List of Changes to Drawings and Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IsCWRP1_Construction_Drawings_Amendment_1.pdf | ||
| Revised_Bid_Schedule.docx | DOCX document | |
| IsCWRP1_QA.docx | DOCX document | |
| IsCWRP1_Specifications_Amendment_1.pdf | ||
| Amendment_1.pdf | ||
| Site_Showing_Sign_In_Roster.pdf | ||
| Solicitation_and_Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 1 AG-5D21-S-15-0003 Changes made to the Construction Drawings
Coversheet – Bid Schedule
· Revised Bid Numbers
· 9 - Herbicide Application updated to 34.4 ac. (WSG/F 21.2 ac + ROW 13.2 ac)
· 10 - WSG/F Planting updated to 21.2 ac for removed 0.9 ac in Field 1 to match Vegetation Site Preparations currently being done on site. Vegetation Site Preparation is not being done in existing conifer area.
· 11 - ROW Seeding updated to 13.2 ac for adjusted ROW boundaries to match Vegetation Site Preparations currently being done on site. Vegetation Site Preparation is not being done up to edge of road due to shallow road ditches.
· 21 – Alternate Bid 5 updated to 21.2 ac for WSG/F area.
Sheet 9
· Added “Top Length of the Embankment” to Embankment dimension and changed 168 ft dimension length to 170 ft. to match Bid Quantity.
Sheet 11
· Micro Note 1, changed to 2.3 to 5.7 % for new Microtopography detail drawing.
· Veg Note 1, updated CS 490 & 612 names
· Veg Note 3, changed ROW Rd width along Nottawa Rd to match Vegetation Site Preparation currently being done on site. Vegetation Site Preparation is not being done up to edge of road due to shallow road ditches.
· Veg Notes - Added ROW Rd notes #4 for Pleasant Valley Rd and #5 Evart Rd.
· Veg Notes - Moved Co. Drain ROW note down to #6.
· ROW Road Acreage labels adjusted.
· Added Dimensions to show ROW widths.
· Removed WSG/F 0.9 ac in Field 1
· Legend
· Corrected (WSF/F) to (WSG/F)
· Updated WSG/F Acreage to 21.2 Ac
· Updated ROW Rd to 6.1 Ac
Changes made to Construction Specifications
Modified PDF format to include CS footers.
CS6 Seeding, Sprigging, and Mulching 7.B. (4) Changed Seeding Rate in table to ounces instead of pounds.
7.C. Changed acreage from 22.1 ac to 21.2 ac.
7.C. (5) Changed Seeding Rate in table to ounces instead of pounds.
7.D (1) Changed acreage from 15.3 ac to 13.2 ac.
CS 23 Earthfill 10.B.(3) Added “The top length of the Embankment will be measured from the top of the embankment sideslope at the spillway to the toe of the County Drain Spoil as shown on sheet 9 of the Construction Drawings.”
CS 94 Contractor Quality Control
10. A. Renumbered Items so consecutive numbers.
CS 490 Tree and Shrub Site Preparation 5.A.(2) Added “and Non-Microtopography Areas (27.7 ac)” 5.B. (3) Modified WSG/F (21.2) and ROW (13.2) acreages, and the total Herbicide Application Ac (34.4) 5.E. Changed acreage 22.1 ac to 21.2 ac.
MS 548 Corrugated Polyethylene Pipe Removed duplicate and added “This page intentionally left blank.”
MS 551 Coated Corrugated Steel Pipe Removed duplicate and added “This page intentionally left blank.”
MS 592 Geotextile Added “This page intentionally left blank.”