2_pg_amend_1_signed_11-18.pdf

PDF 452 KB Posted

Attached to
Bischoff WRP Restoration Project, Dodge County, Wisconsin
Solicitation number
AG-5F48-S-15-0001
Issued by

View the file

Other files

File Type Posted
Att_2_Bischoff_-_Construction_Plans.pdf PDF
Solicitation_AG-5F48-S-15-0001.docx DOCX document
Att_5_Bischoff_-_Site_Map.pdf PDF
Att_4_-_OSHA_1910_1926.docx DOCX document
Att_3_WDOL_WI140015_8-1-14.pdf PDF
SF-1442_Bischoff_final.pdf PDF
Att_1_Bischoff_-_Construction_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Amendment 1

SOLICITATION #AG-5F48-S-15-0001

BISCHOFF WRP RESTORATION PROJECT

DODGE COUNTY, WISCONSIN

Site Showing Participants

NAME REPRESENTING

1. Jeff Siegler Siegler Grading & Excavating, LLC, Elkhorn, WI

2. Rod Paul Aaron Sykes

Solutions 101, Appleton, WI

3. Randy Dunneisen Mike Dunneisen

Dunneisen Excavating, Waterloo, WI

4. Roger Thimm Wondra Construction, Iron Ridge, WI

5. Rusty Curtis Curtis Excavating, Portage, WI

6. Ben Kinas Kinas Excavating, Green Lake, WI

7. Andrew Langum Drax Co, Inc., Sun Prairie, WI

Site Visit Participants 11-17-14
BISCHOFF WRP RESTORATION PROJECT
DODGE COUNTY, WISCONSIN
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 1
Code[0]:
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: TAMARA M. LANIER

Contracting Officer Description[0]: Site showing for the Bischoff Wetland Reserve Program (WRP) Wetland Restoration Project was conducted Monday, November 17, 2014 beginning at 9:30 am.

Site Showing Participants are addressed on page 2 of Amendment 1.

FacilityCode[0]:
Code[2]:
IssuedBy[0]: USDA, NATURAL RESOURCES CONSERVATION SERVICE

8030 EXCELSIOR DRIVE, SUITE 200

MADISON, WI 53717-2906

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: AG-5F48-S-15-0001
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 2
EffectiveDate[0]: 11/18/2014
Dated9B[0]: 11/10/2014
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: 1
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
Signature1[0]:
Signature2[0]:
DateSigned[0]:
DateSigned[1]: 11/18/2014
Copies[0]: 0
CopiesReturned[0]: 0
2014-11-18T19:31:17-0600
TAMARA LANIER

File details come from the government source that posted it. Updated .