NRCS – 04/2105 8 ‐ 2

TN – ROGERSVILLE REALTY WRP

4. ITEMS OF WORK AND CONSTRUCTION DETAILS

Items of work to be performed in conformance with this specification and the construction details are:

Bid Item 1, Mobilization and Demobilization

(1) This item shall consist of the mobilization and demobilization of the Contractor's forces and equipment necessary to perform the work required under the contract. This item shall also include all work required to provide and maintain temporary construction access to the site.

(2) The Contractor is responsible for any damages caused by his forces to fences, gates, access roads, railroad crossing, utilities, existing drainage pipes, culverts, and other structures that may be located on the surface, subsurface, or adjacent to the access road used to gain access to the project site, and on the surface, subsurface, or adjacent to the project easement site. All damaged items shall be repaired or replaced by the Contractor at their expense to equal or better quality than what existed prior to the commencement of work under this contract.

(3) In Section 3, Payment, payment shall be made by contracted lump sum payment with partial payments as work proceeds as described in Section 3 of this specification. Such compensation will constitute full payment for all items included in Bid Item 1, Mobilization and Demobilization.