AG-4D90-S-16-0026_Amendment1.pdf

PDF 112 KB Posted

Attached to
Wetland Reserve Program (ACEP) Restoration - Water Control Structures - Brazoria County, Texas
Solicitation number
AG-4D90-S-16-0026
Issued by

About this file

Amendment 1 dated 7/5/2016

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-4D90-S-16-0026

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NRCS-OH-125E34

COLUMBUS OH 43215

ROOM 522

200 N. HIGH STREET

USDA-NRCS-OHIO STATE OFFICE

WASHINGTON DC 20250

NRCS-HQ-124D90

ROOM 6801-S

1400 INDEPENDENCE AVENUE, SW

USDA-NRCS CONTRACTING TEAM 4

NRCS-HQ-124D90

07/05/2016000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/13/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WRP (ACEP) Restoration - Water Control Structures. USFWS (Cumberland), 6674421000YLM, Brazoria County 48039

Solicitation is amended to incorporate noted changes to the Contract Specifications (see attachment).

This amendment also contains the Questions and Answers from the site showing.

Contractors must acknowledge receipt of this Amendment by signing one copy and returning with bid.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

CHANDA M. SOW

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation #AG-4D90-S-16-0026 Amendment 0001

AMENDMENT 1 to AG-4D90-S-16-0026 (6674421000YLM WRP):

Construction Specification 2-Clearing and Grubbing: replace the fourth paragraph under Section 7, in its entirety, with the following:

“In Section 3, Markings, Contractor shall mark proposed areas for vegetation and tree removal for approval by Engineer.”

Construction Specification 2-Clearing and Grubbing: replace the fifth paragraph under Section 7, in its entirety, with the following:

“In Section 4, Clearing and grubbing, all trees and vegetation shall be grubbed a minimum of one foot below the design subgrade (below rock riprap installation) on all designed channel sections, bottoms and side slopes. For access routes and 40-feet offsets from centerline alignments on each side, clearing shall be to existing natural grade, with grubbing as needed for vehicle and equipment passage and to blend constructed slopes with existing grade.”

Construction Specification 2-Clearing and Grubbing: replace the last sentence under Item 7.a.(2), in its entirety, with the following:

“Erect trees proposed to be removed shall be marked by Contractor and approved by Engineer.”

Construction Specification 3-Structure Removal: insert the following sentence in its entirety, between the existing second and third sentences under Item 7.a.(1):

“Buried concrete cut-off walls at existing structures, at least six inches below design subgrade of rock riprap installation, may remain if terminated smoothly and reinforcing steel is cut flush with remaining concrete.”

Construction Specification 3-Structure Removal: delete the second and third sentences, in their entirety, from Item 7.a.(2).

Construction Specification 3-Structure Removal: delete the second and third sentences, in their entirety, from Item 7.a.(3).

Construction Specification 5-Pollution Control: replace Item 8.a.(2), in its entirety, with the following:

“(2) In Section 5, Air pollution, burning is not permitted. Firebreaks or guards are not shown on the drawings.”

Construction Specification 6-Seeding, Sprigging and Mulching: replace Item 7.a.(1), in its entirety, with the following:

“(1) This item shall include placing chipped mulch on exposed soil surfaces within approved work areas and along approved access routes following construction.”

Construction Specification 6-Seeding, Sprigging and Mulching: delete the second sentence, in its entirety, from Item 7.a.(4).

Construction Specification 23-Earthfill: replace the last sentence under Item 10.a.(5), in its entirety, with the following:

“Un-compacted lifts not exceeding nine inches shall be traversed by two passes of a D6 dozer or equivalent equipment approved by Engineer.”

Construction Specification 94-Contractor Quality Control: insert the following section 10.a.(8), in its entirety:

“(8) Contractor shall schedule/sequence work to allow necessary inspections and approval by NRCS at critical points prior to proceeding. Needed NRCS inspections shall be scheduled during normal working hours, Monday through Friday, excluding federal holidays. Critical points of inspection include:

A. Following marking of proposed access routes and work area, prior to commencement of clearing and grubbing at each site.

B. Inspection of equipment, prior to mobilizing equipment to the site, as specified in Construction Specification 8.

C. Following installation of dewatering structures, prior to structure removal at each site.

D. Following completion of structure removal, prior to excavation of design channel grades at each site.

E. Following excavation of design channel grades, prior to installation of geotextile fabric and rock riprap at each site.

F. Following installation of rock riprap and prior to final grading of surrounding surfaces at each site.

G. Following final grading of surrounding surfaces and prior to mulch application at each site.

H. Following mulch application and prior to site demobilization at each site.

Delays resulting from improperly scheduled inspections, or any subsequent re-inspections, shall not be considered valid for extension of the contract time.”

Drawing Sheet 2: replace General Note 3, in its entirety, with the following:

“3. The approximate locations of the work limits, access routes, staging areas and water diversion are as specified and shown. Placement of temporary access roads, staging areas and other facilities must avoid and limit disturbance to existing vegetation and habitat as much as possible.”

Drawing Sheet 7: replace Water System Diversion Note 2.1, in its entirety, with the following:

“2.1 If applicable, fish shall be removed in the vicinity of the diversion dam by a qualified biologist.”

Drawing Sheet 8: replace Construction Note 2, in its entirety, with the following:

“2 Clearing and grubbing work shall be limited to marked/approved areas as specified. All practical precautions shall be taken to avoid damage or disturb large (greater than one-foot diameter breast-height (dbh)). All trees and vegetation shall be grubbed a minimum of one foot below the design subgrade (below rock riprap installation) on all designed channel sections, bottoms and side slopes. For access routes and 40-feet offsets from centerline alignments on each side, clearing shall be to existing natural grade, with grubbing as needed for vehicle and equipment passage and to blend constructed slopes with existing grade. All removed trees and vegetation shall be mulched for application as specified. Any cuts, skins, scrapes or bruises to the bark of large oak trees shall be immediately trimmed and sealed according to locally accepted nursery practices.”

Drawing Sheet 8: replace the 15th sentence in Construction Note 5 regarding equipment passes for compaction, in its entirety, with the following:

“The entire surface of each un-compacted lift shall be traversed by two passes of a D6 dozer or equivalent equipment approved by Engineer.”

Drawing Sheet 10: replace General Note 3, in its entirety, with the following:

“3. The approximate locations of the work limits, access routes, staging areas and water diversion are as specified and shown. Placement of temporary access roads, staging areas and other facilities must avoid and limit disturbance to existing vegetation and habitat as much as possible.”

Drawing Sheet 15: replace Water System Diversion Note 2.1, in its entirety, with the following:

“2.1 If applicable, fish shall be removed in the vicinity of the diversion dam by a qualified biologist.”

Drawing Sheet 16: replace Construction Note 2, in its entirety, with the following:

“2 Clearing and grubbing work shall be limited to marked/approved areas as specified. All practical precautions shall be taken to avoid damage or disturb large (greater than one-foot diameter breast-height (dbh)). All trees and vegetation shall be grubbed a minimum of one foot below the design subgrade (below rock riprap installation) on all designed channel sections, bottoms and side slopes. For access routes and 40-feet offsets from centerline alignments on each side, clearing shall be to existing natural grade, with grubbing as needed for vehicle and equipment passage and to blend constructed slopes with existing grade. All removed trees and vegetation shall be mulched for application as specified. Any cuts, skins, scrapes or bruises to the bark of large oak trees shall be immediately trimmed and sealed according to locally accepted nursery practices.”

Drawing Sheet 16: replace the 15th sentence in Construction Note 5 regarding equipment passes for compaction, in its entirety, with the following:

“The entire surface of each un-compacted lift shall be traversed by two passes of a D6 dozer or equivalent equipment approved by Engineer.”

Site Showing Q&A:

Question: Will safety meetings require a daily report?

Answer: No. Reference Item 1.5 in Section H.2. of the Solicitation. Written daily records of QC activities should reference completion of site safety meetings for those particular days.

Question: How will “rain days” be added to the time of performance?

Answer: It was expected that rain days will be added to the period of performance on a one-for-one basis, performance time will be extended one day for each rain day.

Question: Will “rain days” have to be called from on-site?

Answer: Calling of rain days will be on a case-by-case basis. In cases of multiple concurrent days of rainfall, there should not be a need to physically drive out to the site to verify conditions. However, singular, localized events will require on-site determination.

Question: What is the allowable working schedule?

Answer: The allowable work schedule is not to exceed six days per week, ten hours per day.

Question: Will copies of certified payroll be required for progress payments?

Answer: Yes. Reference I.2(b)(5) of the Solicitation.

Question: Is seeding included in the scope of work?

Answer: No. Construction Specification 6 – Seeding, Sprigging and Mulching is included to address mulching as needed for disposal of woody materials removed for site access.

Question: If insufficient mulch is made to meet the specified coverage and thickness, can other materials be used?

Answer: Mulch will be applied as specified, to the extent that available materials allow.

No additional materials or mulching is expected.

Question: Is it acceptable to review progress payment applications initially on-site with inspector with regard to work completed, quantities delivered?

Answer: Yes.

Question: Will rock proposed for use be tested by soaking?

Answer: Yes. Type 2 rock is specified. Material Specification 523 establishes applicable tests (and ASTM designations) for specific gravity, absorption, and soundness.

Question: Do the rock tests have to be completed within a certain time frame?

Answer: As long as the provided test results are representative of the specific material proposed for delivery and use, there are no “expiration dates” on test results. Written notice of the proposed source of rock is required five working days prior to delivery (Construction Specification 61, Item 8.(2)). Certified gradation analysis is required prior to delivery on site (Construction Specification 61, Item 8.(3)).

Question: Can the designated QC person also work productively on the project?

Answer: Yes, to the extent it does not interfere with required QC responsibilities.

Question: Is there an engineer’s estimate of cost for the project?

Answer: Yes, the published range of estimated cost noted by the solicitation is $250k- $500k.

Question: Will access routes have to be cut in to the sites through the woods?

Answer: Yes, reference Item 7 of Construction Specification 2.

Question: If the lake level rises, will the water flow towards the work sites?

Answer: Yes.

Question: Will water have to be pumped away from work areas?

Answer: Yes. Dewatering as necessary to install the work is required. Coffer dam installation is also expected. Reference Construction Specification 11 and Drawing Sheets 7 and 15.