Additional Construction Note Drawing WI-006 Sheet 3 of 7.doc

DOC document 19 KB Posted

Attached to
Construction of the Sedarski/Yeomans Wetland Restoration Project
Solicitation number
AG-5F48-S-09-0005
Issued by

About this file

Updates to solicitation package based upon site visit conducted on 9/2/09. Additional Construction Note Drawing WI-006 Sheet 3 of 7

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional Construction Notes for the Kevin Sedarski and Robert Schackow Project

(to be added to sheet 3 of 7)

7. ALL VEGETATION AND ROOTS SHALL BE STRIPPED FROM THE PROPOSED DITCH FILL. NO VEGETATION SHALL BE USED FOR THE FILL OF THE DITCH.

File details come from the government source that posted it. Updated .