AG-52B1-S-15-0009_PWS_and_ATTACHMENTS.pdf
PDF 1 MB Posted
- Solicitation number
- AG-52B1-S-15-0009
About this file
PWS and Attachments
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CTR_INFORMATION.pdf | ||
| PastPerformanceQuestionaire.doc | DOC document | |
| AG-52B1-S-15-0009_CULTURAL_RESOURCE_REV4_17APR2015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LINE ITEM SCHEDULE
CULTURAL RESOURCE SURVEYS
HOOSIER NATIONAL FOREST
Line Item Estimated Quantity
Unit of Measure
Unit Price Total Price
BASE
PERIOD
0001 714 Acres
OPTION 1
1001 714 Acres
OPTION 2
2001 714 Acres
OPTION 3
3001 714 Acres
OPTION 4
4001 714 Acres
TOTAL
BASE +
OPTIONS
3,570 Acres
STATEMENT OF WORK
C.1 GENERAL SPECIFICATIONS
C.1 -Scope of Services. The Contractor shall provide all services, equipment, facilities, materials, and supplies required for the performance and completion of the function outlined herein.
C.1.1 -Project. The project is a Cultural Resource Survey on the Brownstown Ranger District of the Hoosier National Forest. The project may be located in the following counties on the Brownstown Ranger District in southern Indiana: Brown, Jackson, Lawrence, Martin, Monroe, north half of Orange (reference attached vicinity map). The objectives of the project shall be: (1) to locate and identify all cultural resources judged to be at least 50 years old (2) to provide a complete cultural resource inventory of the area, and (3) to make a preliminary evaluation of the significance of identified historic properties according to the National Register of Historic Places eligibility criteria. To accomplish these objectives, the Contractor shall review existing sources of information on cultural and natural resources in the project area, conduct a complete coverage field reconnaissance, analyze the results of this investigation, and prepare a cultural resource report documenting this information.
C.1.2 - Location. Areas to be inventoried will be identified on 7.5’ topographic maps. All National Forest System (NFS) lands designated within the attachments and/or task orders are included in this contract.
C.1.3 -Government-Furnished Property. The Government shall deliver to the Contractor the following listed materials, supplies, property or services (hereinafter referred to as "Government-furnished property") at the places and time specified below. The Contractor shall be liable for all loss or damage of such delivered Government-furnished property until completion and final acceptance of work required under this contract. If the Government fails to make timely delivery of such Government-furnished property suitable for its intended use, and upon written request from the Contractor, the Contracting Officer shall make an equitable adjustment of contract delivery or performance dates or contract price, or both, pursuant to the "Changes" clause of the General Provisions of this contract.
C.1.3.1 -Property, Data and Services. The Forest Service shall allow the Contractor to review such information in its possession as the Forest Service deems pertinent to the project, including archaeological and historical inventory data, environmental data and reports, early aerial photos, maps, GLO plats, land status atlas, and other relevant information. This shall include the availability of Forest Service personnel and resource specialists for technical consultation as needed for the orderly and efficient development of the project.
C.1.3.2 -The Forest Service shall provide the Contractor with one (1) set of Forest Service topographic maps of the area of undertaking, showing ownership and major features.
C.2 - TECHNICAL SPECIFICATIONS
C.2.1 - Cultural Resource Survey Requirements.
This contract is intended to provide the U.S. Forest Service with technical services related to cultural resource inventory on National Forest Service lands. These technical services will assist in compliance by the Hoosier National Forest with the National Historic Preservation Act, as amended, and the Archaeological Resources Protection Act, as amended. The Contractor shall comply with these Acts.
The Contractor shall:
C.2.1.1 -Meet with Forest Service personnel prior to initiating fieldwork for the purpose of: (1) reviewing the undertaking and discussing the project objectives, (2) reviewing Forest Service cultural resource inventory information, (3) examining pertinent natural resource data, reports, maps, etc., (4) becoming acquainted with the natural and cultural features of the project area, and (5) discussing field plans and coordination with Ranger District personnel.
C.2.1.2 -Conduct a records and interview search sufficient to identify previously known or recorded cultural resources within the areas of undertaking. Sources shall include: (1) Forest Service cultural resource files; (2) Indiana State Historic Preservation Office; (3) the archaeologist or cultural resource paraprofessional for the district; and (4) other pertinent records, publications, or informants.
C.2.1.3 -Conduct a complete coverage reconnaissance sufficient to identify all existing cultural resources within the project boundaries. The reconnaissance will focus on: (1) areas that have less than 20% slope; (2) stream terraces, floodplains, and confluences; (3) ridge tops, ridge spurs, saddles, benches, and watershed divides; and (4) cave and rockshelter areas.
Complete field coverage will consist of a series of on-the-ground transects via systematic subsurface testing to determine the presence or absence of cultural remains in areas where the ground surface is obscured. Intensity of complete field coverage may vary in accordance with known or suspected cultural resource sensitivity and geographic features or obstacles encountered. Transects and subsurface testing intervals shall not exceed 50 feet (15 meters). Subsurface test units shall be a minimum size of 12 in. in diameter (30 cm) and excavated to just below sterile soil. Upon discovery of cultural materials, the testing interval shall be maintained at 15 meters across the site until two negatives are discovered in a transect. To fine tune the site boundary, additional shovel testing will be conducted at a 5 meter interval beyond the last positive and cease with two consecutive negative probes. For example, in each transect, the last positive probe along the northern edge of a site will receive additional 5 meter tests to the north. Similarly, in each transect the last positive probe along the eastern edge of the site will receive additional 5 meter tests to the east, and so on. The purpose of the additional probes is to define the site boundary. In an inventory level survey it is not appropriate to “swiss cheese” shovel test an entire site at a 5 meter interval. Soil removed from all subsurface test units shall be screened through 1/4" mesh hardware cloth and backfilled. Shovel testing is not appropriate, and will not be conducted in cemetery areas.
Should extensive alluviation (over 2-3 ft/60-100 cm) be detected during investigation along stream floodplains, the Contractor will recommend mechanical deep testing to identify deeply buried cultural resources. No deep or backhoe testing will be conducted.
Conduct walk-over field coverage of the remaining area (slopes over 20 percent). Walk-over field coverage consists of systematic transects to identify surface features such as burial mounds, foundations, rock shelters, lithic source areas, etc. Transect intervals shall not exceed 100 feet (30 meters).
Upon discovery of above ground remains, walk-over or visual examination intervals shall be reduced in order to adequately observe and record the remains.
When eroded or severely eroded soils are encountered, the liklihood of identifying significant sites is greatly diminished. In this instance, a reduction in the shovel testing interval may be made with approval from the Contract Officer’s Representative. Upon field verification of substantial erosion, a walk-over survey is generally adequate. Shovel tests must be periodically attempted in an effort to define intact soils. If/when an historic or prehistoric site is located, shovel testing must resume as described above to determine the nature and extent of the site.
Rockshelters shall be investigated for cultural occupation as follows: a) if cultural materials over 50 years of age can be identified and collected from the surface of the shelter floor, then no subsurface investigation is to be conducted b) if such materials are not evident on the surface, then at least one subsurface shovel test is to be excavated inside the shelter c) an additional shovel test will be necessary in the drip line or on the talus slope if the initial shovel test does not produce cultural materials. Upon identification of the first positive test, no further units will be excavated d) subsurface shovel test units shall measure 12 in. in diameter (30cm), and the contents of each shall be screened through 1/4" mesh hardware cloth e) if the rockshelter is defined as a cultural resource site, then shovel test units must be accurately mapped so they can be relocated. A rockshelter form must be completed for all rockshelters.
Subsurface testing of rockshelters may be conducted using a 1/2" soil core upon approval from the Contract Officer's Representative. If no artifacts are recovered in an overhang, then the description of the shelter should be documented on a rockshelter form and its location logged using Global Positioning System (GPS) technology with a 2-5 meter accuracy and presented in a separate Geographic Information System (GIS) “overhang” shapefile.
Unevaluated and potentially eligible previously recorded sites located in the project area will be monitored and the condition assessed. Resurvey site forms will be completed to document the field investigation.
The Contractor shall keep standard field and laboratory records including field notes, field maps, photographs, laboratory analysis records, along with coverage maps showing the location of areas actually examined and the intensity of survey coverage (location, number, and interval between shovel tests). The Contractor shall obtain state site numbers for all sites, and record each site on a state site form: "Indiana Historic Sites and Structures Inventory-Archaeological Sites". This form is now available online in the SHAARD database. The use of GPS technology with at least 2-5 meter accuracy using NAD83 datum is required for obtaining UTM locations of all sites investigated. Submeter accuracy is preferred. This data should be presented in a GIS (i.e. ArcMap) shapefile.
No surface artifact samples will be collected from historic sites unless identification is not possible in the field, items possess a high degree of scientific value or are of museum quality, are at risk due to theft or vandalism, or were recovered from shovel tests. Historic material observed, but not recovered, will be described, recorded, and mapped, or photographed. All prehistoric materials, with the exception of fire-cracked rock, will be collected and bagged separately by site location and site number. Recovered materials will be identified and analyzed. Collections will be curated at the Glenn A. Black Laboratory in Bloomington, Indiana. Curation arrangements, including cost of shipping, are the responsibility of the Contractor. Actual curation fees will be paid by the Forest Service.
C.2.1.4 -Archaeological Resources Protection Act Violations. Should the contractor observe or obtain knowledge of violations of the Archaeological Resources Protection Act, these shall be reported as soon as possible to the Contracting Officer's Representative or a Forest Service Law Enforcement Officer.
Areas in which violations are detected shall be left alone because these are potential crime scenes.
No contract work is to be conducted in these areas until the Forest Archaeologist and Forest Service Law Enforcement Officer are consulted.
C.2.1.5 – Human Remains – In the event human remains are discovered, work in the area will cease and the Contractor will immediately notify the Contracting Officer’s Representative. The Contracting Officer’s Representative will notify the Indiana Department of Historic Preservation and Archaeology and the county coroner and will work in accordance with the processes set forth in the Native American Graves Protection and Repatriation Act, the Eastern and Southern Regions of the USDA Forest Service Policy for the Treatment of Human Remains, and Indiana Law IC 14.
C.2.2 - Reports – Reports will be prepared and subbmitted in accordance with the items listed below.
C.2.2.1 -Review Draft - The Contractor shall provide two (2) copies of the review draft of the final report to the Contracting Officer's Representative before the final report is required. One copy will be forwarded by the Contracting Officer's Representative to the Indiana State Historic Preservation Office for review. The Government will compile and submit all review comments. The necessary corrections and changes shall be made by the Contractor in the final report. The draft reports will not be returned.
C.2.2.2 -Exhibits - At the same time the review draft is submitted, the Contractor shall deliver to the Contracting Officer's Representative the following Exhibits: (1) one set of Forest Service topographic maps (or CD containing GIS shapefiles) with site locations marked and identified with state site numbers; and (2) one set of "Indiana Historic Sites and Structures Inventory-Archaeological Sites" forms for each site discovered or resurveyed. All forms must include site location maps and sketch maps.
C.2.2.3 -Final Survey Report - The Contractor shall prepare, furnish, and deliver to the Contracting Officer's Representative two (2) copies of a Final Survey Report describing the survey methods, findings, conclusions, and recommendations. The report shall conform to recognized professional standards applicable to archaeological and anthropological reports. The report shall be typewritten, dowble-sided and bound in a durable cover with an identifying label on the face thereof. The paper shall be a good grade bond of size 8-1/2 x 11 inches. All pages shall be numbered. The report format and contents shall include the following:
Title Page - Include: (1) name and location of project area; (2) name and address of the Forest Service unit to which the report is sent; (3) Forest Service Cultural Resource Reconnaissance Report Number, as assigned by the Forest Archaeologist; (4) contract number and date; (5) name and address of Contractor(s); (6) name of Principal Investigator(s); (7) date of report; (8) author's signature and title.
Abstract - In one page summarize the project objectives, methods, findings, and recommendations.
Table of Contents - Arrange topical headings in sequence in accordance with corresponding page numbers. Include specific project areas and/or site numbers, for ease of use. Include a list of figures, tables, and appendices.
Introduction - Include: (1) description of project objectives; (2) location and general description of project area keyed to a vicinity map; (3) general discussion of the methods and techniques utilized; and
(4) a statement that the materials will be curated at the Glenn A. Black Laboratory in Bloomington, Indiana.
Prefield Research - Discuss prefield investigations conducted by the Contractor. Include: (1) dates of prefield research; (2) Forest Service cultural resource information; (3) early aerial photos; (4) archive and record information; (5) pertinent publications; and (6) informant information. Relevant data derived from these sources shall be discussed.
Field Research - Discuss the field investigation, and include:
(1) date(s) the area was surveyed and description of survey conditions;
(2) description of the physical features of the survey area, including topography, soils, water features, vegetation cover, ground surface visibility, and evidence of past land use or disturbance;
(3) status of cultural resources identified in prefield research;
(4) description and rationale for field methods used in the survey area, including placement of transects, areas shovel tested, transect and shovel test intervals, and description of any areas not examined.
(5) coverage maps that show actual areas surveyed by shovel testing and walkover methods.
(6) description of each cultural resource identified or reinvestigated, including:
(a) type of site
(b) physiographic location
(c) surface and subsurface features
(d) size, and methods utilized to define site limits
(e) site depth (and method of or reason for depth estimate)
(f) density and distribution of cultural materials
(g) types and quantities of cultural materials
(h) cultural affiliations, if discernible
(i) photographs/drawings of diagnostic artifacts
Preliminary Evaluation - Include a discussion of the potential significance of each identified cultural resource and provide a preliminary opinion on the eligibility of each site for the National Register of Historic Places, e.g. sites which clearly meet National Register criteria, sites which do not appear to meet eligibility criteria, and sites where further testing is warranted to determine significance. Opinions on significance of each site shall be explained and justified on the basis of National Register criteria.
Recommendations - Include for each site a recommendation of either further work or no further work required. Recommend avoidance of sites requiring further work to determine significance.
References - List the sources of non-field data incorporated in the report, including published and unpublished documents, records, and individuals interviewed or consulted.
C.2.3 -Confidential Nature of Information. The Contractor shall not divulge, and shall take all reasonable steps to insure that no member of his staff or organization divulges information on specific sites or their locations to any person other than a duly authorized representative of the Forest Supervisor unless otherwise authorized in writing by the Forest Supervisor. All services, reports, documents and material required by this contract shall become the property of the Forest Service. The results of this research may be used for theses, dissertations, research projects and publications subject to prior, written approval of the Forest Service.
C.2.4 -Curatorial Responsibilities. The Contractor shall provide acceptable arrangements at Glenn A.
Black Laboratory in Bloomington, Indiana for curation of artifacts, records, and photographs collected during the course of the project. Artifacts submitted for curation must be accompanied by site forms and a copy of the final report. All items will be submitted directly to the curation facility in accordance with the guidelines set forth by Glenn A. Black Laboratory. (Guidelines will be available from the Contract Officer's Representative or the Lab contact below). All such materials shall remain the property of the Forest Service and shall be made available to the Forest Service upon request. Glenn A. Black Laboratory is located at 423 N. Fess Street, Bloomington, Indiana 47408 (812-855-0022).
Curation costs are the responsibility of the Governement.
C.3 - PERFORMANCE SCHEDULE, INSPECTION, AND ACCEPTANCE
C.3.1 - Performance Schedule. The Draft Report and Final Report shall be submitted as follows:
C.3.1.1 - Draft Report
The Contractor, within 120 calendar days from the date of the Notice to Proceed with this contract, shall mail or otherwise deliver two (2) copies of a draft report, as described in 221 and the Exhibits required under 222 to the Contracting Officer's Representative. The draft report and Exhibits will be reviewed by the Forest Archaeologist and the Indiana State Historic Preservation Office and comments provided to the Contractor within 45 calendar days from the date it is received.
C.3.1.2 -Final Report The Contractor, within 30 calendar days from the date the draft report comments are received from the Contracting Officer's Representative, shall mail or otherwise deliver two (2) copies of the completed Final Report to the Contracting Officer's Representative. An additional copy of the report and set of site forms will be submitted to Glenn Black Laboratory for curation.
C.4 - MEASUREMENT AND PAYMENT
C.4.1 PERFORMANCE REQUIREMENTS SUMMARY
Task / Critical Subtask
Quality / Performance Standards
Acceptable Quality Level Means of Measurements
C.2.1.1 Plan of Work and Schedule
Must be 100% complete and accepted by the COR
Forest review at prework meeting at periodically throughout term of contract.
C.2.1.2 Prefield Files Search
Must be 100% complete and accepted by the COR
Forest cultural resources inventory information, SHPO records. Discussion at prework meeting.
C.2.1.3 Fieldwork Must be 100% complete and accepted by the COR
Contractor records, Forest Service and SHPO guidelines, Forest inspections. Any deficiencies will be corrected at no cost to the Government and approved by the COR.
C.2.1.4 ARPA Violation Must contact COR within 24 hours of discovery
Forest review and inspections.
C.2.1.5 Treatment of Human Remains Inadvertently Discovered
Must cease work and contact COR within 24 hours of discovery. Provide reasonable short-term protection.
Forest review and inspections.
C.2.1.3 GPS and GIS Electronic Spatial Data
The data shall be delivered to the Forest on or before the last day of the performance time as defined in the task order
The metadata fields are complete and correct and data reflects the accuracy of site and survey locations documented in the final report
C.2.2.1 Draft Report Must be 100% complete and accepted by the COR
Contractor records, Forest Service guidelines, Forest review.
C.2.1.3, Site Forms- Must be 100% complete Contractor records and data, SHPO
Task / Critical Subtask
Quality / Performance Standards
Acceptable Quality Level Means of Measurements
C.2.2.2 SHAARD and accepted by the COR guidelines, Forest review C.2.2.3 Final Report Final report received by the
COR on or before the last day of the performance time as defined in the task order. Report 100% complete and accepted by the COR with all deficiencies corrected
Review of performance time and comparison to review of draft report, meets Forest Service guidelines
C.2.4 Preparation and Curation of Collected Materials
Collected materials must be submitted to the Curation Facility in accordance with contract guidelines.
Forest review and notification from Curation Facility.
C.4.2 PAYMENT
The payment schedule shall be as follows:
50% payment-- shall be made upon submission and acceptance by the Contracting Officer's Representative of the Draft Report and receipt of the Contractor's invoice.
50% payment-- shall be made after receipt of the Contractor's invoice and upon acceptance of the Final Report by the Forest Service. Acceptance of final report is contingent upon notification that artifacts and associated report and site forms have been submitted to Glenn Black Laboratory for curation.
C.5 – OTHER REQUIREMENTS:
C.5.1 QUALIFICATIONS OF KEY PERSONNEL
Key personnel for this project must include individuals who meet the minimum professional qualifications for prehistoric and historic archaeology and architectural history, as identified in 36 CFR 61 , National Park Service Professional Qualifications Standards. These qualifications are necessary because the work identified requires ability and experience in the methods and techniques of archaeology and architectural history.
Personnel performing the work must meet the following criteria:
Principal Investigator: The minimum professional qualifications for the Principal Investigator are: 1) a graduate degree in anthropology with an archaeology emphasis, 2) demonstrated ability to carry out research to completion as evidenced by timely completion of previous contracts undertaken within the past three years and no current contracts which are past their completion dates, 3) one year of full-time professional experience in archaeological administration, research, or management relevant to Ohio Valley history and archaeology, 4) supervisory field and analytical experience and, 5) meet any current requirements of the State Historic Preservation Officer for a person functioning as a Principal Investigator.
Field Supervisors/Crew Chiefs: A minimum of a bachelor's degree in anthropology, archaeology, history or a closely related field with a minimum of 2 years general archaeological field experience and six months of previous field archaeological supervisory experience conducting similar work.
Field or Laboratory Crew: Completion of or satisfactory progress toward a bachelor’s degree in anthropology, archaeology, history or a closely related field, or six months previous experience in archaeological field or laboratory work. Completion of an archaeological field school is considered satisfactory qualification for an initial position (first archaeological job) if that individual will be constantly supervised by a higher qualified individual.
C. 5.2 SAFETY PLAN:
(a) The Contractor shall provide a copy of their safety plan at the pre-work meeting. This copy of the Safety plan shall be kept in the contract folder for OSHA’s review. The plan shall be updated as necessary for each task order issued under the contract.
(b) The Safety Plan should be available to all employees and subcontractors working on the contract.
(c) The Safety Plan should cover at a minimum:
1. Safety briefings covering the work area, equipment being used, and any special considerations for the work under the contract. Recognize that some areas may have snags and/or fire burned trees. The Contractor shall identify the specific conditions that the contractor considers a hazard. The Contractor shall update their safety plan after issuance of task orders which addresses the specific hazards of the work areas, and shall include working in areas of dead trees and falling debris.
2. Personal Protective Equipment required for the work under the contract.
3. Identify appropriate OSHA requirements for the type of work under the contract.
4. Weather considerations for the time of year of the contract.
5. Communication issues and locations of the nearest medical facilities.
6. Name and point of contact information of supervisor responsible for enforcing Safety Plan.
7. Name, position title and point of contact information of company executive responsible for approving the Safety Plan.
8. Specific contingency plans for emergencies such as medical, fire, hazard material spills and any other contract assessed hazard prevention and abatement requirement needs that apply to this project.
C. 5.3 QUALITY CONTROL PLAN:
The Contractor shall prepare a Quality Control Plan pursuant to the requirements of the Statement of Work (SOW) and FAR 52.212-4(a) for this contract and update as necessary for each task order issued under the contract. This plan sets forth the procedures and guidelines that the contractor will use to assure that the work performed under the contract is complete, accurate, and meets the requirements of the standards set forth for the contract, including, but not limited to, Class I pre-field report, fieldwork, treatment of human remains, curation of artifacts, geographic information systems spatial and tabular data, progress reports, and draft and final inventory reports.
The contractor shall conduct self-inspections in accordance with their QCP on all aspects of work, and submittals required by the SOW. Field inspections should be spread throughout a project area. For all submitted data, the contractor shall provide the Government with a method of self-inspection that conforms to generally accepted practices. This method shall be reviewed by the Government.
At no time shall the contractor rely solely upon Government inspections to provide notification of unsatisfactory performance. The Contracting Officer and/or the Contracting Officer’s Representative may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.
All Contractor quality control records shall be maintained and shall be available to the Government. All records shall be signed and dated by the person who conducted the inspection.
C.6 – SUBMITTALS:
Other than those deliverables identified elsewhere in the PWS, the following submittals are required:
1. Safety Plan: Submitted 10 days after contract award.
2. Quality Control Plan: Submitted 10 days after contract award.
3. Plan of Work/Schedule: Submitted 10 days after task order award.
Guidelines for Curating Archaeological Collections at the
Glenn A. Black Laboratory of Archaeology
Updated:
December 2013
The Glenn A. Black Laboratory of Archaeology (GBL) curates artifacts from private and public lands primarily in Indiana and neighboring states. Acceptance for curation is made on a case-by-case determination. For consideration, all curation requests must include: the name of the project, the name of the landowner(s) and/or funding/permitting agency, type of project (phase I, II, and/or III), name of the PI and employer, the county(ies) location of the project, number of sites and site numbers, approximate size of collection in cubic feet, material to be curated (e.g., prehistoric, historic, ceramics, human remains), and the start and finish dates of the project.
Prior to curation, a contract must be established between the depositor and GBL. If accepted for curation, GBL requires that all archaeological materials and associated documents arrive “shelf-ready.” Shelf-ready means that the objects and documents must be properly labeled and archivally stored upon arrival for immediate placement in curation. Standards for “shelf-ready” curation follow the general guidelines set by the National Park Service and 36CFR79 - Curation of Federally-Owned and Administered Archeological Collections (see attached and links below).
http://www.nps.gov/archeology/collections/mgt_01a.htm http://www.nps.gov/history/archeology/tools/36CFR79.htm
GBL shelf-ready requirements should also include the following additions or modifications to the NPS/Federal guidelines:
Labeling
If accepted for curation, projects and/or individual sites will be assigned a GBL accession number. Artifacts, bags, and paper labels should be marked with an accession number over a catalog number. Catalog numbers are assigned by the archaeological contractor sequentially by provenience and material type.
Ex.
Each artifact that is larger than a half inch must be labeled with an accession number and a catalog number. Objects smaller than a half inch do not have to be labeled, but we request that an attempt be made to label selected specimens within a grouping of smaller objects. For large groupings or bulk artifacts (e.g., over 200 pieces of window glass from one provenience), only 10% of the objects need to be individually labeled. If you wish to discard bulk materials (e.g., FCR), please contact the GBL Curator of Collections for the proper procedure. Objects that are too fragile or may require special treatment do not have to be labeled. Human remains are typically not labeled directly on the bone.
http://www.nps.gov/archeology/collections/mgt_01a.htm http://www.nps.gov/history/archeology/tools/36CFR79.htm
Artifacts are to be marked using a clear Acryloid B-67or 72 undercoat before marking, and a topcoat of clear Acryloid B-67 or 72 or a Gloss Medium applied to form a protective sandwich around the ink. GBL prefers Acryloid B-67 or a Gloss Medium because they do not contain any acetone, a harmful chemical for humans. A permanent archival ink (carbon based) should be used (e.g., Rapidograph Koh-l-Noor 3080F Universal Black Ink). Commercial pens, like Sharpies, are not acceptable. If the object to be labeled is a dark color, then you can use a white acrylic as an undercoat. For archival labeling supplies, see the following link:
Gaylord.com -http://www.gaylord.com/adblock.asp?abid=16720&search_by=desc&search_for=labeling%20kit&mpc=
WW
Bagging
Artifacts are to be bagged by provenience and then by material type. Bags should be a zipper-type polyethylene with 4 mil thickness. All bags should be labeled with a permanent marker (e.g., Identi-Pen), but not a Sharpie marker as these fade in light. The bag label should copy what is marked on the GBL Specimen Label or the Primary Card Label.
Ex.
GBL Specimen Label should be marked in a pencil with No. 4 or 2H lead or printed from a digital file and should also be placed in each bag. Nesting of smaller bags of the same provenience and material type into larger bags is encouraged, unless items are too fragile or too many. A Primary Card Label should be placed in these larger, nested bags. The GBL Specimen Label and the Primary Card Label must be on acid free paper, Mylar, Tyvek or Nalgene Polypaper. The labels should be visible through the bag and should not be obscured by its contents.
Bags should never be filled completely. We recommend a maximum of ¾ full.
Objects can be cushioned with acid free foam core or ethafoam blocks/sheets.
Fragile objects can also be stored in archivally safe plastic vials. A GBL Specimen Label should be placed in the vial, which should also be marked with permanent ink.
Special arrangements must be made for oversized objects that do not fit into a bag and/or curation boxes. Labeling of these materials may require a drop tag attached with a cotton string.
Bags must be perforated with a small hole (approximately 1 to 2 mm) to allow air exchange and avoid cargo sweat.
http://www.gaylord.com/adblock.asp?abid=16720&search_by=desc&search_for=labeling%20kit&mpc=WW http://www.gaylord.com/adblock.asp?abid=16720&search_by=desc&search_for=labeling%20kit&mpc=WW
Associated Documents
The GBL's current curation requirements for associated documents are:
The associated documents (e.g., reports, photos, notebooks, maps, analysis sheets, electronic databases) should be submitted at the same time with the artifacts. All should be clearly labeled with permanent archival ink or pencil with the Accession # and title of contents (e.g., Accession #11735, Final Report).
We recommend the use of pencils with No. 4 or 2H lead.
A digital and paper (acid free) copy of all associated documents should be submitted. An archival paper and electronic copy of the catalog inventory must also be provided at the time of deposit.
We accept files that are compatible with Adobe, Microsoft Office, and ArcGIS. A word searchable PDF file(s) is requested for the final report(s).
All digital images should be of medium or higher resolution (300 dpi minimum), average size (4’ x 6’), and saved as a Tiff file.
Digital files must be clearly labeled and submitted on a CD, Thumb Drive, or another transferable medium.
Paper records should be placed in archival file folders (Legal sized required).
Do not use adhesive labels. They will fall off.
Maps and other oversized paperwork should not be folded, but delivered flat or in a rolled tube.
No metal objects (e.g., stables, paperclips) should be used with the associated documents. They must be removed prior to permanent storage.
Photos (print & digital) and slides should labeled and submitted within polyethylene archival sheets. We request that you use the following:
Slides - http://www.printfile.com/index.asp?PageAction=VIEWPROD&ProdID=88 Negatives - http://www.printfile.com/index.asp?PageAction=VIEWPROD&ProdID=10 Negatives w/ Contact Sheets -http://www.printfile.com/index.asp?PageAction=VIEWPROD&ProdID=13 Prints - http://www.printfile.com/index.asp?PageAction=VIEWCATS&Category=30 Digital Images on CDs w/ Index Page -http://www.printfile.com/index.asp?PageAction=VIEWPROD&ProdID=370 http://www.printfile.com/index.asp?PageAction=VIEWPROD&ProdID=88 http://www.printfile.com/index.asp?PageAction=VIEWPROD&ProdID=10 http://www.printfile.com/index.asp?PageAction=VIEWPROD&ProdID=13 http://www.printfile.com/index.asp?PageAction=VIEWCATS&Category=30 http://www.printfile.com/index.asp?PageAction=VIEWPROD&ProdID=370
Collection Submittal Requirements
1) Deed of Gift (for collections from non-state or non-federal ownership)
2) Memorandum of Understanding for curatorial services (for federally-owned collections and other exceptional circumstances)
3) Letter of Transfer (for state-owned collections)
4) GBL Box Inventory form of all materials submitted (Inventory for artifacts and another for associated documents)
5) List of conserved objects, along with conservator’s report of conservation treatment(s) and photographic documentation
6) List of objects needing conservation treatment, with a justification of why the material was not conserved by the current project
7) List of Human Remains, Associated Burial Offerings, and Sacred Objects
8) Filled out Compliance Checklist
Curation Fees
$500 per cubic foot of artifacts
$500 per linear foot for all associated documentation per project or phases of project (e.g., Phase
I, II, III)
In lieu of a per box fee, a curation contract with a predetermined annual fee can be arranged for multi-year research programs or government agencies.
If materials and associated objects do not arrive “shelf-ready,” then an additional processing fee of $35 per hour will be assessed in order to achieve “shelf-ready” standards.
Forms Supplied by the GBL:
GBL Specimen Label GBL Primary Card Label Instructions for labeling plastic bags Compliance Checklist
WD 05-2183 (Rev.-15) was first posted on www.wdol.gov on 12/30/2014
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2005-2183 Diane C. Koplewski Division of | Revision No.: 15 Director Wage Determinations| Date Of Revision: 12/22/2014 Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Service Contract Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
States: Illinois, Indiana
Area: Illinois Counties of Edwards, Gallatin, Hardin, Lawrence, Richland, Wabash, White Indiana Counties of Brown, Crawford, Daviess, Dubois, Gibson, Greene, Jackson, Knox, Lawrence, Martin, Monroe, Orange, Owen, Pike, Washington **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 12.45 01012 - Accounting Clerk II 13.97 01013 - Accounting Clerk III 16.76 01020 - Administrative Assistant 18.38 01040 - Court Reporter 15.01 01051 - Data Entry Operator I 11.52 01052 - Data Entry Operator II 12.90 01060 - Dispatcher, Motor Vehicle 15.01 01070 - Document Preparation Clerk 13.36 01090 - Duplicating Machine Operator 13.36 01111 - General Clerk I 11.65 01112 - General Clerk II 12.71 01113 - General Clerk III 14.27 01120 - Housing Referral Assistant 17.08 01141 - Messenger Courier 11.29 01191 - Order Clerk I 11.82 01192 - Order Clerk II 14.54 01261 - Personnel Assistant (Employment) I 13.59 01262 - Personnel Assistant (Employment) II 15.21 01263 - Personnel Assistant (Employment) III 18.65 01270 - Production Control Clerk 18.58 01280 - Receptionist 12.21 01290 - Rental Clerk 13.37 01300 - Scheduler, Maintenance 13.37 01311 - Secretary I 13.37 01312 - Secretary II 14.69 01313 - Secretary III 17.08 01320 - Service Order Dispatcher 13.50 01410 - Supply Technician 19.27
3/23/2015http://www.wdol.gov/wdol/scafiles/std/05-2183.txt?v=15
01420 - Survey Worker 14.69 01531 - Travel Clerk I 12.60 01532 - Travel Clerk II 13.44 01533 - Travel Clerk III 14.25 01611 - Word Processor I 12.21 01612 - Word Processor II 13.37 01613 - Word Processor III 15.33 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 22.21 05010 - Automotive Electrician 17.67 05040 - Automotive Glass Installer 16.52 05070 - Automotive Worker 16.52 05110 - Mobile Equipment Servicer 14.71 05130 - Motor Equipment Metal Mechanic 18.35 05160 - Motor Equipment Metal Worker 16.52 05190 - Motor Vehicle Mechanic 18.35 05220 - Motor Vehicle Mechanic Helper 13.82 05250 - Motor Vehicle Upholstery Worker 15.91 05280 - Motor Vehicle Wrecker 16.52 05310 - Painter, Automotive 17.41 05340 - Radiator Repair Specialist 16.52 05370 - Tire Repairer 12.92 05400 - Transmission Repair Specialist 18.35 07000 - Food Preparation And Service Occupations 07010 - Baker 13.81 07041 - Cook I 12.15 07042 - Cook II 13.81 07070 - Dishwasher 8.88 07130 - Food Service Worker 8.88 07210 - Meat Cutter 14.66 07260 - Waiter/Waitress 9.68 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 19.64 09040 - Furniture Handler 14.99 09080 - Furniture Refinisher 19.64 09090 - Furniture Refinisher Helper 17.91 09110 - Furniture Repairer, Minor 18.81 09130 - Upholsterer 19.64 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 9.97 11060 - Elevator Operator 11.59 11090 - Gardener 14.93 11122 - Housekeeping Aide 10.85 11150 - Janitor 11.59 11210 - Laborer, Grounds Maintenance 12.06 11240 - Maid or Houseman 9.80 11260 - Pruner 12.13 11270 - Tractor Operator 14.66 11330 - Trail Maintenance Worker 12.06 11360 - Window Cleaner 11.84 12000 - Health Occupations 12010 - Ambulance Driver 14.81 12011 - Breath Alcohol Technician 14.81 12012 - Certified Occupational Therapist Assistant 20.32 12015 - Certified Physical Therapist Assistant 22.24 12020 - Dental Assistant 17.13 12025 - Dental Hygienist 33.44 12030 - EKG Technician 22.34 12035 - Electroneurodiagnostic Technologist 22.34 12040 - Emergency Medical Technician 14.81 12071 - Licensed Practical Nurse I 13.24 12072 - Licensed Practical Nurse II 14.81 12073 - Licensed Practical Nurse III 16.52
12100 - Medical Assistant 12.92 12130 - Medical Laboratory Technician 16.32 12160 - Medical Record Clerk 13.41 12190 - Medical Record Technician 14.99 12195 - Medical Transcriptionist 15.85 12210 - Nuclear Medicine Technologist 34.05 12221 - Nursing Assistant I 10.85 12222 - Nursing Assistant II 12.20 12223 - Nursing Assistant III 13.31 12224 - Nursing Assistant IV 14.94 12235 - Optical Dispenser 14.15 12236 - Optical Technician 13.24 12250 - Pharmacy Technician 14.75 12280 - Phlebotomist 14.93 12305 - Radiologic Technologist 22.95 12311 - Registered Nurse I 20.93 12312 - Registered Nurse II 25.60 12313 - Registered Nurse II, Specialist 25.60 12314 - Registered Nurse III 30.97 12315 - Registered Nurse III, Anesthetist 30.97 12316 - Registered Nurse IV 37.11 12317 - Scheduler (Drug and Alcohol Testing) 18.36 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 16.83 13012 - Exhibits Specialist II 20.32 13013 - Exhibits Specialist III 25.49 13041 - Illustrator I 16.79 13042 - Illustrator II 20.32 13043 - Illustrator III 25.49 13047 - Librarian 18.19 13050 - Library Aide/Clerk 13.09 13054 - Library Information Technology Systems 20.32 Administrator 13058 - Library Technician 13.18 13061 - Media Specialist I 14.80 13062 - Media Specialist II 16.43 13063 - Media Specialist III 18.32 13071 - Photographer I 16.97 13072 - Photographer II 19.00 13073 - Photographer III 22.94 13074 - Photographer IV 28.77 13075 - Photographer V 34.82 13110 - Video Teleconference Technician 16.49 14000 - Information Technology Occupations 14041 - Computer Operator I 13.84 14042 - Computer Operator II 15.93 14043 - Computer Operator III 18.89 14044 - Computer Operator IV 20.68 14045 - Computer Operator V 22.92 14071 - Computer Programmer I 16.10 14072 - Computer Programmer II 19.94 14073 - Computer Programmer III 24.40 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I 26.02 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 13.84 14160 - Personal Computer Support Technician 20.68 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 26.02 15020 - Aircrew Training Devices Instructor (Rated) 30.38 15030 - Air Crew Training Devices Instructor (Pilot) 34.70 15050 - Computer Based Training Specialist / Instructor 26.02
15060 - Educational Technologist 26.11 15070 - Flight Instructor (Pilot) 34.70 15080 - Graphic Artist 18.75 15090 - Technical Instructor 18.78 15095 - Technical Instructor/Course Developer 23.75 15110 - Test Proctor 15.70 15120 - Tutor 15.70 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 8.88 16030 - Counter Attendant 8.88 16040 - Dry Cleaner 11.27 16070 - Finisher, Flatwork, Machine 8.88 16090 - Presser, Hand 8.88 16110 - Presser, Machine, Drycleaning 8.88 16130 - Presser, Machine, Shirts 8.88 16160 - Presser, Machine, Wearing Apparel, Laundry 8.88 16190 - Sewing Machine Operator 12.06 16220 - Tailor 12.83 16250 - Washer, Machine 9.67 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 19.64 19040 - Tool And Die Maker 23.99 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 17.61 21030 - Material Coordinator 18.58 21040 - Material Expediter 18.58 21050 - Material Handling Laborer 11.87 21071 - Order Filler 12.57 21080 - Production Line Worker (Food Processing) 17.61 21110 - Shipping Packer 12.84 21130 - Shipping/Receiving Clerk 12.84 21140 - Store Worker I 12.53 21150 - Stock Clerk 16.41 21210 - Tools And Parts Attendant 17.61 21410 - Warehouse Specialist 17.61 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 21.80 23021 - Aircraft Mechanic I 20.76 23022 - Aircraft Mechanic II 21.80 23023 - Aircraft Mechanic III 22.87 23040 - Aircraft Mechanic Helper 15.19 23050 - Aircraft, Painter 19.66 23060 - Aircraft Servicer 17.40 23080 - Aircraft Worker 18.54 23110 - Appliance Mechanic 18.64 23120 - Bicycle Repairer 14.21 23125 - Cable Splicer 21.79 23130 - Carpenter, Maintenance 19.56 23140 - Carpet Layer 18.53 23160 - Electrician, Maintenance 23.68 23181 - Electronics Technician Maintenance I 18.53 23182 - Electronics Technician Maintenance II 19.64 23183 - Electronics Technician Maintenance III 20.76 23260 - Fabric Worker 17.41 23290 - Fire Alarm System Mechanic 20.76 23310 - Fire Extinguisher Repairer 16.29 23311 - Fuel Distribution System Mechanic 24.15 23312 - Fuel Distribution System Operator 18.93 23370 - General Maintenance Worker 16.62 23380 - Ground Support Equipment Mechanic 20.76 23381 - Ground Support Equipment Servicer 17.40 23382 - Ground Support Equipment Worker 18.54 23391 - Gunsmith I 16.29
23392 - Gunsmith II 18.53 23393 - Gunsmith III 20.76 23410 - Heating, Ventilation And Air-Conditioning 18.69 Mechanic 23411 - Heating, Ventilation And Air Contditioning 21.80 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 20.76 23440 - Heavy Equipment Operator 23.13 23460 - Instrument Mechanic 20.76 23465 - Laboratory/Shelter Mechanic 19.64 23470 - Laborer 11.18 23510 - Locksmith 19.64 23530 - Machinery Maintenance Mechanic 20.76 23550 - Machinist, Maintenance 18.23 23580 - Maintenance Trades Helper 13.91 23591 - Metrology Technician I 20.76 23592 - Metrology Technician II 21.80 23593 - Metrology Technician III 22.87 23640 - Millwright 20.76 23710 - Office Appliance Repairer 20.86 23760 - Painter, Maintenance 17.41 23790 - Pipefitter, Maintenance 25.53 23810 - Plumber, Maintenance 24.22 23820 - Pneudraulic Systems Mechanic 20.76 23850 - Rigger 20.76 23870 - Scale Mechanic 18.53 23890 - Sheet-Metal Worker, Maintenance 22.06 23910 - Small Engine Mechanic 18.53 23931 - Telecommunications Mechanic I 22.86 23932 - Telecommunications Mechanic II 24.00 23950 - Telephone Lineman 20.76 23960 - Welder, Combination, Maintenance 20.76 23965 - Well Driller 20.76 23970 - Woodcraft Worker 20.76 23980 - Woodworker 16.29 24000 - Personal Needs Occupations 24570 - Child Care Attendant 9.81 24580 - Child Care Center Clerk 12.22 24610 - Chore Aide 11.89 24620 - Family Readiness And Support Services 12.08 Coordinator 24630 - Homemaker 13.59 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 20.76 25040 - Sewage Plant Operator 19.64 25070 - Stationary Engineer 20.76 25190 - Ventilation Equipment Tender 15.20 25210 - Water Treatment Plant Operator 19.64 27000 - Protective Service Occupations 27004 - Alarm Monitor 14.31 27007 - Baggage Inspector 10.53 27008 - Corrections Officer 15.09 27010 - Court Security Officer 16.60 27030 - Detection Dog Handler 13.80 27040 - Detention Officer 15.09 27070 - Firefighter 17.29 27101 - Guard I 10.53 27102 - Guard II 13.28 27131 - Police Officer I 18.75 27132 - Police Officer II 20.81 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 12.20 28042 - Carnival Equipment Repairer 13.20
28043 - Carnival Equpment Worker 9.93 28210 - Gate Attendant/Gate Tender 14.21 28310 - Lifeguard 11.51 28350 - Park Attendant (Aide) 15.90 28510 - Recreation Aide/Health Facility Attendant 11.99 28515 - Recreation Specialist 19.69 28630 - Sports Official 12.66 28690 - Swimming Pool Operator 18.83 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 18.53 29020 - Hatch Tender 18.53 29030 - Line Handler 18.53 29041 - Stevedore I 17.41 29042 - Stevedore II 19.64 30000 - Technical Occupations 30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 35.77 30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 24.66 30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 27.16 30021 - Archeological Technician I 13.75 30022 - Archeological Technician II 15.39 30023 - Archeological Technician III 18.58 30030 - Cartographic Technician 18.58 30040 - Civil Engineering Technician 22.35 30061 - Drafter/CAD Operator I 13.75 30062 - Drafter/CAD Operator II 15.39 30063 - Drafter/CAD Operator III 17.08 30064 - Drafter/CAD Operator IV 19.44 30081 - Engineering Technician I 14.62 30082 - Engineering Technician II 14.94 30083 - Engineering Technician III 16.68 30084 - Engineering Technician IV 20.68 30085 - Engineering Technician V 25.29 30086 -…