, Sight Glass, Shutoff Valve & Suction Filter installed |
| Conditions: |
| Room Temp: 35°F Ambient: 95°F |
Warranty:
Compressor-motor warranty extended to 5 years, parts only, no labor.
| Description: |
| Air defrost low profile coil |
| Extras: |
| Expansion Valve Solenoid and Thermostat shipped loose |
· Installation of Cold Box #2 – see floor plan for location – shall include:
· Complete set-up of cold box
· Complete installation of refrigeration equipment – fan coil, condenser, sight glass, timer, defrost heating. Installation of refrigeration will be done by licensed refrigeration contractor.
· Lighting
· Positioning of roof-mounted condensing unit
· Installation of electrical from breaker panel to cold box. Work to be done by licensed electrical contractor.
Cooler #3:
DESCRIPTION OF COLD BOX/FREEZER
External (O.D.): 9’4” x 8’0” x 8’2” = w x d x h
Floor:
Standard Finish
5” Class 1 U.L. Foam
Floor:
5” Class 1 U.L. Foam
DOORS:
| 2 |
| Finished opening 42” x 78” hinged flush cooler door |
| 2 |
| Pilot Light Switch 120v w/cover (loose) – 3-way switch |
| 2 |
| Thermometer – 2 ½” Dial with Standard Lead |
| 2 |
| Kick Plate: 36” Tread Brite (std) – interior and exterior |
| 2 |
| Door – Mounted 12” high and positioned as in floor plan |
ACCESSORIES:
| 1 |
| Temperature control, thermal bulb. |
| 1 |
| Light Fixture (shipped loose) |
| TBD |
| Cove Base – Aluminum/Embossed - .032 (4” high) |
| TBD |
| Lock Wall Panels to Ceiling Panels (Factory Ceiling Caps – Standard) |
| Description: |
| Low Temp Air Cooled Hemetic Remote Outdoor Condensing Unit. Unit will be roof mounted. |
| Extras: |
| Defrost Timer, Drier, Sight Glass, Shutoff Valve & Suction Filter installed |
| Conditions: |
| Room Temp: -10°F Ambient: 95°F |
Warranty:
Compressor-motor warranty extended to 5 years, parts only, no labor.
| Description: |
| Electric defrost low profile coil |
| Extras: |
| Expansion Valve Solenoid and Thermostat shipped loose |
· Installation of Cold Box #3 – see floor plan for location – shall include:
· Complete set-up of cold box
· Complete installation of refrigeration equipment – fan coil, condenser, sight glass, timer, defrost heating. Installation of refrigeration will be done by licensed refrigeration contractor.
· Lighting
· Positioning of floor-mounted condensing unit – see floor plan for location.
· Installation of electrical from breaker panel to cold box. Work to be done by licensed electrical contractor.
· Floor height inside of box will be 12” to match door height
SHIPPING: From Factory to Moss Landing, CA.
INSTALLATION & ELECTRICAL: To be done in Moss Landing, CA.
Cooler #4:
External (O.D.): 6’0” x 10’0” x 8’0” = w x d x h
DOORS:
| 1 |
| Finished opening 42” x 78” hinged flush cooler door |
| 1 |
| Pilot Light Switch 120v w/cover (loose) |
| 1 |
| Thermometer – 2 ½” Dial with Standard Lead |
| 1 |
| Kick Plate: 36” Tread Brite (std) – interior and exterior |
| 1 |
| Door – Flush Mount and positioned as in floor plan (Cooler box #1) |
ACCESSORIES:
| 1 |
| Temperature control, thermal bulb. |
| 1 |
| Vapor-proof 4’ Fluorescent Light Fixture (shipped loose) |
| TBD |
| Cove Base – Aluminum/Embossed - .032 (4” high) |
| TBD |
| Lock Wall Panels to Ceiling Panels (Factory Ceiling Caps – Standard) |
| Description: |
| Med Temp Air Cooled Hemetic Remote Outdoor Condensing Unit. Unit will be floor mounted. |
| Extras: |
| Defrost Timer, Drier, Sight Glass, Shutoff Valve & Suction Filter installed |
| Conditions: |
| Room Temp: 35°F Ambient: 95°F |
Warranty:
Compressor-motor warranty extended to 5 years, parts only, no labor.
| Description: |
| Air defrost low profile coil |
| Extras: |
| Expansion Valve Solenoid and Thermostat shipped loose |
· Installation of Cold Box #4 –shall include:
· Complete set-up of cold box
· Complete installation of refrigeration equipment – fan coil, condenser, sight glass, timer, defrost heating. Installation of refrigeration will be done by licensed refrigeration contractor.
· Lighting
· Positioning of floor-mounted condensing unit – see floor plan for location.
· Installation of electrical from breaker panel to cold box. Work to be done by licensed electrical contractor.