Drawings.pdf
PDF 3 MB Posted
- Attached to
- Construction of the BRWPA Channel Outlet Wetland Restoration Program (WRP) Project, Columbia County
- Solicitation number
- AG-5F48-S-10-0014
About this file
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Kinas Price Schedule.pdf | ||
| Amend 1 Petro sewer line Sh 12.pdf | ||
| Amendment 1.pdf | ||
| Amend 1 Petro sewer line Sh 10.pdf | ||
| Amend 1 Petro sewer line Sh 11.pdf | ||
| General Decision Number WI100019 07-02-2010 WI19.doc | DOC document | |
| Price Schedule Section B.xlsx | XLSX spreadsheet | |
| Solicitation Offer and Award-Standard Form 1442 Section A.pdf | ||
| Solicitation Sections C through M.docx | DOCX document | |
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
janet.vosberg Text Box
BID
ITEM UNIT QUANTITY
SHEET
NUMBER
WI CONST
SPEC NO.
1 LUMP SUM JOB
Mobilization and Demobilization 7
* R-O-W Fence Removal and Disposal (970 ft) 6, 7, 8
* Construction Site Pollution Control
3, 6, 18, 19, 20 5
* Silt Fence (1,075 ft) 3, 18, 20
* Tracking Pad 6, 19
* Geotextile, Woven, Type 1 (156 sy) 19
* Clean Stone, 3-6 in (26 cy) 19
* Construction Surveys 3, 5, 10 24
* Clearing (Stumps Removal Only) 9 1
2 LIN FT 1,222 6 - 17
Channel Excavation 2
Sta 0+00 to 12+22 (-3,860 cy)
* Berm Earth Fill 3
* Sta 0+00 to 5+00 (+1,550 cy)
* R-O-W Earth Fill 3
* Sta 18+50 to 21+98 (+2,222 cy)
* Channel Bank Earth Fill
* Sta 4+75 to 5+30 (+78 cy)
3 LUMP SUM JOB
* Rock Riprap (57 cy) 3, 7, 11, 15 9
* Geotextile, Nonwoven, Type 1 (187 sy) 3, 7, 11, 15 13
R-O-W Fence Replacement
By Others (WI DOT)
Clearing (Trees / Brush Removal) 9
By Others (US FWS)
Seeding
By Others (US FWS)
* Subsidiary Item
ESTIMATED QUANTITIES- BRWPA Channel Outlet
Mobilization and Demobilization
Excavation
WORK
Culvert Outlet Protection
Work Performed by Others
Quantities are estimated to the neat lines and grades of in-place materials shown on the construction plan unless otherwise stated. Truck yardage, loose fill, shrinkage, etc., must be calculated and compensated for by the contractor preparing a bid or constructing the project.
POINT #
NORTHING
(FEET)
EASTING
(FEET)
ELEVATION
(FEET) DESCRIP STA
540 545739.0286 2104794.7419 784.50 FG 0+00
564 545750.0700 2104790.5500 784.45 FG 0+12
542 545767.9332 2104791.8598 784.39 FG 0+32
543 545781.9393 2104805.5247 784.28 FG 0+50
544 545783.8360 2104810.0804 784.25 FG 0+55
545 545786.7689 2104817.1249 784.22 FG 0+63
546 545807.8400 2104878.0959 783.93 FG 1+27
547 545824.1365 2104949.0434 783.60 FG 2+00
548 545835.2298 2104997.4035 783.38 FG 2+50
549 545846.0688 2105089.4294 782.96 FG 3+42
550 545853.0712 2105152.8630 782.67 FG 4+06
551 545855.2724 2105176.7556 782.57 FG 4+30
552 545875.0857 2105218.6747 782.36 FG 4+76
553 545889.5397 2105238.7484 782.25 FG 5+01
554 545911.6685 2105249.9728 782.13 FG 5+26
555 545936.0952 2105255.8844 782.02 FG 5+52
556 546029.8759 2105275.1526 781.59 FG 6+47
557 546081.8903 2105283.5786 781.35 FG 7+00
558 546180.5967 2105299.5334 780.90 FG 8+00
559 546279.3112 2105315.5048 780.45 FG 9+00
560 546378.0378 2105331.4707 780.00 FG 10+00
561 546476.7533 2105347.4432 779.55 FG 11+00
562 546575.4646 2105363.4075 779.10 FG 12+00
563 546597.6455 2105366.9951 779.00 FG 12+22
534 545923.6376 2105198.9503 N/A FG RAD C2 N/A
541 545757.2900 2104816.7800 N/A FG RAD C1 N/A
535 545559.6902 2104486.9100 787.50 fg 18+50 536 545586.4780 2104509.8250 787.50 fg 18+85 537 545662.2042 2104596.1467 787.50 fg 20+00 538 545732.2201 2104695.4725 787.50 fg 21+17 539 545767.4299 2104763.5513 787.50 fg 21+98
566 545591.5300 2104657.4900 792.40 CMR INT CL N/A
TBM 1 545753.2040 2105266.4570 811.70 TBM N/A
TBM 2 545847.0260 2105260.4050 787.73 TBM N/A
TBM 3 546616.7500 2105421.4000 788.80 TBM N/A
FILL AREA ALONG ROW FENCE
PROPOSED CHANNEL C/L
BENCHMARKS
| 1-COVER |
| 2-SITE PLAN VIEW |
| 3-CONST NOTES |
| 4-ESTIMATED QUANTITIES |
| 5-TBMS |
| 6-PLAN VIEW1 |
| 7-PLAN VIEW2 |
| 8-11x17PV3 |
| 9-11x17PV4 |
| 10-STAKEOUT |
| 11-11x17 PROF1 |
| 12-11x17 PROF2 |
| 13-11x17 PROF3 |
| 14-11x17 XSEC |
| 15-11x17 XSEC(1) |
| 16-11x17 XSEC(2) |
| 17-11x17 XSEC 3 |
| 18-EROSION CONTROL |
| Untitled |
| 19-TP |
| 20-SF |
| 21-APPENDIX COVER |
| 22-23- APPENDIX SHEETS |
| 2-1: 2 |
| 2-2: 20 |
| 5-3: SITE |
| 5-1: 5 |
| 5-2: 20 |
| 6-1: 6 |
| 6-2: 20 |
| 6-3: 14 |
| 7-1: 7 |
| 7-2: 20 |
| 7-3: 15 |
| 8-1: 8 |
| 8-2: 20 |
| 8-3: 16, 17 |
| 9-1: 9 |
| 9-2: 20 |
| 9-3: 17 |
| 10-1: *FG/fg=FINISHED GROUND |
| 10-2: 10 |
| 10-3: 20 |
| 11-1: 11 |
| 11-2: 20 |
| 12-1: 12 |
| 12-2: 20 |
| 13-1: 13 |
| 13-2: 20 |
| 14-1: 14 |
| 14-2: 20 |
| 15-1: 15 |
| 15-2: 20 |
| 16-1: 16 |
| 16-2: 20 |
| 17-1: 17 |
| 17-2: 20 |
| 18-1: 18 |
| 18-2: 20 |
| 18-3: 19, 20 |
| 19-1: 19 |
| 19-2: 20 |
| 20-1: 20 |
| 20-2: 20 |
| 22-1: Sheet 1 of 2 |
| 23-1: 2 |
| 23-2: 2 |
File details come from the government source that posted it. Updated .