Q&A
Obstruction Removal and Fence Construction – WRP Easement, Milam County, TX
1. Q - Has the government identified a laydown yard location?
A – Materials may be stockpiled on the easement in a location approved by the inspector
2. Q - May a camping trailer be maintained at the laydown site to provide site security if no other provision has been made.
A – Provided that it is only strictly to store materials and not utilized for or overnight accommodations.
3. Q - Will the path for the fence be surveyed and identified by the government?
A - The easement boundary is marked by a metal post and easement sign located at each corner, at angle points, and every 500 ft. on straight sections.
4. Q - Are there any special arrangements to be made for disposal of the fence that is removed?
A – The contractor is responsible for making any disposal arrangements. Removed fence must be disposed at an approved landfill and receipts provided to the inspector.
5. Q - What sort of as-built drawings are required?
A – The contractor is not required to provide As-Built Drawings. Deleted from SOW
6. Q - What final quantities details are required?
A – Deleted from SOW
7. Q - Why are final quantities details required?
A – N/A
8. Q - What is the definition of a practice unit referred to in the Fence (382) Statement of Work Deliverables comment?
A – For a fence, the practice unit is a foot of length.
9. Q - What is the definition of extreme change in slope referred to in the Fence (382) Statement of Work Deliverables comment?
A – A slope greater than eight (8) percent requires a brace assembly.
10. Q - Will progressive payments be available? And, if so will it be by CLIN or within each CLIN?
A – Progress payment can be made by CLIN as work is completed and accepted by the Government.